Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Canopy
Work Logs Found:
12
Category Work Time:
37 Hours
Date
Hours
Work Log Summary
Details
03-21-2019
1.00
Fabricated and installed canopy seat plate
Details
07-05-2017
1.00
Installed windscreen
Details
06-10-2015
4.00
Drilled and trimed aft canopy skirt
Details
06-01-2015
4.00
Canopy Plexiglass installation trick
Details
05-29-2015
2.00
Trimed aft edge of canopy
Details
05-27-2015
8.00
Reinforced the roll bar
Details
04-26-2015
2.00
Drilling Conopy frame
Details
04-17-2015
8.00
Started Canopy
Details
04-17-2015
4.00
Fit the conopy frame to the sliders
Details
03-14-2015
1.00
Drilled the windshield capture strip
Details
03-13-2015
1.00
Drilled the roll bar
Details
03-12-2015
1.00
Positioned the Windshield
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.