Powered By Kitlog Pro v2.0
Brendons Kit Log
RV-10
Flaps
Work Logs Found:
12
Category Work Time:
42 Hours
Date
Hours
Work Log Summary
Details
10-15-2017
6.00
Flap System
12-26-2014
4.00
Finish right flap
Details
12-23-2014
3.00
Right Flap Top Skin
Details
12-12-2014
4.00
Right Flap Assembly
Details
11-15-2014
3.00
Left Flap - Trailing Edge
Details
11-08-2014
3.00
Assembly left flap
10-05-2014
4.00
Prime Flap Parts
10-04-2014
4.00
Prepare Flap Parts for Priming
Details
09-23-2014
2.00
Cleco and Final Drill Right Flap Assembly
09-09-2014
1.00
Countersink flap trailing edge
Details
09-06-2014
4.00
Flap final drilling
Details
08-23-2014
4.00
Flap Part Preparation
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
488
1672
Aileron
8
34
Doors
16
83
Electrical
16
66
Elevator
24
64
Empennage
15
56
Engine
17
72
Finishing
37
109
Firewall
4
11
Flaps
12
42
Fuel Tanks
17
92
Fuselage
130
461
HS
18
54
Inspection
1
Interior
15
64
Landing Gear
5
19
Miscellaneous
1
Moving
3
8
Panel
5
16
Practice
5
8
Prop
6
12
Rudder
13
34
Tailcone
32
78
Tools
1
VS
11
26
Windows
9
41
Wing - LEFT
28
87
Wing - RIGHT
22
69
Wings
17
66
Copyright © 2001-2024 Matronics. All Rights Reserved.