KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
Work Logs Found: 31
Category Work Time: 76 Hours
 Date
Hours
Work Log Summary

Details

 02-28-2006
2.00
Elevator attachment notches
Details
     

 02-26-2006
3.00
Installing elevators (part 1)
Details
       

 02-26-2006
2.00
Elevator installation (part 2)
Details
       

 02-23-2006
4.00
Rudder fitting
Details

 02-23-2006
2.00
Installed elevator access panels
Details
       

 02-17-2006
2.00
Trimmed rudder for travel
Details
     

 02-17-2006
2.00
Installed Rudder pushrod
Details
       

 01-22-2006
0.75
Finished rudder pedal access panels
Details

 01-20-2006
0.75
Riveted the floor boards
Details

 01-13-2006
2.00
Assembled Rudder pedals
Details
       

 12-19-2005
2.00
Rudder Pedal floors
Details
       

 12-17-2005
1.50
Mounted the Rudder Pedals
Details
       

 12-16-2005
4.00
Fit Floor boards
Details
     

 12-14-2005
2.00
Rudder Cables
Details
       

 12-13-2005
2.00
Ready Center rudder cable install
Details
       

 12-13-2005
4.00
Installed Rudder Bellcrank & Cables
Details
       

 12-05-2005
2.00
Assembled Rudder Bellcrank
Details
       

 09-20-2005
1.00
Reference holes drilled for rudder separation
Details
     

 09-20-2005
2.00
Elevator trimming
Details

 09-19-2005
3.00
Adjusted travel on Elevator
Details

 09-16-2005
2.00
Rudder counterweight and bulkhead
Details
       

 09-16-2005
1.00
Horizontal Stab slot cut
Details
     

 09-16-2005
8.00
Horizontal Stab fitting
Details
       

 09-16-2005
2.00
Added elevator stop blocks
Details
       

 09-15-2005
3.00
Bids on Elevators
Details
     

 09-14-2005
4.00
Horizontal Stab Closeout
Details
       

 09-14-2005
4.00
Elevator closeout
Details
       

 09-14-2005
1.50
Cleaned up the Ailerons
Details
     

 09-13-2005
1.00
Prep for Horiz Stab closeout
Details
     

 09-13-2005
3.00
Elevator width is set
Details
     

 09-12-2005
2.00
Elevator Prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.