 08-16-2016
4.00
Finished adjusting and installing deice brush bloc
     

 08-09-2016
8.00
Designing abracket to hold the Brush Block
     

 08-03-2016
10.00
Hooked up deice controllers

 08-02-2016
8.00
Ran and hooked the deice grounds

 07-29-2016
8.00
Install left wing faring and left wing inboard dei

 07-21-2016
2.00
Defined heater power locations.

 07-13-2016
4.00
Routed and connected the wing power wires

 07-12-2016
2.00
Continue connecting deice wires

 07-11-2016
5.00
Install deice alternator

 05-18-2016
7.00
Installed the deice electronics and hooked up tail
       

 05-17-2016
8.00
Constructed shelf and installed tail deice control

 05-13-2016
8.50
Continue pulling wires for Deice system

 05-12-2016
6.50
Started wiring up the deice electrics
     

 03-14-2016
4.00
Windshield deice and vor ant
Details

 03-10-2016
6.00
Install windshield deice tank
       

 02-22-2016
2.00
Construct a wind deflector for the spray bar

 04-21-2015
2.00
Complete installing deice connectors on outboard l
       

 04-20-2015
7.00
Installed two of three deice connectors

 04-15-2015
5.50
Made the R wing landing light cover
     

 03-09-2015
8.50
Reposition L outboard deice terminal

 03-04-2015
2.50
Installed R outside horz stab deice terminal and e

 03-02-2015
4.00
Installed the two inner deice terminals on the Hor
     

 02-27-2015
2.00
Finish installing one Horz deice power terminal
       

 02-23-2015
2.00
Begin install R outboard Horz stab deice terminal
       

 02-18-2015
4.00
Wired up deice terminals in the L wing Outboard
       

 02-13-2015
4.00
Made R wing deice controller inspection port
       

 02-06-2015
6.00
Installed 3 of 4 L wing power connectors
       

 02-05-2015
2.00
Started installing wing connector studs
Details
       

 02-03-2015
2.00
Layout terminal position and shape first termina

 02-02-2015
2.00
Started experimenting on scrap with cutting holes

 01-23-2015
8.00
Filled hole for left landing light
Details
     

 01-09-2015
7.00
Installrd the Horizontal stab deice controller bra
Details
       

 01-05-2015
6.00
Make Wing controller brackets