KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
Work Logs Found: 13
Category Work Time: 23 Hours
 Date
Hours
Work Log Summary

Details

 08-16-2015
5.00
Mixture and Fuel Cutoff Cables
Details
       

 07-04-2015
1.50
Carb Heat Cable
Details
       

 05-23-2015
3.50
Throttle Controls
Details
       

 05-23-2015
1.00
Throttle Controls
Details
       

 05-16-2015
1.50
Passenger Rudder Controls
Details
       

 10-29-2014
2.00
Tail Brace and Control Cables
Details
       

 10-19-2014
0.50
Tailwheel springs
Details
     

 10-19-2014
0.50
Elevator Cable Tension Spring
Details
     

 09-21-2014
1.00
Hangar Rat
Details
     

 08-13-2014
2.00
Rudder Cable Installation
Details
       

 08-09-2014
2.00
Pilot Seatbelt Installation
Details
       

 08-07-2014
1.00
Seatbelt Planning
Details
       

 05-25-2014
1.50
Tail Brace Cable Assembly
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.