KitLog pro

Powered By Kitlog Pro v2.0

Freds Bettercup
Work Logs Found: 73
Category Work Time: 325 Hours
 Date
Hours
Work Log Summary

Details

 07-01-2020
3.50
safety pins
Details
       

 11-12-2018
34.00
Misc wing rigging and adjustments
Details

 11-07-2018
7.50
right wingtip
Details
     

 11-01-2018
3.50
left wing tip
Details

 10-15-2018
5.00
right flap
Details

 10-13-2018
4.00
right aileron
Details

 10-12-2018
4.00
left wing tip
Details
     

 10-03-2018
6.00
left flap
Details
       

 10-01-2018
5.00
left aileron
Details

 08-10-2018
6.00
Wing root fairings
Details
       

 08-08-2018
6.00
flaps (continued)
Details
       

 08-06-2018
4.00
wing joiners
Details
     

 07-30-2018
3.50
wing bellcranks and rods
Details
       

 07-26-2018
1.50
Fit ailerons
Details
     

 06-08-2018
2.50
finish right flap
Details
     

 06-06-2018
2.00
right flap hinge
Details

 06-04-2018
2.00
right flap
Details

 06-01-2018
2.00
finish left flap
Details

 05-30-2018
2.00
left flap hinge
Details

 05-28-2018
2.00
left flap
Details

 05-25-2018
2.50
finish left aileron
Details

 05-23-2018
2.00
left aileron hinge
Details

 05-18-2018
3.00
left aileron
Details

 05-16-2018
2.50
finish rt. aileron
Details

 05-14-2018
2.00
R. aileron hinge
Details

 05-11-2018
3.50
right aileron
Details
     

 05-08-2018
3.00
Aileron control horns/counter weights
Details
     

 05-04-2018
2.50
walkway doubler
Details
     

 05-02-2018
3.00
Rivet tanks to wings
Details
       

 04-30-2018
4.50
Leak test fuel tanks
Details
     

 04-27-2018
7.00
final fit wings
Details
       

 04-25-2018
3.50
trial fit wings
Details
       

 04-18-2018
3.25
Rivet left wing
Details
       

 04-16-2018
4.50
Cleco remaining skins and started riveting
Details
     

 04-13-2018
3.00
Cleco bottome skins and plumb pitot.
Details
     

 04-11-2018
3.50
Dimpled ribs, walkway, and inboard skin
Details

 04-06-2018
3.00
Enlarged aileron slot and fabricated tie down
Details
       

 04-04-2018
4.75
Pitot
Details
       

 04-03-2018
7.25
Updrill left wing skin
Details

 04-02-2018
5.25
Finish fitting left fuel tank
Details
     

 03-30-2018
3.50
Fuel tank
Details

 03-29-2018
7.50
left wing skins, leading edge and walkway
Details
       

 03-13-2018
5.00
Cleco wing skins
Details
     

 03-09-2018
5.25
Drilled hinges and begin clecoing left wing skins
Details
       

 03-08-2018
3.00
Pitot, AOA tubes and wires
Details
     

 03-07-2018
5.50
Rivet ribs to spars
Details

 03-06-2018
3.50
Modifications to ribs 1 and 9
Details

 03-05-2018
6.25
Set up and cleco left wing ribs to spars
Details
     

 03-01-2018
4.00
Prime left wing ribs
Details
     

 02-01-2018
7.50
Riveted right wing
       

 01-29-2018
6.00
Reassembled right wing wth clecos
Details
       

 01-25-2018
3.50
Primed right wing skins
Details

 01-23-2018
3.50
deburr
Details

 01-22-2018
3.00
deburr
Details

 01-20-2018
5.00
Up drill bottom skins right wing
Details
     

 01-19-2018
3.50
Updrill right top wing
Details

 01-17-2018
3.50
fit tank
Details
     

 01-15-2018
5.00
Leading edge skin right wing
Details
       

 01-11-2018
8.50
Locating right wing skins
Details
       

 01-10-2018
3.75
Wing skins
Details
       

 01-08-2018
4.50
bolt and rivet right wing ribs
Details

 01-06-2018
1.50
begin right wing assembly
Details
       

 01-04-2018
3.00
Wing fixture
Details

 12-21-2017
1.50
Etch prime r ribs
Details

 12-18-2017
5.75
Test fit and modify right ribs
Details
     

 12-16-2017
5.00
Modiify left wing ribs 1,4 and 7
Details
       

 12-14-2017
5.00
Modify right wing ribs
Details

 04-12-2017
4.50
Test fit ribs
Details
     

 04-08-2017
4.50
Etch prime spars
Details

 04-07-2017
4.00
Squeezed rivets, left spar
Details

 04-06-2017
4.00
Squeeze rivets, right spar
Details
     

 03-29-2017
3.00
Countersink holes
Details

 03-27-2017
3.00
Inspect spars
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.