KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
Work Logs Found: 52
Category Work Time: 251 Hours
 Date
Hours
Work Log Summary

Details

 03-22-2017
8.00
Sand and buff, sand and buff, sand and buff

 03-21-2017
8.00
Preped and clear coated wheel coverings

 03-20-2017
8.00
Painted the white base coat on the wheel pants

 03-17-2017
2.00
Put on first light coat of primer

 03-14-2017
8.00
Glased pinholes and sanded wheel pants and legs

 03-13-2017
2.50
Buffing vert stabilizer and upper and lower cowl

 03-10-2017
6.00
Preped and clearcoated lower cowl, and rudder

 03-09-2017
8.00
Paint cowlings, and vertical stabilator
       

 03-08-2017
9.00
Two more coats of primer. Sand. Fill pin holes, ..

 03-07-2017
10.00
Prepping and finally etch coat and ptimer coats

 03-06-2017
8.00
Buffing canopy and vert stab. Install canopy
     

 03-03-2017
6.00
clear coated. Got some runs. Will have to sand a

 03-02-2017
2.00
Painted base coat Blue on Cnopy, rudder, Vert Stat
       

 03-01-2017
8.50
Paint prep, etching primer, grey primer
       

 02-28-2017
8.00
Prepping for paint
       

 02-08-2016
5.00
Cleanup

 02-06-2016
4.00
Clearcoated the fuselage
     

 02-05-2016
8.00
Touch up white and paint red stripe
       

 02-04-2016
5.00
Paint blue then white
       

 02-03-2016
2.00
Sand primer

 02-02-2016
5.00
Sand and paint more primer

 02-01-2016
4.00
Etch primer and gray primer'd the fuselage
     

 01-30-2016
2.00
masking and cleaning fuselage readying for paint

 10-20-2015
3.00
Buff and add the blue stripe accent to wing tips
     

 10-16-2015
2.00
paint red stripe and top coat wing tips
     

 10-15-2015
5.00
Paint white and tape for red stripe on wing tips

 10-14-2015
6.00
Prime, Sand, reprime both wing tips
     

 10-12-2015
2.00
Finish buffing the R. wing

 10-08-2015
7.00
Buffing and polishing right wing

 10-05-2015
2.50
R wing buff and polish

 10-02-2015
3.50
Clear coated the R. wing, aileron and flap
     

 10-01-2015
3.00
fillking and prepping a dent in the R. aileron

 09-30-2015
4.00
Painted R wing with primer and with base coat.

 09-29-2015
5.00
Prep R wing and spray etching primer

 09-28-2015
5.00
Buffing Left wing

 09-25-2015
1.00
Make pattern for wing tip stripe

 09-24-2015
4.00
Prep and re clear coat the bottom of the left wing

 09-23-2015
4.00
Painted and clear coated top of the left wing
     

 09-22-2015
5.00
Sand and paint primer on L wing top

 09-21-2015
4.50
Sanding down the wing

 09-18-2015
6.00
Tried sanding down and repainting top of L wing
Details

 09-14-2015
3.00
Color and clearcoat left wing
     

 09-11-2015
4.00
More primer on L wing

 09-02-2015
5.00
Primer and sanding
Details

 09-01-2015
2.50
Sand primer and clean - prepping for the color coa

 08-31-2015
3.50
Undercoat L wing
     

 08-26-2015
5.00
more prepping for paint
     

 08-25-2015
2.00
Paint prep and add an exhaust fan to the paint boo
     

 05-26-2015
3.00
Buff the Horz stab
     

 05-21-2015
4.50
Prep and paint for redo of horiz stab.

 05-14-2015
3.00
Wash, etch, and undercoathorz stab and elevators
       

 05-13-2015
6.00
Prep to paint horz. stab and elevators
     










Copyright © 2001-2024 Matronics. All Rights Reserved.