KitLog pro

Powered By Kitlog Pro v2.0

My earth journey takes flight
Work Logs Found: 26
Category Work Time: 161 Hours
 Date
Hours
Work Log Summary

Details

 04-24-2017
10.00
Finished off Fuselage bits
     

 03-06-2017
6.00
Making Stobe Light Fitting for Fuselage
Details
     

 03-08-2016
4.00
Completed Control Cable install and then dissassmb
Details
       

 03-07-2016
8.00
Aileron and Elevator Control Cables
Details
       

 03-05-2016
8.00
Aileron Control Cables
Details
       

 03-04-2016
8.00
Instaling Wing Flaps
Details
       

 02-29-2016
8.00
Rear Spar Bolt Drilled
Details
       

 02-22-2016
8.00
Seat Belt Shoulder Attachment and Canopy Latch
Details
       

 05-18-2015
1.00
Test install centre console
Details
       

 05-17-2015
8.00
Cockpit Centre Console
Details
       

 04-26-2015
2.00
Re-Installed Filight Control Tube
Details

 03-30-2015
8.00
Finished riveting fuselage back together
Details
       

 03-23-2015
8.00
Began riveted Centre Fuselage back together with B
Details
       

 03-21-2015
8.00
Fuselage B Mod Parts Fitting and Priming
Details
       

 03-10-2015
6.00
Rear Cockpit Tube Adjustment
Details
       

 03-02-2015
10.00
Fuselage B-Mod Cockpit Installation
Details
       

 02-23-2015
1.00
Centre Spar - Installation of B-Mod
Details

 02-16-2015
6.00
Centre Spar and Fuselage Modification
Details
       

 02-09-2015
2.00
Centre Spar - Reaming Wing Fitting Bolts
Details
       

 02-03-2015
8.00
Cockpit Modification Upgrade - Dissassembly
Details
       

 02-02-2015
8.00
Centre Spar Modifcation - Assembly
Details
       

 02-01-2015
4.00
Centre Spar Upgrade - Assemble
Details
       

 01-31-2015
8.00
Centre Spar Upgrade
Details
       

 01-13-2015
6.00
Installing B Mod into Center Spar
Details

 01-12-2015
4.00
Installing B Mod to Center Spar
Details

 01-10-2015
3.00
Disassemble wing centre spar
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.