Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Modifications
Work Logs Found:
38
Category Work Time:
96 Hours
Date
Hours
Work Log Summary
Details
12-30-2018
5.00
Stabilator Front Spar Service Bulletin
Details
12-29-2018
6.00
Stabilator Front Spar Service Bulletin
Details
12-27-2018
1.00
Stabilator Front Spar Service Bulletin
Details
12-25-2018
1.50
Stabilator Front Spar Service Bulletin
Details
12-22-2018
5.00
Stabilator Front Spar Service Bulletin
Details
12-20-2018
1.50
Horizontal Stabilator Service Bulletin
Details
12-18-2018
1.00
AST Service Bulletin
Details
12-16-2018
2.00
Anti-Servo Tab Service Bulletin
Details
07-28-2018
5.00
Silent Hektik Voltage Regulator Upgrade
Details
07-27-2018
1.50
Silent Hektik Voltage Regulator Upgrade
Details
07-26-2018
1.50
Silent Hektik Voltage Regulator Upgrade
Details
07-24-2018
1.50
Silent Hektik Voltage Regulator Upgrade
Details
07-22-2018
3.00
Upgrade to Silent Hektik Voltage Regulator
Details
07-08-2018
2.50
Installed canopy gussets and new voltage regulator
Details
07-04-2018
1.50
Support frame gussets
Details
06-24-2018
1.50
Replaced Tee connector to brake reservoir
Details
03-20-2018
1.50
Installed locking fuel cap, sanded fairings
Details
12-19-2017
1.00
Reiff Preheat system install
Details
12-17-2017
2.00
Install Reiff Preheat System
Details
12-16-2017
3.00
Installed Left Stabilator Tip Fairing
Details
12-15-2017
2.00
Installed right stabilator tip fairing
Details
12-14-2017
1.50
Installed nose wheel assembly
Details
12-13-2017
1.50
Stabilator Tip Fairing upgrade
Details
12-10-2017
1.00
Primed stabilator ribs, installed nose fork
Details
12-09-2017
4.00
Stabilator tip fairings
Details
11-18-2017
1.50
Radiator cover assembly
Details
09-30-2017
3.00
Nose Fork Upgrade and wheel fairings installation
Details
05-12-2017
5.00
Looked for fuel leaks
Details
03-16-2017
1.00
Made a radiator cover
Details
07-04-2015
3.50
Work on Baggage Bulkhead, TC, N14-05-14
Details
07-03-2015
5.00
Baggage Bulkhead Corrugation and AOA mods
Details
06-29-2015
2.00
Baggage Bulkhead Corrugation modification
Details
06-28-2015
4.00
Baggage Bulkhead, Aft Floor and AOA mods
Details
06-27-2015
5.00
Riveted the doublers to the wings, ADAHRS wiring
Details
06-24-2015
1.50
Prepped the doublers for riveting
Details
06-22-2015
2.00
Wing skin/spar flange rivet wear SB
Details
02-02-2015
0.50
Primed and riveted Bracket Brace and Angles.
Details
01-24-2015
3.00
Bearing Bracket Brace Service Bulletin
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.