Powered By Kitlog Pro v2.0
Roberts Web Site
Sling 2
Wings
Work Logs Found:
25
Category Work Time:
139 Hours
Date
Hours
Work Log Summary
Details
07-28-2015
8.00
Riveting top left skin
Details
07-27-2015
5.00
Pitot system final tweeks
Details
07-11-2015
8.00
Pitot-AOA install
Details
07-10-2015
6.00
Wiring left wing
07-07-2015
7.00
Riveting bottom left wing
06-25-2015
2.00
Left wing rivnuts
Details
06-22-2015
5.00
Left wing pitot tube fitting
Details
06-04-2015
6.00
Left Wing Ribs Riveted
Details
05-22-2015
6.00
Right wing completed
Details
05-21-2015
7.00
Preparing top right wing skin for riveting
Details
05-20-2015
5.00
Securing wiring harness on right wing
Details
05-19-2015
6.00
Right wing bottom skins riveted
Details
05-18-2015
5.00
Clecoing the right wing bottom skins
Details
05-17-2015
5.00
Wire harness ready for lower wing skin riveting
Details
05-15-2015
5.00
Fitting wiring harness in right wing
Details
05-14-2015
6.00
Right Wing Wiring
Details
05-14-2015
3.00
Right Wing landing light wire bracket
Details
03-28-2015
6.00
Right wing. Riveting Ribs
Details
03-26-2015
7.00
Right Wing. Fitting ribs and skins
Details
03-19-2015
3.00
Right Wing Assembly
Details
03-12-2015
8.00
Right wing sub assemblies
Details
03-10-2015
6.00
Left Wing
03-05-2015
8.00
Left wing
Details
02-18-2015
4.00
Riveting wing rib subassemblies
Details
02-17-2015
2.00
Left wing subassemblies
Details
SITE NAVIGATION
Contact Builder
Sling 2 Home
Category
# Logs
# Hours
All
78
377
Ailerons
3
13
Elevator
7
27
Flaps
2
11
Fuel Tanks
1
2
Fuselage
26
130
Horizontal Stab
4
12
Miscellaneous
1
4
Rudder
3
11
Shop
2
16
Trim Tab
1
2
Trin Tab
1
2
Vertical Stab
2
8
Wings
25
139
Copyright © 2001-2024 Matronics. All Rights Reserved.