KitLog pro

Powered By Kitlog Pro v2.0

"THE OTHER WOMAN"
Work Logs Found: 122
Category Work Time: 195 Hours
 Date
Hours
Work Log Summary

Details

 10-28-2007
1.00
Panel prep
Details
       

 03-01-2006
3.00
Static hose run
Details
       

 09-17-2005
3.00
Finished the Aft fuselage skin.
Details
       

 09-17-2005
2.00
Aft fuselage skin Dimple
Details
       

 09-15-2005
1.50
Fuselage Aft top Skin
Details
       

 09-15-2005
1.50
Aft fuselage skin
Details
       

 07-28-2005
2.00
Fuselage and Firewall
Details
       

 07-21-2005
1.50
Fuselage adjustments
Details
       

 07-16-2005
1.00
Rear fuselage access panels
Details
       

 06-05-2005
0.50
Static line RTV
Details
       

 05-25-2005
1.50
Static line install
Details
       

 05-19-2005
1.00
Static Port install
Details
       

 05-19-2005
0.20
Static port 2
Details
     

 04-16-2005
1.00
Paint Vent duct
Details
       

 04-14-2005
2.00
Brake Lines
Details
       

 02-22-2005
2.00
One installed between Fuel Pump and Sel.
       

 02-22-2005
1.50
Build AeroQuip Fuel Lines for Cabin
Details
       

 02-15-2005
2.00

       

 02-12-2005
2.00
More Dimpling of AFT SKIN
Details
       

 02-08-2005
3.00
Dimpled Aft fus skin
Details
       

 02-06-2005
3.00
Tank Vent lines
Details
       

 02-06-2005
1.00
Made Vent fittings
Details
       

 02-05-2005
1.00
Finished Rudder peddal
Details
       

 02-05-2005
2.00
Brake lines
Details
       

 02-02-2005
0.10
Aircraft Spruce shipment
Details
       

 02-01-2005
1.00
Fuselage Brake line fitting
Details
       

 01-30-2005
1.00
Vent installation
Details
       

 01-30-2005
1.00
Vent 3
Details
       

 01-30-2005
2.00
Side vents
Details
       

 01-30-2005
2.00
Seat fitting
Details
       

 01-29-2005
1.00
Seats arrive
Details
       

 01-29-2005
3.00
Seat Back trim
Details
       

 01-25-2005
1.00
Fuel selector 2
Details
       

 01-25-2005
2.00
Forward Tank Bracket
Details
       

 01-25-2005
2.00
Brake lines
Details
       

 01-24-2005
1.00
Fuel selector
Details
       

 01-23-2005
2.00
Rudder Cable threading
Details
       

 01-23-2005
1.00
Rudder cable 2
       

 01-19-2005
2.00
AFT skin stiffners
Details
       

 01-18-2005
2.00
Matched Drilled Aft skin
Details
       

 01-17-2005
2.00
Brake Lines to Parking Brake
Details
       

 01-17-2005
1.00
Brake lines
Details
       

 01-17-2005
1.00
AFT top skin mount
Details
       

 01-15-2005
2.50
Parking brake bracket
Details
       

 01-15-2005
1.00
Brake line braket
Details
       

 01-08-2005
1.00
Tank Bracket
Details
       

 01-08-2005
1.50
Tank attach bracket
Details
       

 01-08-2005
2.00
Tank attach bracket
Details
       

 01-05-2005
2.00
Elevator forward pushrod
Details
       

 01-03-2005
1.00
Control system
Details
       

 01-03-2005
2.00
Control System
Details
       

 01-01-2005
1.00
Flap sensor mounting.
Details
       

 01-01-2005
0.20
Flap sensor
Details
       

 01-01-2005
2.00
Flap position sensor mount
Details
       

 01-01-2005
1.50
Baggage Floor work
Details
       

 12-31-2004
2.00
Finished steps
Details
       

 12-31-2004
2.00
Finished steps
Details
       

 12-31-2004
2.00
Baggage floor
Details
       

 12-30-2004
1.00
Rt Step fix for gap.
Details
       

 12-30-2004
1.00
Lt step More finish work
Details
       

 12-30-2004
0.50
Lt step finish
Details
       

 12-30-2004
1.00
Lt step
Details
       

 12-29-2004
2.00
Lt Step
Details
       

 12-29-2004
0.20
LT Step
Details
       

 12-29-2004
1.00
Lt Step
Details
       

 12-29-2004
0.50
Lt step
Details
       

 12-29-2004
1.50
LT step
Details
       

 12-28-2004
1.00
Forward Fuselage assembly
Details
       

 12-26-2004
2.00
Rt step work
Details
       

 12-26-2004
2.00
More step
Details
       

 12-26-2004
2.00
More Rt step work
Details
       

 12-25-2004
2.00
Rt step installation
Details
       

 12-08-2004
0.50
More Landing gear mount
Details
       

 12-08-2004
0.50
Main Gear final torquing and Torque seal
Details
       

 12-07-2004
1.00
Tri Gear brake bracket
Details
       

 12-07-2004
1.00
Installed brake reservoir
Details
       

 12-07-2004
1.00
Brake reservoir install
Details
       

 12-06-2004
1.50
Forward covers
Details
       

 12-06-2004
1.50
Firewall rescess panel and stiffners
Details
       

 12-05-2004
1.00
Questioned some potential cracks
Details
       

 12-05-2004
2.00
More paint on Elevator Push rods
       

 12-05-2004
2.00
Cabin parts paint
Details
       

 12-03-2004
2.00
LT Landing Gear Mount
Details
       

 12-03-2004
2.00
LT Gear Mount
Details
       

 12-02-2004
1.00
Rt Landing Gear Mount
Details
       

 12-01-2004
1.00
RT Landing Gear Mount
Details
       

 12-01-2004
1.50
Rt Landing Gear Mount
Details
       

 11-29-2004
2.50
Flap Acuator and Tunnel cover
Details

 11-25-2004
3.00
Flap Actuator Assembling
Details
       

 11-25-2004
3.00
Flap Actuator
Details
       

 11-25-2004
3.00
Flap Actuator
Details
       

 11-24-2004
3.00
Flap Acuator
Details
       

 11-23-2004
1.00
Installed Flap Actuator Weldment
Details
       

 11-23-2004
1.00
Flap Actuator
Details
       

 11-23-2004
1.00
Drill and Tapped Flap Push Rods
Details
       

 11-21-2004
1.00
Painted Elevator rods
Details
       

 11-21-2004
0.50
More cabin cover pics
       

 11-21-2004
1.00
Installed Cabin cover
Details
       

 11-21-2004
2.00
Center cabin cover
Details
       

 11-20-2004
1.00
Blind riveted Elevator tubes
Details
       

 11-19-2004
3.00
Tunnel cover install
Details
       

 11-18-2004
2.00
Fit and drilled front elevator Push rod
Details
       

 11-18-2004
2.00
Assembled Tunnel cover
       

 11-17-2004
1.00
Installed Control stick in the cabin
Details
       

 11-17-2004
2.00
Control Stick Hardware
Details
       

 11-16-2004
1.00
Fitted seats after riveting
Details
       

 11-16-2004
4.00
Cut Elevator Pushrods
Details
       

 11-14-2004
3.00
Painted parts
Details
       

 11-14-2004
1.00
Installed Bellcrank
Details
     

 11-13-2004
3.00
Seat Back adjustments
Details
       

 11-13-2004
2.00
Finished Seat Pans
Details
       

 11-13-2004
2.00
Assembled Seat backs before painting
Details
       

 11-12-2004
2.00
Seat Work
Details
       

 11-12-2004
3.00
More Seat work
Details
       

 11-09-2004
2.00
Push rod Bell Crank
Details
       

 10-01-2004
1.00
Brake/Cylinders on Rudder
Details
       

 10-01-2004
1.00
Assemble Brakes/Cylinders on rudder
Details
       

 09-30-2004
1.00
Drilled Lightening holes
       

 09-30-2004
1.00
Brake/Rudder pedal construction
Details
       

 09-30-2004
1.00
Assembled brake pads
Details
       

 09-29-2004
3.00
Drilled holes in skin stiffner
Details
       

 09-27-2004
2.00
Installing Rudder and Brake Pedals
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.