KitLog pro

Powered By Kitlog Pro v2.0

Bob's Searey LSX Web Site
Work Logs Found: 24
Category Work Time: 94 Hours
 Date
Hours
Work Log Summary

Details

 06-18-2024
1.75
Landing gear microswitch adjustment
Details
       

 11-04-2023
0.75
Landing gear checking
Details

 10-29-2023
3.00
Landing gear checks - picking up the plane
Details
       

 07-12-2023
3.75
Parking Brake
Details
       

 07-30-2021
8.50
Landing Gear - Brakes
Details
       

 07-01-2021
22.00
Landing Gear - Debugging & Testing
Details
       

 01-03-2016
1.50
Main Landing Gear - checking
Details
       

 01-01-2016
4.00
Tail Wheel Assembly - checking
Details

 11-21-2015
9.50
Main Bulkhead Assembly - Landing Gear
Details
       

 07-10-2015
1.50
Main Gear - checking before inspection
Details
     

 05-25-2015
1.50
Mounting main gear wheels
Details
       

 05-24-2015
2.00
Main gear installation
Details
       

 05-23-2015
1.00
Main gear installation
Details
     

 05-03-2015
7.50
Assembly of Gear Legs to Bulkhead
Details
       

 04-26-2015
1.00
Assembling Float
Details

 04-25-2015
4.00
Installing tail wheel
Details
       

 04-19-2015
1.50
Assembling Float
Details
       

 04-17-2015
2.00
Installing landing gear actuators
Details
       

 04-11-2015
3.00
Assembling & installing Vertical Fin & Tail Wheel
Details
       

 03-28-2015
3.00
Main gear booties and bilge through hull
Details
       

 03-22-2015
0.50
Main gear rubber seal preparation
Details
       

 03-08-2015
5.00
Installing landing gear actuators
Details
       

 02-14-2015
0.50
Tail wheel assembly
Details
     

 01-25-2015
5.00
Assembling the main wheels
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.