KitLog pro

Powered By Kitlog Pro v2.0

Chucks Web Site
Work Logs Found: 29
Category Work Time: 131 Hours
 Date
Hours
Work Log Summary

Details

 01-05-2013
7.00
Fabricated Tank Attach Brackets and Trap Door
Details
       

 01-04-2013
9.00
Installed Right Wing Access Panels
Details
       

 12-30-2012
6.50
Fluted Right Tank Ribs
Details
       

 12-29-2012
2.00
Drilled "Z" Brackets for Right Tank
Details
       

 10-06-2012
5.00
Pressure Tested Left Tank
Details
       

 10-04-2012
5.00
Installed Rear Fuel Tank Baffle
Details
       

 10-03-2012
2.00
Filled Left Tank With Water
Details
       

 10-01-2012
2.00
Sealed Tank End Ribs on Inside
Details
       

 09-30-2012
2.00
Sealed Fuel Probe Wire to Vent Tube
Details
       

 09-29-2012
12.00
Installed Tank Rear Access Plate and End Ribs
Details
       

 09-27-2012
2.00
Cut Rear Access Hole in Fuel Tank
Details
       

 09-19-2012
3.00
Installed Outboard Capacitive Fuel Sensor
Details
       

 09-17-2012
3.00
Installed Vent, Fuel Return Line, Trap Door
Details
       

 09-15-2012
9.00
Riveted and Sealed Internal Tank Ribs
Details
       

 09-14-2012
4.00
Fabricated Tank Stand & Fay Sealed Ribs
Details
       

 09-13-2012
4.00
Installed Fuel Cap and Tank Sump
Details
       

 09-12-2012
5.00
Riveted and Sealed Remaining Stiffeners
Details
       

 09-11-2012
2.00
Sealed and Riveted Left Tank Stiffeners
Details
       

 09-10-2012
3.00
Sealed Flage on Access Plate
Details
       

 09-08-2012
8.00
Primed Components and Dimpled Tank Skin
Details
       

 09-07-2012
8.00
Fabricated Trap Door for Left Tank
Details
       

 09-06-2012
6.00
Fabricated Flop Tube Anti Torque Bracket
Details
       

 09-05-2012
5.00
Installed Inboard Capacitive Probe in Left Tank
Details
       

 09-04-2012
2.00
Installed Outboard Fuel Probe
Details
       

 08-30-2012
3.00
C'Sink Tank Skins to Baffle
Details
       

 08-29-2012
3.50
Match Drilled Fuel Tank Skins
Details
       

 08-28-2012
3.00
Drilled Ribs to Rear Baffle
Details
       

 08-27-2012
3.00
Aligned Fuel Tank to Skin and Drilled
Details
       

 08-26-2012
2.00
Drilled Z Brackets
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.