Powered By Kitlog Pro v2.0
Steves S-20 Build Site.
S-20 Raven
Wings
Work Logs Found:
32
Category Work Time:
139 Hours
Date
Hours
Work Log Summary
Details
03-26-2019
3.00
Jury Struts.
Details
03-24-2019
6.00
Installed the Wings!
Details
03-20-2019
5.00
Assembly of Wing Struts.
Details
03-18-2019
2.00
Getting wings ready for mounting.
Details
03-16-2019
6.00
Wing Tips.
Details
03-15-2019
4.00
Covering the Root End Close Outs.
Details
03-14-2019
4.00
Made Root Close Out Panels.
Details
02-24-2019
1.00
Fitting of the flap cable closeout.
Details
02-23-2019
6.00
Fit the Flap Gap Seals
Details
02-22-2019
6.00
Install Flaps and Ailerons.
Details
11-05-2016
3.00
Painted and Installed Aileron Mounts.
Details
08-23-2015
3.00
Fabricate Wing Stand.
Details
08-22-2015
3.00
Run Wires For The Strobe Lights.
Details
08-22-2015
3.00
Installed Pitot Tubing.
Details
08-19-2015
3.00
Teleflex, Flaps, and Trim Tab.
Details
08-13-2015
5.00
Filled Glued Edges and Installed Pitot Tube.
Details
08-06-2015
2.00
Stabilizer Ribs.
Details
08-06-2015
2.00
Gluing The Root Skins - Part 2.
Details
08-02-2015
2.00
Glued Upper Root Skins.
Details
08-02-2015
2.00
Fabricated New GPS Mount.
Details
08-01-2015
6.00
Gued Leading Edge Wrap.
Details
07-30-2015
6.00
Tip Skins and Leading Edge Wrap.
Details
07-27-2015
3.00
Install Tanks and Lower Root Skins.
Details
07-16-2015
2.00
Fuel Tanks Fittings.
Details
07-15-2015
4.00
Fuel Tank Caps.
Details
07-11-2015
8.00
Root Skins and Fuel Tanks.
Details
06-21-2015
6.00
More Wings Assembly.
Details
06-20-2015
12.00
Assemble Wings
Details
06-19-2015
3.00
More Wing Frames.
Details
06-10-2015
6.00
Wing Frames
Details
06-07-2015
6.00
Started the Wings
Details
04-24-2015
6.00
Rib Work
Details
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
197
1269
Avionics
10
79
Covering
41
384
Empennage
1
5
Engine
4
11
Fuselage
55
225
Miscellaneous
26
156
Painting
27
268
Prop
1
2
Wings
32
139
Copyright © 2001-2024 Matronics. All Rights Reserved.