Swami's Web Site
Work Logs Found: 223
Category Work Time: 698 Hours
 Date
Hours
Work Log Summary

Details

 05-31-2020
4.00
Re-install of interior; install cowling (interfere
Details
       

 05-05-2020
2.00
Install fuel valve, fwd spar covers,left wing wiri

 04-06-2020
3.50
install sticks; secure rudder pedal cables w/cotte

 03-14-2020
6.00
rivet seat floor; install flap/center brace
Details

 02-18-2020
2.50
install canopy supertracks; move fiberglass workon

 01-25-2020
1.00
Fab new control bracket
Details

 01-04-2020
3.00
Throttle cable hole to big. ordered new attach bra
Details

 01-02-2020
3.50
Install control cables. Throttle, Prop, Mixture
Details

 12-29-2019
2.50
Finish cabin heat install; wire compass lt, secure
Details

 12-28-2019
6.00
Install cabin vent hose; Install cabin heat cable

 07-15-2019
1.50
Rivet cowl hinge to firewall; rivet main spar cove
Details

 07-15-2019
3.00
Finish riveting cowl hinge to firewall; tighten lo
Details
     

 07-14-2019
3.00
start riveting fwd fuse top skin
Details
     

 06-22-2019
1.50
install adel clamps to ADAHRS wire harness
Details

 06-11-2019
1.00
Final fit front center fuel and wire pass-through
Details
     

 04-20-2019
3.00
cut holes and install defrost fans
Details
       

 02-03-2019
1.00
Remove and trim left fuselage parking brake attach
Details

 01-09-2019
1.00
Drill seat rib pass through for stick grip wires
Details
     

 01-07-2019
1.00
repaired right wheel brake leak
Details

 01-05-2019
3.50
start wire routing for stick grip
Details

 01-01-2019
3.50
work on stick grip installation
Details

 12-30-2018
2.00
Fab to install right stick grip
Details
     

 12-27-2018
5.00
Install brackets for Comm ant wires
Details

 12-24-2018
1.50
install static line mounts
Details

 10-07-2018
0.50
Install ELT antenna doubler
Details

 10-07-2018
1.00
Fab ELT antenna doubler
Details

 10-01-2018
1.50
Fab doubler for GPS antenna
Details

 09-22-2018
2.00
more roll-bar handle repair and start stick grip
Details

 09-21-2018
2.50
removed roll-bar handles
Details

 09-21-2018
1.50
re-route tail strobe wire
Details

 09-09-2018
1.00
Install roll bar handles
Details

 07-11-2018
1.00
finish parking brake cable, install GPS subpanel a
       

 07-10-2018
2.00
rivet panel vent angle attach, install parking bra

 07-08-2018
1.50
Fabricate parking brake cable attachment, prime, p

 12-30-2017
1.00
move brake pedals back one hole
Details

 11-19-2017
2.50
install l/r/rudder access inspect covers
Details
     

 11-18-2017
4.50
re-install elevator pushrod. start canopy assy

 11-17-2017
2.00
reshape center fuselage pushrod pass through
Details

 11-13-2017
1.00
replace two brake lines with longer tube

 08-25-2017
1.50
replace bad rivet in fwd top fuse rib
Details
     

 08-14-2017
3.00
rivet aft top skin
     

 08-13-2017
3.50
rivet rear top skin
Details
       

 08-11-2017
2.00
rivet canopy deck, cabin vent angle attachment

 08-11-2017
3.50
prep aft top fuse skin for install
Details
       

 08-09-2017
4.00
fab cabin vent panel attach, prime

 08-08-2017
3.00
install brake lines
       

 08-06-2017
3.50
finish riveting fwd fuse.
Details

 08-05-2017
5.00
rivet fwd upper fuselage structure
     

 08-05-2017
3.50
fab/install Pbrake cable bracket. Start Canopy rol

 07-16-2017
1.50
install parking brake valve and tubing

 06-19-2017
1.00
start riveting brake doubler/red cube shelf to fir

 06-17-2017
4.00
install brake doubler, red cube shelf

 06-17-2017
1.50
complete doubler and red cube shelf

 06-11-2017
3.50
install fuel vent. fab fuel line-pump to firewall

 06-11-2017
1.50
fabricate firewall fuel line doubler

 06-11-2017
2.00
biuld park brake mount doubler
       

 06-10-2017
1.00
install (pro seal) heater box, transducer manifold
     

 06-10-2017
10.00
drill NACA air vents to fuse
Details
     

 06-07-2017
1.00
finish painting cabin

 06-06-2017
2.50
Paint center fuse (enamal). start battery box

 05-17-2017
1.00
prep for final cabin paint

 05-13-2017
2.00
install oil seperator doubler on firewall
Details

 05-09-2017
3.00
finish brake pedals, trim gear leg holes in firewa
Details
       

 05-06-2017
1.00
complete install of engine mount
     

 05-05-2017
3.50
Begin install Engine Mount

 05-04-2017
2.50
install left brake pedals

 04-24-2017
2.00
rivet aft fuse stiffner web
Details
     

 04-24-2017
2.50
complete install of ADAHRS shelf
     

 04-23-2017
1.00
start to fab/install ADAHRS shelf

 04-18-2017
2.00
install TS fuel lines. Tighten flap blocks
       

 03-11-2017
1.00
rivet center fuel pump cover attach angles
     

 02-12-2017
5.00
complete fabrication of fuel pump cover, Prime
       

 02-11-2017
1.00
start fabrication of fuel pump cover
       

 01-30-2017
1.00
remove rudder cable exit covers
Details

 01-29-2017
1.00
Prime fwd fuse ctr tunnel parts

 01-25-2017
1.00
prep fwd fuse ctr tunnel for primer

 01-23-2017
1.00
design fuel pump cover. fab wing drift pins

 01-22-2017
3.50
complete fab of fwd ctr fuse tunnel for pump

 01-21-2017
4.00
install EFII fuel pump brackets
Details
     

 01-15-2017
2.00
fab and install right fuel vent line
     

 01-07-2017
3.50
fab fuel vent lines. install left vent line
Details
       

 10-16-2016
1.00
Prime left bottom wing skin
Details

 10-15-2016
10.00
Install static ports and static lines
Details
     

 09-07-2016
2.00
Finish last piece of fwd top fuselage
Details

 09-05-2016
5.00
Install stick controls. start elec. trim install
Details

 09-03-2016
3.00
finish fwd fuselage parts
Details

 08-31-2016
1.50
debur upper fwd fuse parts
Details

 08-29-2016
13.00
Forward top fuselage
Details
     

 08-28-2016
5.75
dimple aft skins, stick boot ring, Fwd seat floor
Details

 08-27-2016
7.50
Install aft fuse gusset. prep aft skin and fwd fus
Details
     

 08-26-2016
2.00
finish baggage floor, flap actuator cover
Details
       

 08-25-2016
1.75
Install right side baggage floor
Details
     

 08-19-2016
5.00
install conduit holders, rudder cables, baggage si
Details
     

 08-14-2016
2.00
Fab wire conduit holders
Details
     

 08-06-2016
5.00
Flap bearing and covers
Details
     

 08-03-2016
5.00
Install Pitot and AOA lines
Details

 07-04-2016
4.50
Flap motor interior cover
Details

 07-03-2016
4.00
Interior Flap motor install
Details

 07-02-2016
6.00
forward fuselage interior covers
Details
     

 06-27-2016
10.25
seat backs. Fwd fuselage covers
Details
     

 06-26-2016
6.00
tunnel cover
Details
       

 06-25-2016
1.50
baggage bulkhead
Details

 06-24-2016
3.00
Baggage bulkhead
Details

 06-23-2016
3.00
baggage bulkhead shoulder harness cable guide
Details

 06-22-2016
3.00
baggage bulkhead
Details
       

 06-14-2016
1.75
baggage area
Details

 06-12-2016
2.00
fuselage baggage bulkhead
Details
       

 06-11-2016
8.50
Fuselage assembly
Details
       

 06-10-2016
2.25
fuselage assembly
Details
       

 06-08-2016
3.50
fuselage assembly
Details
       

 06-06-2016
2.00
fuselage
Details
     

 06-05-2016
3.00
fuselage
Details
       

 06-04-2016
3.00
fuselage
Details

 06-01-2016
5.00
fuselage aft deck
Details

 05-31-2016
2.00
Leveled fuselage
Details
       

 05-30-2016
9.50
Fuselage assembly
Details
       

 05-29-2016
5.00
fuselage assembly
Details
     

 05-28-2016
8.50
fuselage assembly
Details
       

 05-27-2016
11.00
fuselage assembly
Details
       

 05-18-2016
1.50
fuselage assembly
Details

 05-16-2016
2.50
fuselage assembly
Details
     

 05-15-2016
3.00
fuselage assembly
Details
       

 05-12-2016
1.00
fuselage assembly
Details

 05-10-2016
3.00
fuselage assembly
Details

 04-18-2016
2.00
interior
Details

 04-17-2016
2.00
interior
Details

 04-16-2016
2.00
interior
Details

 03-13-2016
1.00
fuselage
Details
     

 03-12-2016
3.50
fuselage
Details

 03-06-2016
3.00
fuselage
Details

 03-05-2016
6.50
fuselage assy
Details

 02-29-2016
1.50
fuselage
Details

 02-28-2016
3.00
fuselage
Details

 02-27-2016
2.50
fuselage
Details

 02-20-2016
2.50
fuselage
Details

 02-06-2016
1.50
fuselage
Details

 01-30-2016
5.00
fuselage
Details

 12-12-2015
3.25
Center + Forward fuselage
Details
     

 12-05-2015
7.00
center section
Details
       

 12-04-2015
4.00
forward fuselage section
Details

 12-03-2015
4.50
forward fuselage section
Details
     

 12-02-2015
6.00
forward fuselage section
Details

 11-22-2015
2.00
Forward Fuselage section
Details
     

 11-21-2015
2.00
forward Fuselage section
Details

 11-18-2015
1.25
Forward Fuselage section
Details

 11-17-2015
2.00
forward Fuselage section
Details

 11-16-2015
1.50
forward fuelage section
Details

 11-15-2015
3.50
forward fuselage section
Details

 11-14-2015
8.00
fwd fuselage section
Details
       

 11-11-2015
6.75
aft + center fuselage section
Details
     

 11-09-2015
2.50
install firewall to fuselage
Details

 11-08-2015
6.50
aft+center section
Details

 11-07-2015
3.50
aft + center section
Details
     

 11-06-2015
1.00
aft + center fuselage section
Details
     

 11-04-2015
0.50
aft fuselage section
Details

 10-29-2015
2.50
aft fuselage section
Details

 10-25-2015
2.50
aft fuselage section
Details

 10-24-2015
2.00
center section
Details
     

 10-12-2015
4.00
aft fuselage sectioin + center section
Details

 09-19-2015
6.50
aft fuselage section
Details
       

 09-18-2015
7.75
aft fuselage section
Details

 09-12-2015
7.75
aft fuselage section
Details

 09-07-2015
6.75
aft fuselage section
Details
       

 09-05-2015
4.25
center section + aft fuselage
Details
     

 09-04-2015
2.00
center section
Details

 08-31-2015
2.00
center section
Details

 08-23-2015
1.50
center section
Details

 08-22-2015
1.50
center section
Details

 08-21-2015
1.00
center section
Details

 08-19-2015
1.00
center section
Details

 08-08-2015
6.50
center section
Details
 

 08-03-2015
1.00
center section
Details

 08-02-2015
0.50
Rivet Crotch Strap Bracket

 08-02-2015
0.50
center section
Details
     

 07-29-2015
2.50
center section
Details
     

 07-28-2015
3.00
center section
Details
     

 06-23-2015
2.50
center section
Details

 06-21-2015
0.50
center section
Details

 06-20-2015
2.25
center section
Details

 06-14-2015
4.00
center section
Details

 06-13-2015
3.00
center section
Details

 06-12-2015
4.00
center section
Details

 06-02-2015
2.00
move construction to big garage
     

 05-30-2015
1.00
center section
Details

 03-14-2015
3.50
center section
Details
       

 03-13-2015
0.50
center section
Details

 03-07-2015
1.00
Center Section
Details
     

 03-02-2015
7.00
center section
Details
       

 03-01-2015
3.00
Center Section
Details

 02-28-2015
1.50
tailcone + aft fuselage
Details
     

 02-27-2015
6.00
tailcone + aft fuselage
Details
       

 02-21-2015
6.75
Longerons. tail cone
Details
     

 02-18-2015
1.50
Longerons
Details

 02-15-2015
1.00
Longerons
Details

 02-14-2015
4.50
710 bulkhead. Longerons
Details
       

 02-13-2015
3.00
706 FWD Fuselage Bulkhead. 707-712 bulkheads
Details

 02-08-2015
3.00
706 FWD Fuselage Bulkhead. 707-712 bulkheads
Details
     

 02-07-2015
6.50
706 FWD Fuselage Bulkhead. 707-710 bulkheads
Details

 01-28-2015
2.75
706 FWD Fuselage Bulkhead
Details

 01-27-2015
2.50
705 Bulkhead
Details
       

 01-25-2015
2.00
705 Bulkhead
Details

 01-24-2015
5.00
705 Bulkhead
Details

 12-22-2014
5.00
705 Bulkhead
Details

 12-16-2014
3.00
705 Bulkhead
Details
       

 12-15-2014
3.50
705 Bulkhead
Details
       

 12-12-2014
5.50
Center Bulkead
Details
       

 12-12-2014
2.00
Center Bulkead
Details

 12-10-2014
1.50
Center Bulkead
Details

 12-08-2014
3.00
Center Bulkead
Details

 12-06-2014
2.00
Center Bulkead
Details

 12-06-2014
4.00
Center Bulkead
Details

 12-05-2014
4.00
Center Bulkead
Details

 11-22-2014
1.25
Firewall
Details

 11-22-2014
2.00
Firewall
Details

 11-22-2014
4.00
Firewall
Details

 11-18-2014
3.50
Firewall
Details
     

 11-17-2014
4.00
Firewall
Details
       

 11-17-2014
1.75
Fabricate firewall parts
Details

 11-16-2014
2.00
Inventory and begin fuselage construction
Details

 11-16-2014
1.00
Fab parts
Details

 11-15-2014
5.00
Inventory Parts
Details

 11-11-2014
2.50
recieved fuselage crate
Details
       

 11-11-2014
2.50
inventory parts
Details