KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
Work Logs Found: 62
Category Work Time: 191 Hours
 Date
Hours
Work Log Summary

Details

 09-19-2017
0.00
Oil Seperator
Details
       

 05-25-2017
3.00
Spinner Front Bulkhead Spacers
Details
       

 05-24-2017
1.00
Spinner Backer Layup
Details
     

 05-19-2017
3.50
Spinner Cutting
Details
       

 05-18-2017
1.00
Carburetor Re-installation
Details
     

 03-20-2017
3.00
Additional Engine Safety Work
Details
       

 12-29-2016
2.00
Pre-Oiler
Details
     

 12-28-2016
2.00
Change Spark Plugs + Engine Baffle Sealing +
Details
       

 12-27-2016
7.00
Engine Baffle Seals
Details
       

 12-22-2016
3.00
Engine Baffle Seals
Details
     

 09-24-2016
3.00
Stainless Steel Oil Plumbing
Details
       

 09-19-2016
1.00
Modified Carb Heat Ducting & Fuel Line
Details
       

 08-08-2016
3.00
Cabin Heat and Carb Heat Ducting +
Details
       

 07-19-2016
1.00
Distributer Wiring
Details
       

 07-14-2016
4.00
Oil Cooler Plumbing
Details
       

 07-10-2016
6.00
Engine Baffling
Details
       

 06-21-2016
4.00
EGT/CHT Sensor Wiring
Details
       

 06-20-2016
2.00
Engine Sensor Connector Mounting Bracket
Details
       

 06-19-2016
3.00
Carb Heat Muff
Details
     

 06-16-2016
4.00
Intake Manifold Pressure Tap
Details
       

 06-14-2016
1.50
Cabin Heat Muff
Details
     

 06-04-2016
1.00
Overboard vent line Lower Clamp
Details
       

 06-03-2016
3.00
Crankcase Breather Tube +
Details
       

 06-02-2016
0.75
EGT Thermocouples
Details
       

 06-02-2016
2.00
Carb Heat and Throttle Cables
Details
       

 06-01-2016
1.50
Carburetor Heat Control Cable
Details
       

 05-31-2016
5.00
Carburetor Controls
Details
       

 05-20-2016
2.00
Carb Heat Box Mounted
Details
       

 05-18-2016
12.00
Fabrication of the Carb Heat Box
Details
       

 05-15-2016
0.10
Carb Heat Box Design
Details
       

 04-19-2016
1.00
Engine Baffeling
Details
       

 04-09-2016
2.50
Hanging the Engine
Details
       

 04-08-2016
0.50
Prepping to Hang the Engine on the Fuselage to est
Details
     

 04-07-2016
3.00
Engine Assembly
Details
       

 04-05-2016
5.00
Generator Drive Pins and 5th Bearing Oil Line
Details
       

 04-04-2016
5.00
Rear Generator, Gold Oil System, Oil Pan, and Top
Details
       

 04-02-2016
3.00
Engine Assembly - Rockers & Valve Adjustment
Details
       

 04-01-2016
5.00
Engine Assembly - Left Head and Prop Hub
Details
       

 03-31-2016
6.00
Assembling the Right Cylinder Head
Details
       

 09-19-2015
9.00
Engine Assembly - Corvair College
Details
       

 09-11-2015
2.00
Modifyed Ring Gaps
Details
     

 09-07-2015
3.00
Engine Component Additions
Details
       

 09-05-2015
2.00
Curing the Engine Paint
Details
       

 09-03-2015
3.50
Engine Case Painting
Details
       

 09-02-2015
4.25
Completion of the Fifth Bearing Cover Installation
Details
       

 09-01-2015
3.75
Hybrid Studs & Fifth Bearing Housing
Details
       

 08-30-2015
1.50
Adjusting the Ring Gaps
Details
       

 08-27-2015
3.00
Engine Assembly
Details
       

 08-26-2015
5.00
Engine Assembly
Details
       

 08-23-2015
2.50
Plastigage Bearing Clearance Check
Details
       

 08-18-2015
1.00
Engine Assembly Tools Fabrication
Details
       

 08-11-2015
3.00
Continuation of Engine Component Prep
Details
       

 08-10-2015
2.00
Engine Component Prep
Details
       

 08-09-2015
2.00
Engine Cylinder Painting
Details

 08-08-2015
2.00
Engine Cylinder Painting
Details
       

 08-07-2015
5.00
Engine Component Preparation
Details
       

 08-06-2015
3.00
Cylinder Painting Prep
Details
     

 08-05-2015
3.50
Engine Component Cleanup
Details
     

 08-03-2015
5.00
Engine Component Cleanup
Details
     

 08-01-2015
5.00
Engine Block Cleanup for Assembly
Details
     

 02-12-2015
1.50
Assembling Components to the Rear of the Crankshaf
Details
       

 10-23-2014
2.00
Engine Conversion
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.