Powered By Kitlog Pro v2.0
LEWIS'S WEB SITE
S20 Raven
Painting
Work Logs Found:
58
Category Work Time:
234 Hours
Date
Hours
Work Log Summary
Details
12-24-2016
1.50
paint wing root panels
Details
12-23-2016
2.50
Prime wing root panels and mating strips for skyli
Details
12-20-2016
1.50
Paint top of boot cowl
Details
12-13-2016
1.00
paint left aileron and flap cable exit covers
Details
09-03-2016
5.50
Paint struts
Details
08-21-2016
6.50
Paint black on left wing, bottom cowl and flap
Details
08-14-2016
5.50
Paint red on left wing and flap
Details
08-10-2016
6.00
Paint left wing, flap and aileron
Details
08-06-2016
5.50
Paint stripes on doors
Details
07-31-2016
5.50
Paint black on right wing and flap
Details
07-29-2016
6.50
Paint red on right wing
Details
07-23-2016
6.50
Paint right wing, flap and aileron
Details
07-21-2016
3.00
Prime right wing
Details
07-09-2016
5.00
Paint cowling
Details
07-03-2016
6.00
Prep on cowling
Details
07-02-2016
6.00
Sand and prime on cowling
Details
06-04-2016
7.00
work on cowling
Details
06-03-2016
3.00
Work on cowling
Details
06-02-2016
3.00
Cowling work
Details
06-01-2016
3.00
Cowling work
Details
10-27-2015
5.00
Paint inside doors
Details
10-26-2015
5.50
Paint tail surfaces
Details
10-24-2015
3.00
Paint doors
Details
10-23-2015
4.50
Paint right stabilizer and elevator
Details
10-22-2015
5.00
Paint left elevator and stabilizer
Details
10-08-2015
3.00
Spray prime doors
Details
10-06-2015
5.50
Paint rudder
Details
10-05-2015
4.00
tape one side of rudder for checkerboard
Details
10-04-2015
4.00
tape rudder checkerboard
Details
09-30-2015
3.00
prime door parts
Details
09-10-2015
4.00
Paint stripes on boot cowl
Details
09-09-2015
3.00
Paint red on boot cowl
Details
09-07-2015
5.00
Paint silver on boot cowling
Details
09-06-2015
5.50
Paint boot cowl
Details
09-05-2015
5.00
Prime boot cowl
Details
08-20-2015
4.50
Paint black stripes on fuselage
Details
08-19-2015
3.00
Prep and paint trim color on fuselage
Details
08-18-2015
4.50
Paint trim color on fuselage
Details
08-16-2015
5.00
Sand and paint fuselage
Details
08-15-2015
2.50
Paint 1st coat on fuselage
Details
08-14-2015
3.50
Sand and tape for paint
Details
08-13-2015
5.00
Sand and prime fuselage
Details
08-11-2015
5.50
Sand and prime fuselage
Details
08-09-2015
4.50
Paint top surfaces of tail group
Details
08-08-2015
3.00
Repaint bottom of tail surfaces
Details
07-29-2015
2.00
Paint main gear legs
Details
07-28-2015
2.00
prep and prime main gear legs
Details
07-27-2015
2.00
Sand bottom of tail surfaces
Details
07-25-2015
4.00
Paint bottom side of tail surfaces
Details
07-20-2015
4.00
Prime top of tail surfaces
Details
07-18-2015
5.00
Prime tail surfaces
Details
04-16-2015
2.00
Prime flaps and ailerons
Details
04-15-2015
2.00
Prime tail surfaces
Details
04-14-2015
2.00
Prime tail surfaces
Details
04-06-2015
5.00
Prime tail setion parts
Details
03-17-2015
3.50
Prime fusalage fabric
Details
03-16-2015
3.00
Clean fusalage and prime
Details
03-11-2015
2.00
Prime coat right wing
Details
SITE NAVIGATION
Contact Builder
S20 Raven Home
Category
# Logs
# Hours
All
269
1130
Covering
44
218
Engine
6
25
Fuselage
125
545
Miscellaneous
1
1
Painting
58
234
Prop
5
12
Shop Supplies
1
4
Tools
1
5
wings
28
86
Copyright © 2001-2024 Matronics. All Rights Reserved.