KitLog pro

Powered By Kitlog Pro v2.0

Stevens Web Site
Work Logs Found: 55
Category Work Time: 241 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2015
0.50
Empennage Complete
Details
     

 04-12-2015
1.00
Drilling hole in the horn
Details
 

 04-11-2015
4.00
Interference check
Details
       

 04-07-2015
3.00
Roll left elevator leading edge
Details

 04-06-2015
6.00
Rolled leading edges and installed rod end bearing
Details
       

 04-06-2015
1.00
Rivet Trim tab and install on elevator
Details

 04-05-2015
3.00
Rivet the trim tab
Details
       

 04-04-2015
7.00
Prepared the trim tab
Details

 04-03-2015
2.00
Installed the electric elevator trim servo and riv
Details
       

 04-02-2015
1.00
Complete Trim tab trailing edge
Details

 04-01-2015
3.00
Rivet Left Elevator parts
Details
       

 03-30-2015
6.00
Prep the Left Elevator parts.
Details
     

 03-29-2015
6.00
Preparing the left elevator
Details
       

 03-28-2015
4.00
Right Elevator riveting
Details
       

 03-27-2015
7.00
Right Elevator parts prep
Details
       

 03-26-2015
3.00
Prepared to mount the elevator horn.
Details

 03-25-2015
3.00
Dimple and countersinking
Details

 03-24-2015
5.00
Drilled right elevator skin and counterweight hole
Details

 03-23-2015
3.00
Elevator work
Details
       

 03-22-2015
2.00
Back riveted elevator stiffeners to skins
Details

 03-21-2015
3.00
Drilled the stiffeners to the elevator skins
Details
       

 03-16-2015
7.00
Completed the Leading Edge of the Rudder
Details
       

 03-14-2015
2.00
Continued to make elevator stiffeners
Details

 03-13-2015
8.00
Let sealant cure then rivet rudder trailing edge
Details
     

 03-12-2015
3.00
Preparing Elevator skins - trimming the stiffeners
Details

 03-11-2015
6.00
Reassemble rudder trailing edge
Details

 03-08-2015
3.00
Drilled rudder training edge
Details

 03-07-2015
5.00
Rivet rudder skin to skeleton
Details
       

 03-05-2015
7.00
Rivet rudder components to spar
Details
       

 03-04-2015
6.00
Install rudder components to spar
Details

 03-02-2015
3.00
Final Prep of Rudder Skeleton components.
Details

 03-01-2015
2.00
Rudder attachment strips
Details

 02-27-2015
4.00
Match drilled rudder skeleton components.
Details
     

 02-26-2015
5.00
Building the rudder skeleton
Details

 02-24-2015
0.50
Completed Rudder stiffeners
Details
     

 02-21-2015
8.00
Prep/Attach rudder stiffeners
Details
       

 02-20-2015
2.50
Make rudder stiffeners and match drill
Details
       

 02-16-2015
5.00
Riveted the vertical stabilizer skin to skeleton
Details
       

 02-14-2015
1.70
Rivet VS ribs to front spar and cleco on the skin.
Details
       

 02-13-2015
3.00
Rivet the VS rear spar
Details
     

 02-12-2015
2.00
Final Prep of VS parts
Details

 02-12-2015
0.50
Clecoed the VS parts together.
Details

 02-10-2015
1.00
Match drill VS holes
Details

 02-09-2015
1.00
Final drilling VS ribs and spar
Details
     

 02-08-2015
0.50
Prepared the VS ribs
Details

 02-08-2015
0.10
Drilled hinge bracket holes
Details

 01-28-2015
0.20
Drilling Rear Spar
Details
     

 01-27-2015
20.00
Riveting the HS
Details
     

 12-31-2014
2.00
Riveting the HS rear spar
Details
     

 12-30-2014
16.00
Prepare Horizontal Stabilizer Parts for Assembly
Details
       

 12-03-2014
24.00
Drilling the Horizontal Stabilizer
Details
     

 11-14-2014
1.00
Prepared the Ribs
Details
     

 11-13-2014
8.00
Preparing the front spar assembly
Details

 11-06-2014
6.00
Prepared the rear spar assembly components.
Details

 10-23-2014
3.50
Inventory of Empennage kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.