Work Logs Found: 91
Category Work Time: 534 Hours
 Date
Hours
Work Log Summary

Details

 03-26-2019
0.00
Pictures of center tunnel completed
Details
       

 03-09-2019
5.00
Finished installing defrost fans
Details
       

 03-03-2019
3.00
Cutting holes for defrost fans
Details
       

 02-09-2019
40.00
Wire lacing/Tye wrapping
Details

 11-15-2018
2.00
Lacing vertical section of center tunnel
Details
       

 10-28-2018
40.00
Dynon configurations
Details

 09-30-2018
8.00
Configuring avionics
Details

 09-29-2018
7.00
Dynon backup batteries
Details
       

 09-28-2018
4.00
Installed manifold pressure lines
Details
     

 09-23-2018
16.00
Powered up the avionic panel
Details
     

 09-09-2018
8.00
Wiring avionics
Details

 09-08-2018
8.00
Worked on avionics
Details

 09-07-2018
2.00
Right side of VPX completed
Details
       

 09-06-2018
2.00
Installed J1 on VPX
Details
       

 08-26-2018
5.00
Installing the avionic wiring harness
Details
     

 08-26-2018
3.00
Completed wiring harness
Details
     

 08-23-2018
4.00
Finished Garmin connectors
Details
       

 08-21-2018
8.00
More work on the wiring harness
Details
       

 08-18-2018
8.00
Worked on avionics wiring harness

 08-08-2018
1.00
Remounted ELT buzzer
Details
       

 08-07-2018
4.00
Worked on wiring harnesses
Details

 08-05-2018
5.00
Building Skyview Y harness
Details
       

 08-04-2018
8.00
Working on main wiring harness
Details
       

 07-30-2018
3.00
Avionics wiring
Details
       

 07-28-2018
1.00
Installed ELT audio alert
Details
     

 07-28-2018
2.00
Installed ADSB 472
Details
     

 07-21-2018
2.00
Installed charging fuses
Details
       

 07-14-2018
1.00
Installed EarthX trouble lights
Details
     

 07-13-2018
40.00
Time spent running wiring
Details

 07-13-2018
2.00
Accessory batteries for the ACK ELT
Details
     

 06-17-2018
20.00
Flap motor wiring
Details
       

 06-10-2018
3.00
Wired Battery and Fuel selector switch
Details
     

 05-26-2018
40.00
Wiring aircraft
Details
       

 04-09-2018
5.00
Installed manifold pressure sensors
Details
       

 08-25-2017
4.00
Modified GPS mounts
Details
       

 07-05-2017
4.00
Finished heat shield on center wire bundle
Details
       

 07-05-2017
0.00
Additional pictures of the center tunnel heat shie
       

 07-04-2017
2.00
Wiring in forward center tunnel
Details
       

 07-04-2017
4.00
Running wire from rear of aircraft through wing sp
Details
       

 07-02-2017
2.00
Installed COM antennas
Details
       

 07-01-2017
1.00
Installed GPS receivers
Details
       

 06-27-2017
0.00
test

 06-24-2017
6.00
Installing GPS receivers under cowl
Details
       

 06-20-2017
0.50
Installed filter on alt static air
Details
     

 06-19-2017
2.00
HDX backup batteries
Details
       

 06-18-2017
2.00
Installed the SV-EMS-220
Details
     

 06-04-2017
3.00
Alternate static air
Details
       

 06-03-2017
5.00
Static and dynamic test ports
Details
       

 05-30-2017
2.00
Installed avionics
Details
       

 05-21-2017
6.00
Installing avionics
Details
       

 05-20-2017
4.00
Installed instrument panel
Details
       

 05-12-2017
1.00
Fabricated circuit breaker bus bar
Details
     

 05-08-2017
3.00
Building Garmin stack
Details
       

 05-07-2017
1.00
Installed panel
Details
     

 04-29-2017
4.00
Installed secondary ADAHRS
Details
       

 04-15-2017
8.00
Installed Vertical Power and Bus Manager
Details
       

 03-19-2017
3.00
Repainting the instrument panel
Details

 03-12-2017
7.00
Instrument panel painted
Details
       

 03-11-2017
8.00
Instrument Panel ready for painting
Details
       

 12-15-2016
24.00
Instrument panel template
Details
       

 01-01-2016
2.00
Updated the avionics drawings

 01-01-2016
4.00
Finished all wiring behind the baggage bulkhead
Details
       

 12-31-2015
8.00
Worked on avionics and ELT
Details
       

 12-24-2015
1.00
Pulled wire from empennage to front of aircraft
Details
       

 12-23-2015
8.00
Wiring empennage
Details

 12-22-2015
8.00
Wiring empennage
Details

 12-21-2015
1.00
Finished Skyview network cable
Details
       

 12-20-2015
2.00
Skyview Network Harness
Details

 12-20-2015
3.00
ELT wiring harness
Details
     

 12-18-2015
2.00
Finished installation of ADARHS
Details
       

 12-12-2015
8.00
Finished transponder and ADSB receiver harness
Details
     

 12-11-2015
2.00
Transponder avionics harness
Details
       

 12-10-2015
2.00
Worked on wiring
Details

 12-08-2015
3.00
Wiring in empennage
Details
       

 12-06-2015
3.00
Wiring harnes in rear empennage
Details
       

 11-29-2015
2.00
Mounted rear avionics
Details
       

 11-28-2015
2.00
Worked on rear avionics tray
Details

 11-28-2015
1.00
Installed transponder and ADSB antennas
Details
       

 11-27-2015
8.00
Fabricated rear avionic shelf
Details
       

 11-22-2015
3.00
ADAHRS wire loom
Details
     

 11-21-2015
4.00
Redid wiring to the pitch servo
Details
     

 11-16-2015
1.00
Installed electrical connector
Details
     

 11-05-2015
3.00
Installed OAT and made wiring harness
Details
       

 11-01-2015
6.00
Installed ADAHRS bracket and static line
Details
       

 10-31-2015
5.00
Started ADAHRS bracket
Details
       

 10-29-2015
3.00
Worked on electrical schematics
Details

 10-28-2015
3.00
Worked on electrical schematics
Details

 12-27-2014
8.00
Roll servo completed
Details
       

 12-26-2014
6.00
Roll servo installation
Details
       

 12-24-2014
1.00
Installed limit stop and safety wire on elev servo
Details
     

 12-23-2014
5.00
Installed elevator autopilot servo
Details
       