Date
|
Hours
|
Work Log Summary

|
Details

|
08-12-2007
|
2.00
|
Jury struts final
|
|
|
|
08-11-2007
|
3.00
|
Aleron and hinge rivet
|
|
|
|
05-12-2007
|
2.00
|
Fishing fabric work on wings
|
|
|
|
04-28-2007
|
4.00
|
Taping wings cont.
|
Details
|
|
|
04-21-2007
|
6.00
|
Riveting and Taping wings
|
|
|
|
04-07-2007
|
2.00
|
Painting first coat of PolyBrush on wings
|
|
|
|
02-24-2007
|
4.00
|
Covered alerons with fabric
|
|
|
|
01-02-2007
|
2.00
|
Final ironing of wings at 350'
|
|
|
|
12-03-2006
|
4.00
|
|
|
|
|
12-02-2006
|
6.00
|
Finishing the wing ends
|
|
|
|
11-25-2006
|
4.00
|
Covering top side and ends
|
|
|
|
11-24-2006
|
5.00
|
Covering top side of wings
|
|
|
|
11-23-2006
|
6.50
|
Getting ready to put down glue
|
|
 |
|
11-23-2006
|
4.00
|
Covering bottom of wings
|
|
|
|
11-22-2006
|
6.00
|
Covering wings
|
|
|
|
10-05-2006
|
2.00
|
Took wings off to cover plane
|
|
 |
|
04-22-2006
|
4.00
|
Boxed wing tips
|
Details
|
|
|
04-08-2006
|
6.00
|
Jury Struts
|
|
|
|
03-11-2006
|
2.00
|
Bending jury strut barcketts.
|
Details
|
 |
|
03-09-2006
|
3.00
|
Cutting holes in streamlined strut fariing covers
|
Details
|
|
|
03-07-2006
|
3.00
|
Jury strut constuction
|
Details
|
|
|
03-05-2006
|
5.00
|
Strut fairings
|
Details
|
|
|
10-23-2004
|
3.00
|
Installed wing fiberglass wing tips.
|
Details
|
 |
|
10-17-2004
|
3.00
|
Wing tips
|
Details
|
 |
|
09-11-2004
|
3.00
|
Installed wing hinges
|
Details
|
 |
|
09-10-2004
|
4.00
|
Wing hinges
|
Details
|
 |
|
08-27-2004
|
5.00
|
Installed wing ribs
|
Details
|
 |
|
08-14-2004
|
6.00
|
Installed wing ribs
|
Details
|
 |
|
07-31-2004
|
6.00
|
In-board and out-board wing panels
|
Details
|
 |
|
07-24-2004
|
8.00
|
In-board and out-board wing panels
|
Details
|
|
|
07-10-2004
|
6.00
|
In-board and out-board wing panels
|
Details
|
 |
|
06-10-2004
|
2.50
|
In-board and out-board wing panels
|
Details
|
 |