Powered By Kitlog Pro v2.0
Dan's Web Site
RV-7A
Horizontal Stabilizer
Work Logs Found:
42
Category Work Time:
60 Hours
Date
Hours
Work Log Summary
Details
12-31-2006
1.50
Prime Tips; Bolt to Fuselage
Details
12-30-2006
3.00
Shape (Rage), Sand, Fill Pinholes on Both Tips
Details
09-28-2006
0.50
Build Up Horizontail Stab Tips with Mirco
Details
09-07-2006
1.00
Sand Fiberglass; Add Micro
Details
09-05-2006
1.50
Sand, Clean, Micro Horizontal Stabilizer Tips
Details
09-04-2006
1.00
Flox Honeycomb to Horizontal Stabilizer Tips
Details
09-02-2006
0.50
Cutout Honeycomb to Closeout Tips
Details
08-31-2006
1.00
Flox/Rivet Tips to Horizontal Stabilizer
Details
08-30-2006
0.75
Drill Horizontal Stabilizer Tips
Details
08-30-2006
0.75
Countersink Horizontal Stabilizer Tips
Details
06-23-2005
1.50
Drill / Bolt Rear Spar to Fuselage
Details
06-23-2005
1.50
Drill / Bolt Forward Spar to Fuselage
Details
06-23-2005
0.50
Bolt Horizontal Stabilizer to Fuselage
Details
06-19-2005
0.50
Position and Clamp HS to Aft Deck
Details
05-19-2002
0.50
Ooopps -Should have left some rivets out
Details
05-19-2002
0.50
Horizontal Stablizer Complete!
Details
05-18-2002
1.50
Skins riveted to the spars and ribs
Details
05-18-2002
1.50
Cleco rear spar in place; start riveting
Details
05-16-2002
1.00
Riveting Top Left Skin to Spar and Ribs
Details
05-16-2002
1.00
Rivet HS-707 Rib to Left Skin
Details
05-16-2002
1.50
Left side complete, start of right side
Details
05-16-2002
2.00
Both skins riveted to front spar & ribs
Details
05-16-2002
1.00
Attaching left skin to front spar / ribs
Details
05-14-2002
0.50
Rivet Front Spar
Details
05-14-2002
0.50
HS-404 & 405 Ribs riveted to front spar
Details
05-12-2002
2.00
Riveted Rear Spar
Details
05-12-2002
3.00
Dimpled Skins
Details
05-11-2002
3.00
Debur Skins
Details
05-10-2002
8.00
Dimple, Debur, Edge, Prime Ribs & Spars
Details
05-09-2002
1.50
Start of Right Side
Details
05-09-2002
1.50
Right Side Completed
Details
05-08-2002
1.50
Match Drilling the Left Side
Details
05-08-2002
1.00
Left side complete
Details
05-08-2002
1.00
Cleco / Drill Left Side
Details
05-07-2002
0.50
Drilled ribs to spars
Details
05-06-2002
1.50
Straightened and Finished All Ribs
Details
05-05-2002
1.00
Notched the HS404 ribs
Details
05-05-2002
1.00
Match Drilled Rear Spar
Details
05-05-2002
1.00
Completed Rear Spar
Details
05-05-2002
1.00
Completed HS-411PP / VA-146 Hinge Assemb
Details
05-05-2002
2.50
Completed Front Spar
Details
05-04-2002
1.50
Start of Rear Spar
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1974
2363
Ailerons
35
56
Assembly
5
6
Avionics
4
4
Baffles
134
110
Big Dig
8
Brakes
23
26
Canopy
64
83
Canopy Frame
144
152
Cowl
68
74
Electrial
120
96
Electrical
120
96
Elevator
58
90
Empennage
30
48
Engine
64
42
Filtered Air Box
26
22
Finish Kit
4
4
Firewall Forward
27
24
Flaps
50
64
Forward Fuselage
44
53
Fuel System
28
36
Fuselage
294
460
Gear
32
38
Hangar
2
Hardware
5
4
Horizontal Stabilizer
42
60
Left Aileron
4
6
Left Flap
3
2
Left Fuel Tank
38
68
Left Wing
90
117
Paint
1
0
Panel
39
47
Photo Shoot
25
2
Prop
4
4
Right Aileron
2
2
Right Flap
3
2
Right Fuel Tank
43
60
Right Wing
84
102
Rudder
16
30
Rudder II
31
54
Seats
9
21
Service Bulletin: No
7
6
Spinner
17
15
Systems
1
0
Training
3
Vertical Stabilizer
23
31
Wings
100
146
Copyright © 2001-2024 Matronics. All Rights Reserved.