Powered By Kitlog Pro v2.0
Dan's Web Site
RV-7A
Fuel System
Work Logs Found:
28
Category Work Time:
36 Hours
Date
Hours
Work Log Summary
Details
07-11-2011
0.50
Connect Right Tank Fuel Line
Details
07-11-2011
0.50
Connect Left Tank Fuel Line
Details
10-23-2010
2.00
Secure Right Side Primer Lines with Adel Clamps
Details
10-23-2010
2.00
Secure Left Side Primer Lines with Adel Clamps
Details
10-23-2010
2.00
Install Fuel Flow Sensor
Details
04-24-2010
1.00
Install Right Side Primer Fittings / Fab SS Lines
Details
04-24-2010
1.00
Install Right Side Cylinders 1 & 3 Brass T Fitting
Details
04-24-2010
1.00
Install Left Side Primer Fittings / Create Templat
Details
04-24-2010
1.00
Install Left Side Cylinders 2 & 4 Brass T Fittings
Details
04-24-2010
1.00
Bend / Install Stainless Steel Primer Lines 2 & 4
Details
05-13-2009
1.00
Remove Primer Valve Bracket from Firewall
Details
05-12-2009
1.00
Move Primer Valve to Top of Gascolator
Details
05-11-2007
0.50
Install Primer Line from Gascolator to Valve
Details
05-09-2007
1.50
Fabricate and Install Bracket for Primer Valve
Details
03-22-2007
1.00
Install Firewall Forward Fuel Lines
Details
11-12-2006
1.50
Fabricate/Install Line from Valve to Elec Pump
Details
07-05-2006
1.00
Rivet Angle to Andair Fuel Valve Cover
Details
06-13-2006
1.00
Install Fuel Pump, Gascolator Fittings
Details
10-23-2005
1.00
Proseal Screens to Vent Fittings
Details
08-21-2005
0.50
Flare and Install Outboard Fittings
Details
08-20-2005
0.25
Cut External Portion of Fuel Line to Len
Details
08-14-2005
0.75
Bend/Flare/Connect Selector Valve Ends
Details
08-14-2005
0.75
Bend/Flare/Connect Selector Valve Ends
Details
08-13-2005
1.50
Adjust 3/8" Fuel Lines: Valve to Tanks
Details
06-02-2005
2.00
Finish Right Tank Vent; Trim Brake Pedal
Details
05-30-2005
1.00
Run 1/4" Right Fuel Vent Tubing
Details
05-29-2005
4.00
Run 1/4" Left Fuel Vent Tubing
Details
05-24-2005
4.00
Run 3/8" Tank-to-Valve Tubing
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1974
2363
Ailerons
35
56
Assembly
5
6
Avionics
4
4
Baffles
134
110
Big Dig
8
Brakes
23
26
Canopy
64
83
Canopy Frame
144
152
Cowl
68
74
Electrial
120
96
Electrical
120
96
Elevator
58
90
Empennage
30
48
Engine
64
42
Filtered Air Box
26
22
Finish Kit
4
4
Firewall Forward
27
24
Flaps
50
64
Forward Fuselage
44
53
Fuel System
28
36
Fuselage
294
460
Gear
32
38
Hangar
2
Hardware
5
4
Horizontal Stabilizer
42
60
Left Aileron
4
6
Left Flap
3
2
Left Fuel Tank
38
68
Left Wing
90
117
Paint
1
0
Panel
39
47
Photo Shoot
25
2
Prop
4
4
Right Aileron
2
2
Right Flap
3
2
Right Fuel Tank
43
60
Right Wing
84
102
Rudder
16
30
Rudder II
31
54
Seats
9
21
Service Bulletin: No
7
6
Spinner
17
15
Systems
1
0
Training
3
Vertical Stabilizer
23
31
Wings
100
146
Copyright © 2001-2024 Matronics. All Rights Reserved.