Pauls Web Site
RV-6A
Avionics
Work Logs Found:
91
Category Work Time:
534 Hours
Date
Hours
Work Log Summary
Details
03-26-2019
0.00
Pictures of center tunnel completed
Details
03-09-2019
5.00
Finished installing defrost fans
Details
03-03-2019
3.00
Cutting holes for defrost fans
Details
02-09-2019
40.00
Wire lacing/Tye wrapping
Details
11-15-2018
2.00
Lacing vertical section of center tunnel
Details
10-28-2018
40.00
Dynon configurations
Details
09-30-2018
8.00
Configuring avionics
Details
09-29-2018
7.00
Dynon backup batteries
Details
09-28-2018
4.00
Installed manifold pressure lines
Details
09-23-2018
16.00
Powered up the avionic panel
Details
09-09-2018
8.00
Wiring avionics
Details
09-08-2018
8.00
Worked on avionics
Details
09-07-2018
2.00
Right side of VPX completed
Details
09-06-2018
2.00
Installed J1 on VPX
Details
08-26-2018
5.00
Installing the avionic wiring harness
Details
08-26-2018
3.00
Completed wiring harness
Details
08-23-2018
4.00
Finished Garmin connectors
Details
08-21-2018
8.00
More work on the wiring harness
Details
08-18-2018
8.00
Worked on avionics wiring harness
08-08-2018
1.00
Remounted ELT buzzer
Details
08-07-2018
4.00
Worked on wiring harnesses
Details
08-05-2018
5.00
Building Skyview Y harness
Details
08-04-2018
8.00
Working on main wiring harness
Details
07-30-2018
3.00
Avionics wiring
Details
07-28-2018
1.00
Installed ELT audio alert
Details
07-28-2018
2.00
Installed ADSB 472
Details
07-21-2018
2.00
Installed charging fuses
Details
07-14-2018
1.00
Installed EarthX trouble lights
Details
07-13-2018
40.00
Time spent running wiring
Details
07-13-2018
2.00
Accessory batteries for the ACK ELT
Details
06-17-2018
20.00
Flap motor wiring
Details
06-10-2018
3.00
Wired Battery and Fuel selector switch
Details
05-26-2018
40.00
Wiring aircraft
Details
04-09-2018
5.00
Installed manifold pressure sensors
Details
08-25-2017
4.00
Modified GPS mounts
Details
07-05-2017
4.00
Finished heat shield on center wire bundle
Details
07-05-2017
0.00
Additional pictures of the center tunnel heat shie
07-04-2017
2.00
Wiring in forward center tunnel
Details
07-04-2017
4.00
Running wire from rear of aircraft through wing sp
Details
07-02-2017
2.00
Installed COM antennas
Details
07-01-2017
1.00
Installed GPS receivers
Details
06-27-2017
0.00
test
06-24-2017
6.00
Installing GPS receivers under cowl
Details
06-20-2017
0.50
Installed filter on alt static air
Details
06-19-2017
2.00
HDX backup batteries
Details
06-18-2017
2.00
Installed the SV-EMS-220
Details
06-04-2017
3.00
Alternate static air
Details
06-03-2017
5.00
Static and dynamic test ports
Details
05-30-2017
2.00
Installed avionics
Details
05-21-2017
6.00
Installing avionics
Details
05-20-2017
4.00
Installed instrument panel
Details
05-12-2017
1.00
Fabricated circuit breaker bus bar
Details
05-08-2017
3.00
Building Garmin stack
Details
05-07-2017
1.00
Installed panel
Details
04-29-2017
4.00
Installed secondary ADAHRS
Details
04-15-2017
8.00
Installed Vertical Power and Bus Manager
Details
03-19-2017
3.00
Repainting the instrument panel
Details
03-12-2017
7.00
Instrument panel painted
Details
03-11-2017
8.00
Instrument Panel ready for painting
Details
12-15-2016
24.00
Instrument panel template
Details
01-01-2016
2.00
Updated the avionics drawings
01-01-2016
4.00
Finished all wiring behind the baggage bulkhead
Details
12-31-2015
8.00
Worked on avionics and ELT
Details
12-24-2015
1.00
Pulled wire from empennage to front of aircraft
Details
12-23-2015
8.00
Wiring empennage
Details
12-22-2015
8.00
Wiring empennage
Details
12-21-2015
1.00
Finished Skyview network cable
Details
12-20-2015
2.00
Skyview Network Harness
Details
12-20-2015
3.00
ELT wiring harness
Details
12-18-2015
2.00
Finished installation of ADARHS
Details
12-12-2015
8.00
Finished transponder and ADSB receiver harness
Details
12-11-2015
2.00
Transponder avionics harness
Details
12-10-2015
2.00
Worked on wiring
Details
12-08-2015
3.00
Wiring in empennage
Details
12-06-2015
3.00
Wiring harnes in rear empennage
Details
11-29-2015
2.00
Mounted rear avionics
Details
11-28-2015
2.00
Worked on rear avionics tray
Details
11-28-2015
1.00
Installed transponder and ADSB antennas
Details
11-27-2015
8.00
Fabricated rear avionic shelf
Details
11-22-2015
3.00
ADAHRS wire loom
Details
11-21-2015
4.00
Redid wiring to the pitch servo
Details
11-16-2015
1.00
Installed electrical connector
Details
11-05-2015
3.00
Installed OAT and made wiring harness
Details
11-01-2015
6.00
Installed ADAHRS bracket and static line
Details
10-31-2015
5.00
Started ADAHRS bracket
Details
10-29-2015
3.00
Worked on electrical schematics
Details
10-28-2015
3.00
Worked on electrical schematics
Details
12-27-2014
8.00
Roll servo completed
Details
12-26-2014
6.00
Roll servo installation
Details
12-24-2014
1.00
Installed limit stop and safety wire on elev servo
Details
12-23-2014
5.00
Installed elevator autopilot servo
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
579
2177
Avionics
91
534
Canopy
63
202
Empennage
28
104
Engine
99
363
Fuselage
94
384
Gear
62
174
Miscellaneous
22
40
None
2
Wings
118
376