Powered By Kitlog Pro v2.0
Chucks Web Site
RV-7
Horizontal Stab
Work Logs Found:
20
Category Work Time:
49 Hours
Date
Hours
Work Log Summary
Details
04-15-2012
8.00
Riveted HS Right Side and Rear Spar Asy.
Details
04-15-2012
1.00
Inspected HS
Details
04-14-2012
1.00
Riveted Top Skin to Left HS
Details
04-14-2012
4.00
Riveted HS Ribs and Spar to Left Skin
Details
04-14-2012
4.00
Dimpled HS Skins
Details
04-12-2012
2.00
Riveted HS Front Spar Asy. Together
Details
04-11-2012
2.00
Began Riveting HS Components
Details
04-10-2012
2.00
Applied Sealer Primer to HS Substructure
Details
04-09-2012
2.00
Etch Primed HS Parts
Details
04-05-2012
4.00
Prepared HS for Assembly
Details
04-04-2012
2.00
Prepared Right Side HS
Details
04-02-2012
1.00
Removed Left Skin
Details
04-01-2012
4.00
Drilled Horizontal Stabilizer (Left)
Details
03-31-2012
2.00
Trimmed and Bent Front Spar Channel
Details
03-31-2012
1.00
Notched and Fluted Horizontal Stab. Ribs
Details
03-31-2012
2.00
Drilled Horizontal Stabilizer (Left)
Details
03-29-2012
2.00
Tapered and Bent Front Reinforcements
Details
03-28-2012
2.00
Prepared Rear Spar Reinforcement Bars
Details
03-28-2012
1.00
Prepared Front Spar Reinforcement Angles
Details
03-27-2012
2.00
Drilled Holes in Rear Spar Assembly
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
157
562
Ailerons
8
30
Elevator
18
56
Empennage
3
5
Flaps
6
31
Fuel Tanks
29
131
Horizontal Stab
20
49
Leading Edge
2
5
Miscellaneous
1
3
None
1
0
Rudder
10
32
Vertical Stab
4
10
Wings
55
210
Copyright © 2001-2024 Matronics. All Rights Reserved.