RV-10 by Nick Nyenhuis jr.
RV-10
Electrical
Work Logs Found:
22
Category Work Time:
69 Hours
Date
Hours
Work Log Summary
Details
12-22-2021
2.80
Conduit runs in baggage are
02-15-2019
1.00
Conduit running
02-09-2019
1.10
Conduit running
12-27-2018
1.30
Wiring brackets on side skins
Details
12-26-2018
1.80
Flap switches
12-07-2018
3.70
Wiring clamps in flap control area
12-03-2018
3.80
Flap position sensor
12-01-2018
3.30
Flap limit switches
11-30-2018
3.80
Flap limit switches
Details
11-27-2018
2.50
Flap limit switches
Details
11-26-2018
3.20
Flap limit switches
Details
11-24-2018
4.00
Flap control electrical
Details
11-07-2018
1.80
Electrical conduit planning
11-05-2018
7.30
Wiring clamp mounts
05-15-2018
3.30
Eelectrical planning
05-12-2018
4.10
Electrical clamp brackets
05-11-2018
3.30
Electrical planning
04-16-2018
3.00
Electrical planning
01-13-2018
3.50
Determining wire runs
11-05-2016
2.00
Testing the fuel guage levels
Details
04-07-2014
3.00
Wire route planning
Details
01-11-2013
5.50
Tailcone wire run design and disassemble
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
535
1769
Administration
1
2
Ailerons
15
51
Brakes and Wheels
7
21
Control System
18
64
Electrical
22
69
Elevators
34
116
Empennage Misc
8
19
Flaps
21
84
Fuel System
9
23
Fuel Tanks
37
137
Fuselage
164
580
Horizontal Stab
28
73
Miscellaneous
9
28
Panel
2
6
Rudder
19
46
Shop/Tools
21
39
Tailcone
32
109
Vertical Stab
13
37
Wings
75
265
Copyright © 2001-2024 Matronics. All Rights Reserved.