Date
|
Hours
|
Work Log Summary
|
Details
|
08-24-2015
|
4.00
|
Set up and sand wing for paint.
|
|
|
|
08-14-2015
|
4.00
|
Finished R. wing tip
|
|
|
|
08-13-2015
|
4.50
|
Continue working on R. wing tip
|
|
|
|
08-12-2015
|
4.50
|
Continue working on bonding and sanding R. wingtip
|
|
|
|
08-10-2015
|
1.00
|
Installing lens in R wingtip
|
|
|
|
08-03-2015
|
3.00
|
Complete R wing riveting. Work on R. wing tip.
|
|
|
|
07-31-2015
|
4.00
|
Finish riviting on bottom skin and work on wing ti
|
|
|
|
07-30-2015
|
3.00
|
Riveting R. wing bottom skin
|
|
|
|
07-29-2015
|
5.50
|
Install plexiglass on Left wingtip. Start R. wingt
|
|
|
|
07-28-2015
|
7.00
|
L. wing tip. Landing and position light and attach
|
|
|
|
07-27-2015
|
3.00
|
Continue riveting bottom skin
|
|
|
|
07-16-2015
|
5.00
|
Started riveting R. wing outside bottom skin
|
|
|
|
07-15-2015
|
3.00
|
Begin installing the Right wing botto
|
|
|
|
07-14-2015
|
2.50
|
Install Aileeron and flap gap fairing
|
|
|
|
06-25-2015
|
3.00
|
Filling and sanding the L wing tip
|
|
|
|
06-24-2015
|
3.00
|
Continue fiberglassing plus work on R wing wiring
|
|
|
|
06-23-2015
|
1.00
|
Fiberglassing in new (larger) light cutout
|
|
|
|
06-17-2015
|
3.00
|
Fitting L wing tip and fitting landing light conve
|
|
|
|
06-16-2015
|
7.00
|
Finished and installed all aileron push rods
|
|
|
|
06-15-2015
|
2.00
|
Continue makingaileron push pull rods
|
|
|
|
06-12-2015
|
3.00
|
Continued making aileron pushrods
|
|
|
|
06-11-2015
|
1.50
|
Started making the aileron push rods.
|
|
|
|
06-11-2015
|
5.00
|
Finally got the aileron clamped and riveted
|
|
|
|
06-10-2015
|
6.00
|
Riveting R aileron
|
|
|
|
06-09-2015
|
7.00
|
Working on Right aileron
|
|
|
|
06-05-2015
|
5.00
|
Completed the Left Aileron
|
|
|
|
06-04-2015
|
7.00
|
Half way through the left aileron
|
|
|
|
06-03-2015
|
5.00
|
Assemble both ailerons
|
|
|
|
06-02-2015
|
2.00
|
Started on the ailerons
|
|
|
|
06-02-2015
|
6.00
|
Completed both flaps
|
|
|
|
06-01-2015
|
6.00
|
R. wing flap - assembled, drilled, disassembled,de
|
|
|
|
05-29-2015
|
2.00
|
Finish riveting the Left Flap
|
|
|
|
05-28-2015
|
4.00
|
Continue riveting the L wing flap
|
|
|
|
05-27-2015
|
6.00
|
Started riveting the flap together
|
|
|
|
05-26-2015
|
2.50
|
countersinking and dimpling L wing flap
|
|
|
|
05-15-2015
|
7.00
|
Working on assemblying part for the flaps
|
|
|
|
05-14-2015
|
2.00
|
Preping parts for flaps
|
|
|
|
05-12-2015
|
1.50
|
Preping parts
|
|
|
|
05-11-2015
|
4.00
|
Install R. wing tank on the right wing spar.
|
|
|
|
05-06-2015
|
5.00
|
Riveted the back and Z brackets on the R fuel tank
|
|
|
|
05-05-2015
|
7.00
|
Finished installing ribs and fuel tank level float
|
|
|
|
05-04-2015
|
3.50
|
Finished riveting in all the ribs except the inboa
|
|
|
|
05-01-2015
|
3.00
|
Rivet ribs in R fuel tank
|
|
|
|
04-30-2015
|
6.50
|
R. fuel tank - rivet flanges, fuel cap, and fuel d
|
|
|
|
04-23-2015
|
3.00
|
dimpling fuel tank skin and preparing parts.
|
|
|
|
04-22-2015
|
7.00
|
Preping parts for the R. fuel tank
|
|
|
|
04-21-2015
|
1.50
|
Rivet the R. outboard leading edge to the main spa
|
|
|
|
04-21-2015
|
1.50
|
Prep R wing leading edge for riveting to wing.
|
|
|
|
04-17-2015
|
6.00
|
Riveted R. wing outboard leading eadge
|
|
|
|
04-16-2015
|
6.00
|
Preping R outboard leading edge for riveting
|
|
|
|
04-14-2015
|
7.50
|
Rivet top skin to R. Wing. cleko outboard forward.
|
|
|
|
04-13-2015
|
8.00
|
R. wing top skin preped and ready to rivet
|
|
|
|
04-10-2015
|
2.50
|
Finished riveting the rear spar to the R. wing
|
|
|
|
04-09-2015
|
4.50
|
Prepare and cleko rear spar to R. wing
|
|
|
|
04-07-2015
|
5.00
|
Finished rib install. Made parts for rear spar.
|
|
|
|
04-06-2015
|
2.00
|
bolt and rivet ribs to main spar
|
|
|
|
04-03-2015
|
2.50
|
Install ribs in left wing
|
|
|
|
04-02-2015
|
3.00
|
Preping ribs for install to main spar
|
|
|
|
04-01-2015
|
7.00
|
Finish readying spar and start readying ribs
|
|
|
|
03-31-2015
|
4.50
|
Install nutplates and counersink R. wing main spar
|
|
|
|
03-27-2015
|
3.00
|
R wing spar J strips and countersinking
|
|
|
|
03-26-2015
|
2.50
|
Finish L wing. Start on R. wing spar
|
|
|
|
03-25-2015
|
2.00
|
Finished l wing
|
|
|
|
03-24-2015
|
6.50
|
Continue riviting on the bottom skin - left wing
|
|
|
|
03-23-2015
|
8.00
|
Pitot static and begin riveting lower skin
|
Details
|
|
|
03-13-2015
|
3.00
|
Dimple outer lower wing skin and readfy for riveti
|
|
|
|
03-10-2015
|
4.00
|
Start dimpling bottom skins and design AHRS base.
|
Details
|
|
|
03-06-2015
|
8.00
|
Started preparing the bottom skin for install
|
|
|
|
02-20-2015
|
4.00
|
Attach fuel tank to left wing
|
|
|
|
02-19-2015
|
7.00
|
Wing leading edge
|
Details
|
|
|
02-18-2015
|
4.00
|
Riveting the L wing outboard leading edge
|
|
|
|
02-06-2015
|
1.00
|
Final work on Left wing tank. Next - install on wi
|
|
|
|
02-05-2015
|
1.00
|
Pressure test the left wing tank. Tested OK.
|
|
|
|
02-03-2015
|
2.00
|
Repaired Leak in Left wing fuel tank
|
|
|
|
02-02-2015
|
2.00
|
Testing fuel tank for leaks and found one.
|
|
|
|
01-30-2015
|
8.00
|
Finish sealing the L tank
|
|
|
|
01-29-2015
|
6.00
|
Continue riveting and sealing the L fuel tank
|
|
|
|
01-28-2015
|
3.00
|
Continue riveting L wing tank
|
|
|
|
01-27-2015
|
8.00
|
Sealing L wing tank
|
|
|
|
01-22-2015
|
6.50
|
Installed access plate and built a work table
|
Details
|
|
|
01-12-2015
|
3.50
|
Dimpling the tank skin.
|
|
|
|
01-08-2015
|
6.00
|
Continue preparing parts for the L wing
|
|
|
|
01-07-2015
|
6.00
|
prep of Zee subassembly, j channels L wing tank
|
|
|
|
01-06-2015
|
3.50
|
Continue prepping parts ofr the L fuel tank
|
|
|
|
01-05-2015
|
3.00
|
prepare ribs for R wing fuel tank
|
|
|
|
01-02-2015
|
8.00
|
Prepraring the L forward wing skins
|
|
|
|
12-31-2014
|
2.00
|
Continue preping L Outboard forward ribs
|
|
|
|
12-29-2014
|
8.50
|
Finish riveting Top L wing skin
|
|
|
|
12-26-2014
|
5.00
|
Rivety most of top skin on L wing
|
|
|
|
12-24-2014
|
5.00
|
Started preparing outboard leading edge of L wing
|
|
|
|
12-19-2014
|
3.00
|
Finished dimpling and preping. Cleko'd skins on.
|
Details
|
|
|
12-18-2014
|
2.00
|
continue prep and dimple
|
|
|
|
12-17-2014
|
4.00
|
prep and dimple upper skins
|
|
|
|
12-16-2014
|
7.00
|
Prepare L wing top skin for installation
|
|
|
|
12-15-2014
|
5.00
|
L wing rear spar
|
|
|
|
12-15-2014
|
2.50
|
Install left wing rear spar
|
|
|
|
12-12-2014
|
6.00
|
Preping the left wing rear spar
|
|
|
|
12-11-2014
|
4.00
|
Bolted and rivited aft ribs to L main spar
|
|
|
|
12-10-2014
|
7.00
|
install grommets and start rib install
|
|
|
|
12-09-2014
|
5.50
|
Finish rib prep and install on mai
|
|
|
|
12-08-2014
|
4.50
|
Preping ribs
|
|
|
|
12-04-2014
|
4.50
|
Finished L main spar and started wing ribs.
|
Details
|
|
|
11-19-2014
|
1.00
|
Finished installing nutplates on L main spar
|
|
|
|
11-17-2014
|
1.50
|
Coutersinking and start riviting nut plates
|
|
|
|
11-05-2014
|
4.00
|
Countersinking rivet and screw holes in the left s
|
|
|
|
11-04-2014
|
3.50
|
Finish match drill J strips on left wing. Drill #4
|
|
|
|
10-31-2014
|
1.50
|
Start match drill J strips
|
|
|
|
10-30-2014
|
5.00
|
Inventory and store wing parts and start
|
|
|