Powered By Kitlog Pro v2.0
LEWIS'S WEB SITE
S20 Raven
Fuselage
Work Logs Found:
125
Category Work Time:
545 Hours
Date
Hours
Work Log Summary
Details
04-19-2017
4.50
install headset jacks
Details
04-15-2017
4.00
Finish baggage area
Details
03-04-2017
4.00
Install weight at tail and weigh plane
Details
03-02-2017
1.50
Cast weight for tail
Details
02-18-2017
3.50
weigh plane
Details
02-01-2017
2.50
work on headset jack mounting and seat belts
Details
01-31-2017
3.00
Fit interior panels and headset jacks
Details
01-28-2017
5.00
Cowling, doors, interior work
Details
01-02-2017
5.50
Continue skylight installation
Details
01-01-2017
6.00
Continue windshield installation
Details
12-31-2016
3.50
Continue skylight install and bleed brakes
Details
12-30-2016
3.00
Continue windshield and skylight prep
Details
12-29-2016
4.50
continue windshield prep for installation
Details
12-28-2016
2.50
Position windshield for drilling
Details
12-27-2016
2.50
prep windshield and skylight for installation
Details
12-22-2016
3.50
Windshield installation
Details
12-21-2016
6.50
Fuel lines, skylight braces, tank vents
Details
12-19-2016
1.50
complete jury strut mounting
Details
12-14-2016
3.50
mount jury struts
Details
12-11-2016
4.50
Work on aileron cables
Details
12-10-2016
7.50
install aileron cables
Details
12-04-2016
4.00
Install wings
Details
11-23-2016
6.50
Wing install preperation
Details
11-19-2016
3.00
Install park brake cable
Details
11-06-2016
5.50
Install ELT panel switch
Details
11-05-2016
4.50
Fabricate transponder antenna bracket
Details
11-01-2016
3.50
Headset wiring
Details
10-03-2016
3.50
Make coax cables
Details
10-02-2016
4.50
Wire stick grip
Details
10-01-2016
8.50
Final install panel
Details
09-27-2016
3.00
Install radio and transponder in panel
Details
09-25-2016
5.00
Power instrument panel
Details
09-24-2016
7.50
Work on wiring panel
Details
09-18-2016
6.00
Wire instrument panel
Details
09-17-2016
8.50
Hook up instrument panel
Details
09-16-2016
3.00
Work on wiring
Details
09-15-2016
3.00
Work on wiring
Details
09-14-2016
3.50
Work on wiring
Details
09-13-2016
3.00
Work on wiring
Details
09-12-2016
3.00
Work on wiring
Details
09-11-2016
7.00
Cut instrument panel holes
Details
09-10-2016
7.00
Complete cowling mods and prime
Details
09-09-2016
3.00
Work on top cowling
Details
09-04-2016
8.00
Modify second cowling top
Details
08-29-2016
6.50
Fabricate battery box
Details
08-28-2016
6.50
Fab radiator side mounts
Details
08-25-2016
3.00
Wire fuel pumps and install fuel line to engine
Details
08-24-2016
3.00
Mount fuel pumps and install hoses
Details
08-12-2016
6.00
Fit doors to fuselage
Details
07-17-2016
6.00
Prefit windshield
Details
07-16-2016
3.50
Install windows
Details
06-24-2016
4.00
Install camlocs
Details
06-21-2016
3.00
work on cowling
Details
06-20-2016
3.00
Cowling work
Details
06-18-2016
6.00
Work on camlocs for cowling
Details
06-16-2016
4.00
Work on lower cowling
Details
06-12-2016
3.00
work on lower cowling
Details
06-10-2016
2.00
Work on lower cowling
Details
06-09-2016
3.00
Work on lower cowling
Details
06-08-2016
2.50
Work on lower cowling
Details
05-31-2016
4.00
Cowling repairs
Details
05-30-2016
3.00
Work on cowling
Details
05-29-2016
7.00
Work on cowling
Details
05-28-2016
8.00
Work on cowling
Details
02-20-2016
6.00
Mount engine to airframe
Details
02-09-2016
2.00
Uncrate engine
Details
01-06-2016
3.00
Work on wiring
Details
01-04-2016
4.00
Install engine mount
Details
01-02-2016
8.00
Work on instrument panel
Details
01-01-2016
7.00
Work on instrument panel
Details
12-30-2015
4.00
Work on instrument panel
Details
12-29-2015
5.00
Work on instrument panel
Details
12-27-2015
2.50
Install clip nuts in baggage area
Details
12-26-2015
1.00
Install elt to frame
Details
12-26-2015
3.00
Install ELT antenna
Details
12-24-2015
3.50
Fabricate fuse block mount
Details
11-21-2015
2.50
Cut hole in instrument panel for Ipad
Details
11-20-2015
5.00
Cover seats
Details
11-19-2015
6.00
Assemble seat frames
Details
11-03-2015
4.00
Install control sticks
Details
11-02-2015
2.50
Hook up trim at elevator
Details
11-01-2015
7.00
Install elevators and rudder return springs
Details
10-31-2015
8.50
Rig horizontal stabilizers & balance right elevato
Details
10-30-2015
4.00
Install horizontal stabilizers
Details
10-29-2015
6.00
Work on right elevator and stabilizer
Details
10-28-2015
3.00
Install trim tab
Details
10-25-2015
3.00
Modify attach tangs
Details
10-22-2015
3.00
located parts for empanage
Details
10-18-2015
5.00
Rudder cable installation
Details
10-12-2015
3.50
Fit doors to fuselage
Details
10-11-2015
4.50
Assemble trim on doors
Details
10-07-2015
1.50
Install rudder
Details
10-03-2015
6.00
make capture ring parts for left door
Details
09-26-2015
3.00
make lower inner capture ring for left door
Details
09-20-2015
5.50
Work on brake system
Details
09-19-2015
7.00
Install floorboard and rudder pedals
Details
09-15-2015
3.00
Work on right door
Details
09-14-2015
4.00
Work on right door
Details
09-13-2015
5.00
Complete gear installation
Details
09-12-2015
5.00
Work on main gear
Details
09-01-2015
2.50
Work on boot cowling
Details
08-28-2015
5.50
Finish riveting boot cowl
Details
08-23-2015
5.50
Work on boot cowl
Details
08-22-2015
4.00
Work on boot cowl skins
Details
08-22-2015
3.00
Install bottom boot cowl skin
Details
08-07-2015
3.00
Mount main tires
Details
02-16-2015
4.50
install header tank
Details
02-12-2015
2.00
check header tank
Details
01-24-2015
4.50
Seats
Details
01-22-2015
3.00
Header tank
Details
12-19-2014
6.50
Assemble fuselage sub assemblies
Details
12-18-2014
2.00
Control sticks
Details
12-15-2014
2.00
Drill out boot cowl skins
Details
12-14-2014
7.00
Boot cowl skin work
Details
12-12-2014
7.00
Fit boot cowl top skins
Details
12-10-2014
1.00
Make 2 braces for boot cowl side skins
Details
12-09-2014
3.50
Fit boot cowl side skins
Details
12-08-2014
3.50
Fit firewall and bottom boot cowl
Details
12-07-2014
7.00
Assemble baggage compartment
Details
12-06-2014
6.50
Rivet brake pedals, assemble baggage walls
Details
12-05-2014
2.00
Cleco brake pedals
Details
12-04-2014
5.00
Fit floorboard
Details
12-03-2014
3.00
Install com and elt antenna mount plates
Details
12-02-2014
6.50
Fuselage formers installation
Details
12-01-2014
5.00
Open crate and inventory parts
Details
SITE NAVIGATION
Contact Builder
S20 Raven Home
Category
# Logs
# Hours
All
269
1130
Covering
44
218
Engine
6
25
Fuselage
125
545
Miscellaneous
1
1
Painting
58
234
Prop
5
12
Shop Supplies
1
4
Tools
1
5
wings
28
86
Copyright © 2001-2024 Matronics. All Rights Reserved.