Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
RV-12
Fuselage
Work Logs Found:
52
Category Work Time:
220 Hours
Date
Hours
Work Log Summary
Details
02-12-2016
2.00
Installed Map Box and Right Panel
Details
04-11-2015
4.00
Brake Lines installed to brakes
Details
04-10-2015
2.00
Set on it's feet
Details
04-09-2015
6.00
Brakes and Wheels
Details
04-04-2015
6.00
Landing Gear Legs
Details
03-30-2015
2.00
Assembled the Wing Attach Pins
Details
03-26-2015
6.00
Installed the Plexigass Rear Window
Details
03-24-2015
3.00
Added Firewall sealant
Details
03-19-2015
4.00
Upper Forward Fuselage Skin
Details
03-17-2015
3.00
Added Oil Tank Brace and Battery Mount
Details
03-13-2015
4.00
installed Panel Base and Canopy Ribs
Details
03-12-2015
4.00
Installed Fwd Firewall Stiffner Kit
Details
03-10-2015
4.00
Installed Forward Upper Fuselage
Details
03-07-2015
4.00
Installed Gas return lines
Details
02-18-2015
3.00
Gas floscan and Gascolator
Details
02-17-2015
4.00
Gas pump, shutoff valve and lines
Details
02-08-2015
4.00
Upper Forward Firewall
Details
02-07-2015
2.00
Fuel valve install
Details
02-04-2015
6.00
Ran brake lines
Details
01-31-2015
6.00
Assembled Rudder and Brake Pedals
Details
01-13-2015
8.00
Seat Back fabrication and attach
Details
01-09-2015
8.00
Side Panels riveted
Details
12-14-2014
8.00
Empennage Attach
Details
12-05-2014
3.00
Fuselage Back Panels and Roll Bar Bracket
Details
12-04-2014
9.00
Roll Bar
Details
11-23-2014
3.00
Added side vents
Details
11-22-2014
8.00
Riveted Fuselage Side Skins
Details
11-13-2014
3.00
Fuselage Side Skins
Details
11-11-2014
3.00
Arm Rests
Details
11-10-2014
3.00
Roll Bar attach plates and Mid-Fuse Brace
Details
11-09-2014
4.00
Fabricated longerons
Details
10-30-2014
3.00
Attached Lower fwd fuselage
Details
10-29-2014
3.00
F-1201L gascolator bracket and fuel flow meter mou
Details
10-28-2014
3.00
firewall shelf and rudder pedal support channels
Details
10-27-2014
2.00
Firewall Spacers and Cowl Attach Plates
Details
10-26-2014
4.00
Began work on fwd lower fuselage
Details
10-25-2014
2.00
Installed the six systems block studs
Details
10-24-2014
2.00
Attached Steps
Details
10-23-2014
3.00
Baggage Bulkhead, Auto-pilot & Facet Pump brack
Details
10-21-2014
3.00
Step Floors
Details
10-20-2014
3.00
Step Attachments
Details
10-19-2014
4.00
Riveted Bottom Skin
Details
10-15-2014
4.00
Clecoed Fuselage Bottom Skin
Details
10-13-2014
2.00
Corner Skins completed
Details
10-12-2014
5.00
Step Ribs and Corner Skins
Details
10-09-2014
2.00
Installed Control Column
Details
10-08-2014
4.00
F-1203A Bulkhead
Details
10-03-2014
3.00
Bulkhead Side Assemblies
Details
10-02-2014
3.00
Attached Seat Ribs and Floor
Details
09-25-2014
2.00
Added Seat Back Henges
Details
09-20-2014
8.00
Flaperon Mixer Arm & Seat Ribs
Details
09-19-2014
16.00
Start of mid-fuselage
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
172
949
Avionics
16
56
Empennage
18
143
Engine
17
67
Finish Kit
28
201
Fuselage
52
220
Miscellaneous
11
59
Prop
2
10
Wings
28
193
Copyright © 2001-2024 Matronics. All Rights Reserved.