KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
Work Logs Found: 158
Category Work Time: 465 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2018
3.25
install cockpit light, install POH tray
Details
       

 03-13-2018
1.50
Install noise cancelling capacitor
Details

 11-29-2017
1.75
Install canopy catch option
Details
     

 11-28-2017
2.67
Fabricate and install canopy guide blocks
Details
       

 11-25-2017
4.25
add canopy latch safety switch
Details
     

 11-20-2017
1.25
Install canopy latch and latch block
Details
     

 10-14-2017
1.25
match drill skirt holes to canopy and frame angles
Details
       

 10-12-2017
4.85
match drill canopy skirts, dimple and bend skirts
Details

 10-10-2017
1.00
remove canopy and prep for fit
Details

 09-29-2017
1.50
finish drill and cleco canopy front and aft
Details
       

 09-28-2017
3.25
file weld fillet on frame for fit, sand canopy for
Details
       

 09-25-2017
2.00
prep canopy, place on frame
Details
     

 09-23-2017
1.00
prep plastic caps for clecos
Details
     

 09-15-2017
1.00
put cover back on instrument panel, got out canopy
Details
       

 09-11-2017
0.50
apply Boelube and install instrument cover
Details

 06-30-2016
0.75
Install screwws in back of map box
Details
       

 06-29-2016
2.00
assemble map box and rivet to right side panel
Details
     

 06-28-2016
0.75
prime and paint map box halves, prime nut plates
Details
     

 06-25-2016
0.25
rivet nutplates to ctr panel, install center panel
Details
       

 06-23-2016
1.50
work on map box door, deburr center panel
Details
     

 06-22-2016
3.25
work on map box and door, left generic panel
Details
     

 06-21-2016
2.75
finish forward fuselage skin, start map box
Details
       

 06-20-2016
0.50
Attach fwd fuse skin dimple nut plates and bracket
Details

 06-16-2016
2.42
prep, drill dimple, and deburr Upper Fwd Fuse skin
Details
       

 06-01-2016
0.50
Assemble cover plate and clip
Details
       

 05-25-2016
3.92
Deburr parts and assembly
Details
       

 05-24-2016
4.92
panel base and canopy ribs attachment
Details
       

 05-20-2016
1.25
cleco and match drill Panel Base to longerons
Details

 05-19-2016
2.00
deburr F-1202B Panel Base, install nut plates
Details

 05-16-2016
0.45
Finish right canopy rib assembly
Details

 04-20-2016
2.75
Finish deburr, finish canopy rib L
Details
     

 04-19-2016
0.33
more deburr
Details

 04-14-2016
1.25
Prep F-1202H-L&R, deburr edges F-1202A-L&R
Details

 04-06-2016
2.50
attach mid-cowl hinges & attach stiffeners
Details
       

 04-04-2016
4.25
finish cowl hinges, complete antenna shelf
Details
       

 04-01-2016
1.83
start to attach cowl hinges
Details

 03-31-2016
3.00
install firewall spacers, install upper fuse Doubl
Details
       

 03-30-2016
2.33
fabricate cowl hinges, and stiffeners
Details

 03-29-2016
0.25
Fabricate hinges
Details

 03-28-2016
2.25
Fabricate and install forward fuel return line
Details
       

 03-26-2016
2.00
construct and install rear return fuel line
Details

 03-25-2016
3.00
Redo 3/8" fuel feed lines
Details
       

 03-11-2016
3.00
Testing flares on 3/8 fuel lines, get new tools
Details

 03-04-2016
1.75
safety wire and install gascolator
Details
       

 02-25-2016
0.83
install fuel sensor
Details
     

 01-20-2016
2.50
fabricate and install pump to valve fuel line
Details
       

 01-16-2016
1.75
fabricate and install first fuel line
Details
       

 01-15-2016
2.33
mount fuel pump and fuel shut off valve
Details
       

 01-13-2016
1.55
put fuse on side, run remaining brake lines
Details
       

 01-09-2016
0.50
cut brake lines
Details

 01-07-2016
2.50
install brake line fittings and crossover lines
Details
       

 12-29-2015
2.00
mount rudder/brake pedal assembly to fuselage
Details
       

 12-28-2015
4.40
assemble brake pedals and brake cylinders
Details
       

 12-22-2015
1.75
start on rudder pedal assembly
Details
       

 12-04-2015
4.40
finish seat backs and install in fuselage
Details
       

 12-02-2015
1.75
fabricate seat back hinges
Details

 11-30-2015
2.00
prep seat back parts
Details

 11-13-2015
0.75
install attach angle in baggage area rear bulkhead
Details
     

 11-12-2015
3.50
install rear bulkhead, brace
Details
       

 11-11-2015
1.00
Install rollover assembly
Details
       

 11-10-2015
0.50
move fuselage from basement to garage
Details
       

 11-09-2015
1.50
prep garage for fuse, match drill tailcone Shear C
Details

 11-06-2015
3.00
deburr parts
Details

 09-17-2015
1.50
match drill and prime rollover arch bases
Details
     

 09-16-2015
1.70
rivet the rollover arch assembly
Details
       

 09-15-2015
1.75
prime rollover arches, deburr other parts
Details
     

 09-14-2015
0.75
finish rollover arch latch parts
Details

 09-12-2015
1.75
finish match drilling, deburr all holes
Details

 09-11-2015
2.00
cleco parts for rollover arch, start final drillin
Details
     

 09-10-2015
1.00
deburr edges of rollover assembly parts
Details

 09-09-2015
0.75
sort out rollover assembly parts, breakdown crate
Details

 09-09-2015
0.75
redo left cowl hinge
Details

 09-08-2015
1.50
fabricate and install cowl hinges
Details
       

 09-07-2015
2.75
assemble and install vent door assemblies
Details
       

 09-06-2015
0.83
start side vent assemblies
Details

 09-06-2015
1.67
left side skin riveted, two stiffeners riveted
Details
       

 09-05-2015
3.75
rivet right side skin
Details
       

 09-04-2015
1.75
deburr left side skin, dimple and nut plates
Details
       

 09-03-2015
1.75
countersink canopy decks, deburr right side skin
Details

 09-02-2015
1.75
finish prep of left skin, prime longerons
Details
       

 09-01-2015
1.83
deburr left longeron and other left skins
Details

 08-31-2015
1.67
deburr right longeron and other right side skins
Details

 08-21-2015
2.67
finish cleco side skins, match drill longerons
Details
       

 08-20-2015
2.10
finish wing spar cut outs on side skins, & gusset
Details
       

 08-17-2015
0.75
cleco longeron assembly and start side skins
Details
       

 08-16-2015
2.75
complete arm rest and side channel pieces
Details
       

 08-15-2015
2.00
finish roll bar attach plate, start arm rest side
Details
       

 08-14-2015
2.50
deburr longerons, complete roll bar attach plates
Details

 08-11-2015
3.25
Bend and drill longerons
Details
       

 08-10-2015
0.75
finish flatten area and bend left longeron
Details

 08-06-2015
1.50
Flattened forward end of longerons
Details
       

 08-05-2015
0.75
worked to flat forward end of longerons
Details

 08-04-2015
1.67
Cut and marked longerons, deburr templates
Details

 07-27-2015
1.00
sort out section 23 parts
Details

 07-08-2015
2.25
cleco and rivet fwd lower fuselage to mid fuselage
Details
       

 07-07-2015
1.00
prime and rivet gascolator and rivet fuel flow bra
Details
       

 07-06-2015
1.00
install FF-1204D firewall stiffener and fab F-1201
Details

 07-05-2015
2.20
Install firewall shelf
Details
       

 07-02-2015
1.60
rivet cowl attach plates, drill gascolator hole
Details
       

 07-01-2015
1.10
fab firewall spacers and drill in cowl attach plat
Details

 06-30-2015
4.60
rivet nut plates and forward fuselage pieces
Details
       

 06-29-2015
1.20
deburr F-1272, F-1217A-L&R, F-1271-L&R
Details

 06-26-2015
2.00
deburr F-1288 and prep many others
Details

 06-25-2015
3.33
install baggage bulkhead and autopilot brackets
Details
       

 06-25-2015
1.00
install autopilot brackets
Details
     

 06-23-2015
1.42
install step floors
Details
       

 06-22-2015
1.00
install steps, add nut plates and install snap bus
Details
       

 06-21-2015
0.67
rivet nut plate and step attach brackets to fusela
Details

 06-20-2015
3.00
match drill steps and brackets and begin riveting
Details
       

 06-19-2015
1.75
fabricate step attach brackets & nut plate bracket
Details

 06-18-2015
2.00
rivet the fuselage bottom skin
Details
       

 06-17-2015
4.10
finish prep and deburr F-1276, rivet nut plates, c
Details
     

 06-16-2015
1.00
use soldering pencil to prep bottom skin coating
Details

 06-15-2015
1.50
prep and deburr F-1204Z & F-1268A to E
Details

 06-12-2015
3.91
prep, deburr and rivet L & R corner skins
Details
       

 06-11-2015
2.50
secure control column, install floor ribs
Details
       

 06-08-2015
158.00
nut plates to seat floors, control column partial
Details

 06-05-2015
2.00
bulkhead to seat floor assy, rivet seat floor ramp
Details
       

 06-04-2015
3.67
bulkhead assembly completion
Details
       

 06-03-2015
1.92
prep and rivet stub spar receptacle, doublers
Details
       

 06-02-2015
3.75
prep bulkhead, prep other parts
Details
       

 06-01-2015
1.75
rivet control column mount assembly
Details
     

 05-30-2015
1.83
Install left and right forward bulkhead side assys
Details
       

 05-30-2015
1.25
deburr brackets and parts
Details

 05-29-2015
2.25
finalize seat floor assemblies
Details
       

 05-27-2015
3.93
finish left seat floor assembly
Details
     

 05-26-2015
2.25
assemble seat ribs, prep seat hinges
Details
       

 05-24-2015
2.25
find more parts in crate, prep parts
Details

 05-22-2015
2.00
autopilot servo brackets install, seat ribs assy
Details
       

 05-20-2015
2.17
install pulley bracket assy and mixer to seat ribs
Details
       

 05-19-2015
0.75
rivet nut plates, final drill #19 and dimple seat
Details

 05-18-2015
2.17
finish deburr, continue seat rib assemblies
Details

 05-15-2015
2.00
start prep and deburr of seat ribs
Details

 05-13-2015
1.75
cotter pin install, prep seat belt attach pieces
Details
       

 05-12-2015
0.75
assemble flaperon mixer assembly
Details

 05-11-2015
0.25
install LP4-5 rivets per Vans
Details
       

 05-11-2015
1.75
assemble pulley brackets onto intercostal
Details
       

 05-09-2015
3.25
rivet ribs, nutplates and SB 12-14-06
Details
       

 05-06-2015
1.75
rivet bulkhead to baggage ribs
Details

 05-05-2015
2.00
dimple and rivet nut plates plus bearing bracket
Details
     

 05-01-2015
2.25
prepare and install rear spar wing supports
Details
       

 04-29-2015
1.00
dimple and install nut plates
Details
     

 04-28-2015
2.50
dimple and rivet baggage ribs
Details
       

 04-22-2015
1.20
install fuselage baggage floor
Details
     

 04-21-2015
3.00
redo rivet, prep fuselage baggage floor
Details

 04-20-2015
1.25
prep rear fuselage ribs
Details

 04-16-2015
0.75
redo 2 Cherry rivets
Details

 04-14-2015
2.08
finish fuselage center section
Details
       

 04-11-2015
4.50
finish match drill, countersink center fuse assy.
Details
     

 04-04-2015
1.50
match drill half of holes in center section assemb
Details
     

 04-03-2015
4.00
work on fuselage center section assembly
Details
     

 04-01-2015
1.25
prime nut plates
Details
     

 03-31-2015
1.50
organize fuselage hardware

 03-25-2015
3.00
organize fuselage hardware

 03-21-2015
1.00
organize fuselage hardware

 01-25-2015
2.00
inventory fuselage hardware
Details

 01-22-2015
2.00
inventory fuselage
Details
       

 12-29-2014
0.10
received fuselage kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.