KitLog pro

Powered By Kitlog Pro v2.0

JOHN LUKE'S WEB SITE
Work Logs Found: 32
Category Work Time: 140 Hours
 Date
Hours
Work Log Summary

Details

 04-17-2015
4.50
Right mag repair
Details

 03-02-2015
8.00
Prop install, spark plugs, ELT install
Details

 02-28-2015
4.50
Baffle finish, oil cooler, P-leads
Details

 02-23-2015
3.00
Rear baffle installation
Details

 02-22-2015
3.50
Rear baffle rubber installation
Details

 02-16-2015
6.00
Fuel Lines, baffle painting, oil breather line
Details

 02-15-2015
3.50
Baffle repair and fresh air vent
Details

 02-14-2015
3.00
Throttle bracket install
Details

 02-13-2015
3.00
Throttle bracket fabrication
Details

 02-09-2015
8.00
Baffle fitting/oil cooler mount
Details

 02-08-2015
4.50
Initial baffle trim/carb heat
Details

 02-06-2015
2.50
Finished airbox
Details

 02-05-2015
4.00
Air box work
Details

 02-01-2015
3.50
Spinner and airbox
Details

 01-31-2015
2.00
Right front baffle
Details

 01-30-2015
3.50
Baffle riveting
Details

 01-26-2015
7.50
Mags, baffle, engine sensors, etc...
Details

 01-25-2015
3.00
Pressure manifold, engine fittings
Details

 01-12-2015
8.00
Cowling cheek fit/misc. engine work
Details

 01-10-2015
1.00
Prop extension repair
Details

 01-03-2015
7.00
Baffle
Details

 12-24-2014
3.00
Baffle assembly
Details

 12-23-2014
4.50
Fairings and baffle
Details

 12-22-2014
8.00
Engine reassembly continued
Details

 12-21-2014
1.50
Alternator hanging
Details

 11-02-2014
3.00
Left side cowling fasteners
Details

 11-01-2014
4.50
Cowling fasteners
Details

 06-14-2014
5.00
Misc. work
Details

 06-08-2014
5.00

Details

 06-07-2014
6.00
Hung Engine!
Details

 06-01-2014
4.00
Mount prep work
Details

 05-16-2014
2.50
- Changed fuel lines on the engine
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.