Powered By Kitlog Pro v2.0
Richard's Web Site
AirCam
Horizontal Stabilize
Work Logs Found:
23
Category Work Time:
73 Hours
Date
Hours
Work Log Summary
Details
05-19-2016
1.00
Preparing to cut the left HS to install trim tab m
Details
10-29-2015
3.00
Attach leading edge skin to HS
Details
10-29-2015
3.50
Attach gap seals and leading edge skin to R HS
10-28-2015
3.50
Attach leading edge and gap seals to HS
Details
10-28-2015
2.00
Attach gap seals and leading edge to Elevator
04-03-2015
2.00
More Pictures
Details
04-03-2015
3.00
Anti drag and drag atttachment plates
Details
04-01-2015
5.00
Rivet rear rib flanges and rear spar
Details
03-31-2015
0.50
More pictures
Details
03-31-2015
1.50
More pictures
Details
03-31-2015
8.00
Disasembly, mark, deburr, wash and prime.
Details
03-31-2015
8.00
Attachment Plates HS-012 and root ribs.
Details
03-30-2015
2.50
Acid wash and marking
Details
03-28-2015
5.00
Continue work
Details
03-10-2015
1.00
More Pictures
Details
03-10-2015
4.50
Attaching leading edge skins
Details
03-09-2015
2.50
Drag and anti- drag wires.
Details
03-05-2015
0.50
More Images
Details
03-03-2015
1.50
Continue step drilling both sides of the L HS
Details
02-26-2015
5.30
Join 4 and 5ht ribs and transfer drill; attach cab
Details
02-25-2015
4.10
Attach L & R ribs and nose ribs.
Details
02-24-2015
2.00
Rear spar assembly
Details
02-24-2015
3.00
Attach anti drag wire plate
Details
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
246
720
Ailerons
2
10
Attaching and Riging
8
17
Brakes
1
2
Center Section
30
64
Electrical
17
58
Elevator
20
52
Engine
30
105
Fabric
14
19
Flaps
3
8
Fuselage
3
18
General Remarks
1
0
Horizontal Stabilize
23
73
Instruments
13
37
Miscellaneous
2
4
Move to HND
3
8
Paint
9
34
Prop
1
3
Rigging
8
17
Rudder
6
20
Shop Supplies
1
6
Throttle controlls
2
6
Throttle controls
2
6
Vertical Stabilizer
21
62
Wings
23
79
Wiring
3
12
Copyright © 2001-2024 Matronics. All Rights Reserved.