KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
Work Logs Found: 14
Category Work Time: 68 Hours
 Date
Hours
Work Log Summary

Details

 01-06-2016
3.00
Gear dampeners, Flap hinge wires
Details
       

 07-30-2015
5.00
Wheel pants, emp. fairing, engine delivery
Details
       

 07-29-2015
5.00
Wheel/Intersection fairings
Details
       

 07-28-2015
5.00
Glass whlle and intersection fairings
Details
       

 07-27-2015
4.50
Left wheel fairing, lower intersection fairings
Details
       

 07-24-2015
2.00
Wheel fairing
Details
       

 07-23-2015
4.00
Wheel fairings
Details
       

 07-15-2015
5.50
Right wheel fairing
Details
       

 07-14-2015
4.50
Left wheel fairing
Details
       

 07-13-2015
6.00
Leg fairing alignment, wing tips
Details
       

 06-25-2015
6.50
Leg fairing and wingtips
Details
       

 06-24-2015
6.00
Brake line, fairings
Details
       

 06-22-2015
6.50
Install landing gear
Details
       

 05-13-2015
4.00
Wheels and brakes
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.