 01-26-2017
6.00
Trouble shooting and upgrading connectors.
Details

 01-19-2017
3.00
Installed the canopy defog fans

 01-17-2017
9.50
Spent all day on the led lights and a dimmer

 12-09-2016
2.00
Calibrate trims and set v speesd

 12-02-2016
8.00
Install EGT and CHT probs and wireing
       

 11-30-2016
2.50
Constructed a bracket to hold GPS antennas
     

 11-29-2016
5.00
Get pressure sensors and alert audio working

 11-28-2016
4.00
Install a shunt for primary amperage

 11-10-2016
1.00
Calibrate G3x Magnatometer

 11-09-2016
2.50
Aligned the Mini X Magnatometeer
     

 09-19-2016
6.00
Finished wiring cowl flap. Clean up wireing.
     

 09-13-2016
4.00
Tach wireing and seat wireing

 09-12-2016
4.00
Wired up the new starter contactor and USB ports

 09-06-2016
7.00
Installed PMag and Alt ckt Bkr Switches

 09-01-2016
6.00
Wired up the AOA. Most time wiring the Audio Aler

 08-31-2016
7.00
Wired part of AOA. Sired seat heaters.

 08-24-2016
4.00
Evaluated alternatives to how best to add final ci

 08-23-2016
10.00
Wiring up the #2 Alt and pulling other wires

 06-26-2016
2.50
Tracking down a servo fault

 06-24-2016
7.00
Hook up pitot heat and wing lights

 06-23-2016
4.50
Continue wing lights wiring

 06-22-2016
4.00
Finished AHRS wiring and started Wing lights

 06-20-2016
10.00
Installing wiring in right wing

 06-20-2016
10.00
configured avionics. found fault in trim system.

 06-16-2016
5.00
Pulling wires through the wings.

 06-14-2016
5.00
Installed pitot.Pulled wire.

 06-13-2016
2.00
install alternate static source.

 06-10-2016
6.00
Modified the start switch to work with EMags

 06-08-2016
2.00
Installed Deice LED's and worked on key switch

 06-07-2016
2.00
Pulled Mini X Magnetometer wires

 06-01-2016
4.00
Installed both comm antennas

 05-03-2016
8.50
Got the Pilots stick buttons connected.Pitch trim

 05-02-2016
11.00
Control stick wiring. Talking with Prop shops.

 04-29-2016
7.00
Hook up headsets and audio panel

 04-28-2016
3.50
Started wiring up the headset jacks

 04-27-2016
6.00
Wired up the Mini X EFIS

 04-26-2016
10.00
Installed magnetomer and AHRS.

 04-25-2016
7.00
Continued building a "Rats Nest" of wires
     

 04-22-2016
8.00
Wire the pitch servo and the autopilot head

 04-21-2016
8.00
Flaps and VPX
Details

 04-20-2016
8.00
Wrapped panels. Set switches to rotate. Labeled.
     

 04-19-2016
7.00
Wrap L. panel. install dp3t switches

 04-18-2016
4.00
Antenna connectors and installed 530W backkplate

 04-15-2016
2.00
Wiring 530w Com and Nav

 04-14-2016
7.00
Wiring vp switches and GNS530W

 04-13-2016
4.00
Getting parts and continued wiring 530W

 04-12-2016
6.00
Worked on laying out panel. and wrapped center par
     

 04-11-2016
8.00
Finished antenna wire make and pull.

 04-07-2016
8.00
Wired ther xponder. Started gthe ADSB unit.

 04-05-2016
8.00
Compo;eted cutting out panel
     

 04-04-2016
5.50
Set up cable runs in the wings. Work on panel cuts

 04-01-2016
6.00
Continue wiring antennas

 03-31-2016
7.00
Worked on installing antennas

 03-30-2016
6.00
Installed two antenna's. Xponder and ADSB
     

 03-29-2016
6.00
Continue wiring

 03-28-2016
8.00
Cut out center panel and continued wireing
     

 03-24-2016
3.00
Wiring GAD29 to GNS530W

 03-23-2016
7.00
Wiring and insulating
Details
     

 03-22-2016
4.00
Started making wiring harness for #2 comm

 03-16-2016
7.00
Finish installing VOR Ant in right wing tip.
Details
       

 03-15-2016
3.00
Wireing wing tip lights.Start install VOR antenna

 03-11-2016
6.00
Talked to RDD and devised a deice component layout

 03-08-2016
9.00
Avionics stuff
Details

 03-07-2016
3.00
Worked on laying out deice electronics
     

 03-05-2016
3.00
Working on panel to hold deice boxes

 03-04-2016
10.00
Continue designing and building avionics trays.
     

 03-03-2016
7.00
Continue designing brackets to hold remote avionic
     

 03-02-2016
6.00
Installed a rain gutter
Details
     

 02-29-2016
9.50
Worked on the install box for 530w and audio pnl

 02-23-2016
6.00
Installed aileron trim

 02-11-2016
2.50
Working on layout of all the avionics remote boxes

 02-09-2016
6.00
Figured out locations for avionics boxes

 02-08-2016
3.00
Work on locations for all the boxes

 05-08-2015
6.00
worked on wireing harness for Garmin roll servo

 05-07-2015
6.00
Installed autopilot roll servo in right wing.
Details
     

 03-20-2015
1.00
Pitot, AOA, a d Static
Details

 03-12-2015
6.50
Constructed and installed AHRS mount
       

 03-11-2015
3.50
Designing AHRS bracket for G3X

 03-05-2015
2.00
Installed wire runs in the left wing
       

 02-17-2015
4.00
Inspection plates and wiring
Details
     

 02-16-2015
4.00
Make inspection holes and plates for the Magnetome
       

 02-12-2015
2.00
Finished install of Mini X magnetometer bracket

 02-12-2015
2.00
Began making access ports for magnetometers.

 02-11-2015
4.00
Begin install of backup magnetometer bracket
     

 02-10-2015
5.50
Install magnetometer bracket
     

 02-09-2015
8.50
Build bracket for magnetometer
     

 02-07-2015
4.00
Designing and constructing a Magnetometer bracket

 02-05-2015
1.00
Figuring the angles for the magnetometer bracket

 02-03-2015
2.00
design bracket for megnetometer

 12-30-2014
3.00
Preping L forward ourboard wing ribs