RV-6A
Empennage
Work Logs Found:
28
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
07-08-2019
5.00
Installed tail
Details
06-30-2019
8.00
Installed tail feathers
Details
06-02-2019
5.00
Fixing elevator
Details
05-19-2019
10.00
Empennage lower fairings
Details
05-12-2019
3.00
Empennage fairing
Details
05-10-2019
12.00
Empennage fairing
Details
04-06-2019
5.00
Building stabilizer fairing
Details
07-17-2016
1.50
Empennage fairing
Details
07-16-2016
2.00
Fairing on empennage
Details
02-12-2016
2.00
Empannage fairing
Details
12-06-2015
4.00
Seat belt harness support
Details
12-05-2015
3.00
Rudder fairing finished
Details
12-04-2015
5.00
Worked on lower rudder fairing
Details
11-29-2015
2.00
Rudder end cap
Details
11-29-2015
1.00
Finished ends of elevators
Details
11-28-2015
1.00
Elevator end closure
Details
11-26-2015
1.00
Worked on smoothing the elevator ends
Details
11-25-2015
2.00
Ran rear nav light wire from rudder to vert stab
Details
11-22-2015
4.00
Routing rear nav light wiring
Details
11-20-2015
2.00
Sealing up ends on horizontal stabilizer
Details
11-16-2015
2.00
Sealed ends of horizontal stabilizer
Details
11-14-2015
3.00
More work on the elevators
Details
11-12-2015
2.00
Sealing ends of elevator
Details
10-03-2015
4.00
Moving fuselage into main shop
Details
12-06-2014
4.00
Installed vertical stabilizer and rudder
Details
12-05-2014
4.00
Connected linkage to elevator
Details
11-29-2014
2.00
Installed the horizontal stabilizer
Details
11-01-2014
4.00
Preparing my shop to assemble aircraft
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
579
2177
Avionics
91
534
Canopy
63
202
Empennage
28
104
Engine
99
363
Fuselage
94
384
Gear
62
174
Miscellaneous
22
40
None
2
Wings
118
376