KitLog pro

Powered By Kitlog Pro v2.0

Darrel's Kitfox - SS7
Work Logs Found: 26
Category Work Time: 92 Hours
 Date
Hours
Work Log Summary

Details

 06-24-2020
2.00
DAR grants airworthiness certificate
Details
 

 06-14-2020
1.80
HS installation comleted
Details

 06-13-2020
1.00
Installed empennage and flaperons
Details

 06-12-2020
1.50
Moved the plane to George's Hangar
Details
       

 06-10-2020
3.20
Completed a door lock for the pilot's door
Details
 

 06-04-2020
3.00
Painted the inside of the lower cowl
Details
 

 06-02-2020
5.00
Fabricated transport struts
Details

 05-29-2020
5.20
Various small tasks
Details
     

 05-27-2020
5.10
Moved carb vent line to the air filter
Details
 

 05-16-2020
5.00
Assembled the plane to take measurements
Details
       

 05-12-2020
4.20
Prepared the paint shop to spray the wing
Details

 05-11-2020
7.20
Closed out several part installations
Details
       

 05-09-2020
5.10
Finished console and throttle cable installations
Details
       

 05-08-2020
1.30
More installation of the console effort
Details

 04-30-2020
3.50
Gray on cowls and carb mandatory service bulletin
Details
 

 04-28-2020
2.50
More labels and worked on choke cable
Details
       

 04-27-2020
5.30
Tied brake lines, SB on carb and installed wheels
Details
       

 04-20-2020
4.00
Fabricated the data plate
Details
       

 02-02-2019
1.00
Mount fuselage to rotisserie
Details

 01-31-2019
1.70
Test panel first coat of fabric sealer
Details
     

 01-30-2019
2.50
Finished the Stewart System Test Panel
Details
 

 01-29-2019
3.50
Finished the instrument panel
Details
       

 01-28-2019
2.20
Map Box Construction
Details
 

 01-25-2019
7.00
Map Box modification and install
Details
       

 01-23-2019
1.10
Continued cutting instrument panel
Details

 12-03-2018
7.10
ASI line, Mag line, Pitot tube orientation, routin
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.