KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
Work Logs Found: 15
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 01-31-2006
1.00
Installed seat back Bids
Details
       

 10-25-2005
2.00
RG Pivot Blocks removed
Details
       

 10-25-2005
3.00
Aileron Bellcranks replaced
Details
       

 09-22-2005
1.00
Released added for the Transponder Ant
Details
     

 09-22-2005
3.00
Gear doors bonded in
Details
       

 09-22-2005
3.00
Gear door access panels added
Details
       

 09-20-2005
0.25
Wing squeeze out
Details
       

 09-20-2005
2.00
Rough fit the gear doors
Details
       

 09-20-2005
2.00
Pressure test the wings
Details
       

 09-16-2005
2.00
Wings - Completed (almost)
Details
       

 09-15-2005
2.00
Wing leading edge cleanup
Details

 09-14-2005
1.50
Wing leading edge bids
Details
       

 09-13-2005
3.50
Close out of right wing
Details
       

 09-13-2005
2.00
Aileron Counter weights
Details
       

 09-12-2005
3.00
Prep and closeout of left wing
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.