Powered By Kitlog Pro v2.0
Steves S-20 Build Site.
S-20 Raven
Miscellaneous
Work Logs Found:
26
Category Work Time:
156 Hours
Date
Hours
Work Log Summary
Details
05-18-2019
6.00
Painted Station 3 closeout.
Details
04-17-2019
2.00
Fit Up Root Gap Seals.
Details
04-07-2019
6.00
Fit up the skylight.
Details
04-06-2019
4.00
Installing Skylight Ribs
Details
04-02-2019
3.00
Wiring - Wing Tips, Thermocouple, Compass.
Details
07-22-2018
3.00
New ADSB and drain lines.
Details
03-15-2017
10.00
Mounting of misc items
Details
11-13-2016
2.00
Trim door for fit.
Details
11-12-2016
6.00
Fixing front door strip.
Details
11-11-2016
6.00
Fixing the door strips. - Part 4.
Details
11-10-2016
6.00
Fixing the door strips. - Part 3.
Details
11-09-2016
6.00
Fixing the door strips. - Part 2.
Details
11-08-2016
6.00
Fixing the door strips. - Part 1.
Details
11-07-2016
0.10
Life gets in the way.
Details
07-24-2016
10.00
Paint Booth - Part 2.
Details
07-17-2016
10.00
Paint Booth - Part 1.
Details
04-22-2016
16.00
Built Paint Booth.
Details
01-24-2016
10.00
Built Wing Stands.
Details
10-07-2015
3.00
Covering Rack and Table.
Details
10-04-2015
20.00
Covering The Test Frames.
Details
10-01-2015
3.00
Irons!
Details
04-20-2015
2.00
Starting Small
Details
04-19-2015
9.00
Assemble Parts Board
Details
04-11-2015
2.00
Unloading the kit.
Details
04-10-2015
4.00
Travel to RANS to pick up kit.
Details
04-04-2015
1.00
Installed Kitlog Pro
Details
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
197
1269
Avionics
10
79
Covering
41
384
Empennage
1
5
Engine
4
11
Fuselage
55
225
Miscellaneous
26
156
Painting
27
268
Prop
1
2
Wings
32
139
Copyright © 2001-2024 Matronics. All Rights Reserved.