KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
Work Logs Found: 85
Category Work Time: 259 Hours
 Date
Hours
Work Log Summary

Details

 04-25-2020
1.00
secure and adjust elev trim tab
Details

 04-25-2020
1.25
adjust elevator travel
Details

 03-23-2020
6.50
complete rudder glass and install; more fwf secure

 03-15-2020
7.00
more glass work on rudder; install aionics
Details

 03-14-2020
2.50
glass rudder bottom

 03-13-2020
7.00
finish emp trim; more rudder glass; install nutpla

 03-08-2020
3.50
Fit emp trim seal; rework rudder bottom dueto conf
Details

 03-07-2020
1.50
glass L H stab tip

 03-02-2020
0.50
sand R H stab tip

 02-29-2020
1.00
add glass to H stab tip

 02-20-2020
1.00
More glass work on emp tips

 02-19-2020
1.50
glass H stabgap filler; add glass to elevator tip

 02-18-2020
2.50
Temp installrudder; stab glass work

 02-17-2020
1.00
Installed H stab tips;emp gap cover
     

 02-16-2020
2.00
riveted elevator fiberglass tips

 02-10-2020
6.00
finished elev/H stab fiberglass-ready to rivet
Details

 02-09-2020
2.00
trim and drill elev fiberglass tips

 02-08-2020
6.50
finish rudderfiberglass bottom
Details

 02-07-2020
3.50
emp fairing and gap sealalmost complete
Details

 02-05-2020
2.50
drill out longeron rivets for gap seal trim
Details

 02-02-2020
2.50
Begin installing emp fairing nut plates

 02-01-2020
2.00
match drill empannage fairing
Details

 01-31-2020
2.50
install and torque H + V stabilizer; run wires

 01-30-2020
1.00
drilled tail strobe wire passthrough

 01-26-2020
2.50
Started attaching empenage to fuselage in hanger

 06-08-2017
3.50
remove vert stab. rivet stab spar
Details

 06-05-2017
1.50
cut rudder stop to short! start painting Cabin

 06-04-2017
3.00
begin trimming rudder stop
Details
     

 06-03-2017
1.00
adjust rudder bearings

 06-02-2017
2.50
fab and drill UP elevator stop

 05-13-2017
2.00
start installing vertical stab
       

 05-07-2017
3.00
complete Horiz stab install

 05-06-2017
2.00
Drilled Horiz elevator horn-start install
       

 10-26-2014
3.50
Elevator
Details
       

 10-24-2014
1.50
Elevator
Details
       

 10-24-2014
2.50
Elevator
Details

 10-23-2014
1.00
Elevator
Details
     

 10-19-2014
2.50
Elevator
Details

 10-18-2014
4.00
Elevator
Details

 10-18-2014
2.50
Elevator
Details

 09-29-2014
3.50
Elevator
Details
       

 09-29-2014
3.25
Elevator
Details
       

 09-27-2014
6.50
Elevator
Details

 09-27-2014
2.00
Elevator
Details

 09-25-2014
1.25
Elec trim plate
Details

 09-21-2014
3.50
Elevator
Details

 09-21-2014
2.00
Elevator
Details

 09-20-2014
4.50
Elevator
Details
     

 09-20-2014
4.00
Elevator
Details
     

 09-19-2014
1.00
Elevator
Details

 09-18-2014
2.50
Elevator
Details

 09-18-2014
0.75
Elevator
Details

 09-07-2014
0.50
Rudder
Details
     

 09-06-2014
1.50
Rudder
Details
     

 09-06-2014
4.50
Rudder
Details

 08-30-2014
1.00
Rudder
Details

 08-30-2014
5.50
Rudder
Details

 08-27-2014
2.00
Elevator
Details
       

 08-23-2014
2.25
Elevator
Details

 08-23-2014
6.00
Elevator
Details

 08-18-2014
2.50
Elevator
Details

 08-18-2014
2.00
Elevator
Details
       

 08-17-2014
1.75
Elevator
Details

 08-17-2014
2.25
Elevator
Details

 08-15-2014
2.50
Rudder
Details

 08-15-2014
3.50
Rudder
Details

 08-14-2014
1.50
Rudder
Details

 08-11-2014
1.00
Rudder
Details

 08-09-2014
6.00
Rudder
Details
     

 08-08-2014
8.00
Rudder
Details
     

 08-02-2014
3.25
Verticle Stabilizer
Details
     

 07-21-2014
1.50
Horizontal stabilizer
Details
       

 07-20-2014
3.00
horizontal stabilizer
Details

 07-19-2014
2.00
Rivet horizontal stabilizer skins
Details

 07-18-2014
5.25
rivet horizontal stabilizer
Details
     

 06-12-2014
2.50
Finish riveting spars, prep H.S to rivit skins
Details

 06-09-2014
7.50
Vertical Stab- debur, finish parts, prime, rivet r
Details
     

 06-08-2014
4.50
Start Vertical Stab
Details

 06-07-2014
7.50
Horizontal Stab dimple and prime. Begin assembly
Details
     

 06-06-2014
2.00
dimpling L and R Horizontal stab parts
Details

 06-01-2014
3.00
debur, finish right horizontal stab ribs, spars
Details

 05-31-2014
3.50
Horizontal Stab debur left side flanges and spars
Details

 05-26-2014
4.00
left stab matchdrilled
Details
       

 05-25-2014
2.50
plan
Details

 05-24-2014
11.50
Project start
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.