Date
|
Hours
|
Work Log Summary
|
Details
|
08-06-2015
|
9.00
|
close up wings
|
Details
|
|
|
08-05-2015
|
2.50
|
install root fairings
|
Details
|
|
|
08-03-2015
|
11.50
|
final install flaps and ailerons
|
Details
|
|
|
07-30-2015
|
8.50
|
wings on!
|
Details
|
|
|
02-09-2015
|
6.00
|
complete wing construction
|
Details
|
|
|
02-07-2015
|
4.50
|
finished nutplates L wing
|
Details
|
|
|
02-06-2015
|
8.00
|
finished flap fairing / boareding step, nutplate w
|
Details
|
|
|
02-04-2015
|
5.50
|
pulled flaps, ailerons, wings
|
Details
|
|
|
02-03-2015
|
7.00
|
flap fairings and wing root fairings cont.
|
|
|
|
01-31-2015
|
8.00
|
complete front attach plates, start on root fairin
|
Details
|
|
|
01-30-2015
|
4.50
|
fabricate front wing attach brackets F-863A
|
|
|
|
01-29-2015
|
8.50
|
finish L and R wing flap and aileron rigging
|
Details
|
|
|
01-28-2015
|
4.50
|
rig and adjust L flap
|
|
|
|
01-27-2015
|
9.00
|
set wing incidence, triangulation, sweep & drill r
|
Details
|
|
|
01-24-2015
|
6.50
|
fit brakes, test fit wings
|
Details
|
|
|
01-14-2015
|
2.00
|
install wingtip lights, and fit finished tips
|
|
|
|
01-08-2015
|
9.00
|
wingtip work cont.
|
Details
|
|
|
01-06-2015
|
2.50
|
wingtip work cont.
|
|
|
|
01-03-2015
|
4.50
|
wingtip fiberglas work cont.
|
|
|
|
01-02-2015
|
3.00
|
R wingtip mount light blister
|
|
|
|
12-27-2014
|
4.00
|
finish rigging R wing, fiberglas work cont.
|
|
|
|
12-26-2014
|
7.50
|
R wing cont
|
|
|
|
12-23-2014
|
3.00
|
R wing bottom skin
|
Details
|
|
|
12-22-2014
|
2.00
|
countersink bottom R wing skin
|
|
|
|
12-20-2014
|
5.00
|
install R wing bellcrank, NACA vents
|
|
|
|
12-19-2014
|
8.00
|
R Wing
|
|
|
|
12-13-2014
|
3.00
|
leak test wings, wing tip fiberglas work cont.
|
Details
|
|
|
12-10-2014
|
5.50
|
fiberglas work on tips
|
|
|
|
12-08-2014
|
6.50
|
fiberglass work on L wing tip, leak test R wing
|
Details
|
|
|
12-05-2014
|
7.00
|
finish L wing tip fit, rig flap controls
|
|
|
|
12-04-2014
|
8.50
|
install flap hinge, fit wing tip
|
|
|
|
12-03-2014
|
3.00
|
fabricate aileron control stops, install on L wing
|
|
|
|
12-02-2014
|
5.00
|
modify aileron bracket for proper operation
|
Details
|
|
|
12-01-2014
|
8.00
|
finish riveting L wing bottom skin, test fit airle
|
|
|
|
11-24-2014
|
6.00
|
begin installing final skin L wing
|
|
|
|
11-22-2014
|
6.00
|
redo landing light lens, rig aileron bellcrank
|
|
|
|
11-20-2014
|
9.00
|
prep pitot tube, install landing light in L wing
|
Details
|
|
|
11-19-2014
|
4.50
|
install conduit and pitot heat box in L wing
|
|
|
|
11-17-2014
|
5.00
|
wings assembly
|
Details
|
|