Pauls Web Site
RV-6A
Engine
Work Logs Found:
99
Category Work Time:
363 Hours
Date
Hours
Work Log Summary
Details
07-20-2019
10.00
Installed spinner
Details
06-09-2019
1.00
Installed oil filter
Details
06-09-2019
4.00
Applied cowling heat reflecting material
Details
04-18-2019
5.00
Bottom cylinder engine baffle
Details
03-03-2019
2.00
Installed brace on oil door
Details
03-02-2019
3.00
Oil cooler brace
Details
02-28-2019
2.00
Installing oil door
Details
12-09-2018
10.00
Finished EFII32 upgrade
Details
12-08-2018
10.00
Upgraded EFII32
Details
09-22-2018
10.00
EGT, CHT, and spark plug wires
Details
09-21-2018
3.00
Installed crankcase breather
Details
09-07-2018
1.00
Installed oil pressure sensor line
Details
09-07-2018
3.00
Braced GPS mount
Details
09-05-2018
1.00
Installed fuel sender hose
Details
08-03-2018
3.00
Installed manifold pressure lines
Details
06-10-2018
1.00
Torqued engine bolts
Details
02-11-2018
6.00
Top plenum cover
Details
02-11-2018
2.00
Installed heater hose
Details
01-27-2018
3.00
Installing cowling pin covers
Details
01-27-2018
8.00
Forming top plenum
Details
01-18-2018
2.00
Fabricating top plenum
Details
01-15-2018
6.00
Worked on the top plenum
Details
01-06-2018
3.00
More baffle work
Details
01-05-2018
10.00
More baffle work
Details
12-02-2017
8.00
Engine baffles
Details
11-23-2017
2.00
Installed #3 engine baffle
Details
11-22-2017
3.00
Engine baffle cylinder 3
Details
11-19-2017
8.00
Cylinder 4 engine baffle
Details
11-15-2017
2.00
Engine baffles
Details
11-13-2017
3.00
Finished alternate air door
Details
11-04-2017
6.00
Air filter
Details
11-03-2017
1.00
Installed heat muff
10-17-2017
1.00
Final fiberglass layer
Details
10-16-2017
1.00
Another layer of fiberglass
Details
10-15-2017
4.00
Laid fiberglass on FAB
Details
10-15-2017
5.00
Continued on FAB
Details
10-02-2017
2.00
EGTs installed
Details
10-02-2017
6.00
Air box
Details
10-02-2017
2.00
#1 exhaust heat shield
Details
09-24-2017
2.00
Stripped valve covers
Details
09-23-2017
18.00
Worked on cowling
Details
08-25-2017
3.00
Lengthened the top cowl
Details
08-21-2017
3.00
Still working on the cowl
Details
08-20-2017
4.00
Fitting cowl halves together
Details
08-19-2017
1.00
Resolving fuel line clearance
Details
08-19-2017
6.00
Installing horizontal cowl hinges
Details
08-19-2017
8.00
Cowling continued
Details
08-18-2017
6.00
Cowling installation
Details
08-08-2017
3.00
Installed cowl veritical hinges
Details
08-03-2017
2.50
Working on cowling
Details
08-01-2017
1.00
Starting on the bottom cowl
Details
07-31-2017
2.00
Working on top cowl
Details
07-31-2017
3.00
Installing hinges on upper cowl
Details
07-23-2017
2.00
Working on upper cowl
Details
07-07-2017
2.50
Working on upper cowl
Details
07-06-2017
2.00
Measured fuel and brake flex lines
Details
06-26-2017
3.00
Alt air cable installed
Details
06-25-2017
8.00
Filtered air box
Details
06-24-2017
2.00
Working on filtered air box
Details
05-18-2017
5.00
Revisited the propeller governor
Details
05-07-2017
3.00
Installed throttle cable
Details
05-02-2017
2.00
Installed propeller cable
Details
04-30-2017
3.00
Routed alternator wiring
Details
04-30-2017
3.00
More starter wiring
Details
04-30-2017
3.00
Finished installation of alternator
Details
04-29-2017
4.00
Installed BU alternator and starter wire
Details
04-27-2017
4.00
Installed starter soleniods
Details
04-22-2017
3.00
Installed two battery boxes
Details
04-21-2017
4.00
Installed EFII computers
Details
04-14-2017
6.00
Throttle bracket
Details
03-27-2017
2.00
Installed fuel line
Details
03-08-2017
1.00
Adjusted Governor
Details
02-18-2017
1.00
Measured cable lengths
Details
02-18-2017
6.00
Installed firewall penetrations and instrument pan
Details
02-16-2017
1.00
Fuel return line completed
Details
02-15-2017
2.00
Reinstalled throttle body
Details
02-04-2017
2.00
Finished throttle bracket
Details
02-02-2017
3.00
Throttle bracket
Details
01-29-2017
6.00
Throttle bracket
Details
01-27-2017
2.00
Fuel line leaving pressure regulator
Details
01-26-2017
1.00
Put engine back on firewall
Details
01-26-2017
2.00
Installed fuel pressure regulator
Details
10-22-2016
4.00
Completed exhaust
Details
10-17-2016
3.00
Installed throttle body
Details
10-16-2016
8.00
Installed crank position sensor
Details
10-15-2016
4.00
Installed starter and alternator
Details
10-15-2016
4.00
Installed intake and exhaust tubes
Details
10-03-2016
3.00
Removing engine mount from airframe
Details
10-02-2016
6.00
Installed engine
Details
09-10-2016
0.50
Changed out desiccant in spark plugs
08-20-2016
0.50
Replaced spark plug desiccant
Details
07-30-2016
0.50
Replaced spark plug desiccant
07-02-2016
1.00
Changed out desiccant
Details
06-04-2016
8.00
EFII engine components
Details
04-09-2016
2.00
Prepping for EFII
Details
08-02-2015
1.00
Dried out desiccant
Details
05-06-2015
1.00
Changed desiccant in dehydrator plugs
04-08-2015
0.50
Changed desiccant in dehydrator plugs
Details
09-07-2014
2.00
Engine ready to be worked on
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
579
2177
Avionics
91
534
Canopy
63
202
Empennage
28
104
Engine
99
363
Fuselage
94
384
Gear
62
174
Miscellaneous
22
40
None
2
Wings
118
376