Date
|
Hours
|
Work Log Summary

|
Details

|
05-28-2006
|
7.00
|
Assembled Jigs to bases
|
Details
|
  |
|
05-27-2006
|
5.00
|
Jigs Sanding and Bases
|
Details
|
  |
|
05-20-2006
|
2.00
|
Yet more jig work
|
Details
|
  |
|
04-02-2006
|
4.00
|
And more jig work
|
Details
|
  |
|
03-30-2006
|
1.00
|
More jig work
|
Details
|
  |
|
03-26-2006
|
6.00
|
Continued jig construction
|
|
  |
|
03-25-2006
|
3.00
|
Started building jigs 1 -5
|
Details
|
  |
|
03-23-2006
|
2.00
|
Built CS102/136 Assy
|
Details
|
  |
|
03-22-2006
|
2.00
|
Nose Wheel Window outer glass, install cover
|
|
  |
|
03-21-2006
|
0.75
|
Cleaned Glass Windows prepped for glassing
|
|
  |
|
03-15-2006
|
1.00
|
Installed Node Wheel Cover Windows
|
|
  |
|
03-09-2006
|
1.00
|
Trimmed and cleaned nose wheel cover
|
|
  |
|
03-07-2006
|
0.50
|
Removed Plug from cover
|
|
  |
|
03-06-2006
|
2.00
|
Completed Nose Plug and glassed
|
|
  |
|
03-05-2006
|
2.00
|
Start plug for nose wheel cover
|
Details
|
  |
|
03-04-2006
|
2.00
|
Reinstall NG3
|
Details
|
  |
|
03-04-2006
|
0.50
|
Glassed over anchors
|
Details
|
  |
|
03-02-2006
|
1.00
|
Complete Cutting Control Tubing
|
Details
|
  |
|
02-26-2006
|
2.00
|
Tape Canard Brace
|
Details
|
  |
|
02-25-2006
|
2.00
|
Install Canard Brace
|
Details
|
  |
|
02-24-2006
|
0.50
|
Start cutting tubing
|
Details
|
  |
|
02-24-2006
|
1.00
|
Layup Canard Brace/Trim Nose Doors
|
Details
|
  |
|
02-24-2006
|
2.00
|
Floxed Canard Bushings/Nutplates
|
Details
|
  |
|
02-23-2006
|
3.50
|
Nose Gear Door Stuff/Canard Brace
|
Details
|
  |
|
02-22-2006
|
3.00
|
Trim and Size Gear Doors
|
Details
|
  |
|
02-21-2006
|
3.00
|
Work on Nose Gear Doors
|
Details
|
  |
|
02-19-2006
|
4.00
|
Glass the nose bottom
|
Details
|
  |
|
02-18-2006
|
2.50
|
Nose Bottom/Strut Prep
|
Details
|
  |
|
02-17-2006
|
3.50
|
Reinstall Strut Cover, strut prep
|
Details
|
  |
|
02-16-2006
|
3.00
|
Install Noselift / Cut remaining hole for nose whe
|
Details
|
  |
|
02-15-2006
|
3.00
|
Fit/Install Strut Cover
|
Details
|
  |
|
02-08-2006
|
1.00
|
Routed nose for support wood
|
Details
|
  |
|
02-03-2006
|
1.50
|
Cut Wooden Block, Sanded Nose Foam
|
Details
|
|
|
01-31-2006
|
2.50
|
Completed NG-3, NG5
|
Details
|
 |
|
01-30-2006
|
1.00
|
Installed Foot and NG-3
|
Details
|
|
|
01-29-2006
|
2.00
|
Trimed Strut, MKNG6A, Nose Cone
|
Details
|
|
|
01-28-2006
|
2.50
|
2cd Ply and Nose Buildup
|
Details
|
  |
|
01-27-2006
|
1.00
|
1st Ply on Nose Strut
|
Details
|
  |
|
01-26-2006
|
0.50
|
Prep Strut
|
Details
|
  |
|
01-24-2006
|
1.00
|
Trim Strut/Recover MKNG6A / NG15
|
Details
|
  |
|
01-22-2006
|
3.00
|
Contour Nose
|
Details
|
|
|
01-21-2006
|
2.25
|
Complete Side Sanding Templates...
|
Details
|
  |
|
01-20-2006
|
1.25
|
Continued prep for contouring
|
Details
|
  |
|
01-19-2006
|
3.00
|
Contour Nose, Bore Lift Tab Mounts
|
Details
|
  |
|
01-17-2006
|
1.00
|
Nose Templates
|
Details
|
|
|
01-16-2006
|
0.20
|
Continue CS109,CS118
|
Details
|
  |
|
01-15-2006
|
1.00
|
Fab K1000 Nutplates for Canard Lift Tabs
|
Details
|
  |
|
01-09-2006
|
0.50
|
Begin Fabrication of CS109, CS118 Pivot Mounts
|
Details
|
  |
|
09-26-2005
|
1.00
|
Install Pins for canard
|
Details
|
 |
|
09-24-2005
|
0.50
|
Continue Carving Nose
|
|
  |
|
09-23-2005
|
2.00
|
Start Carving Nose
|
Details
|
 |
|
09-20-2005
|
0.50
|
Install Horizontal Nose piece
|
Details
|
  |
|
09-19-2005
|
1.00
|
Glass F0
|
Details
|
  |
|
09-17-2005
|
3.00
|
Trim sides, install NG
|
Details
|
 |
|
09-17-2005
|
1.00
|
glass outboard elevator weights
|
Details
|
  |
|
09-16-2005
|
4.00
|
Install sides
|
Details
|
  |
|
09-15-2005
|
3.00
|
Contour inside of nose foam
|
Details
|
|
|
09-10-2005
|
1.00
|
glass fronts of attach tabs
|
Details
|
  |
|
09-10-2005
|
8.00
|
Carved Bottom, install nose bottom...
|
Details
|
|
|
09-09-2005
|
2.00
|
Reinstall canard attach tabs
|
Details
|
 |
|
09-07-2005
|
2.00
|
Cut off Attach Tabs
|
Details
|
  |
|
09-03-2005
|
1.00
|
Glass Back of Tabs
|
Details
|
  |
|
09-02-2005
|
1.00
|
Glass Front of Attach Tabs
|
Details
|
  |
|
09-01-2005
|
1.50
|
Aft Layup on tabs
|
Details
|
  |
|
08-31-2005
|
2.50
|
Install Attach tabs
|
Details
|
  |
|
08-28-2005
|
1.50
|
Trim sides for Canard Install
|
|
  |
|
08-21-2005
|
1.50
|
Flox Pads for Canard Tabs
|
Details
|
  |
|
08-17-2005
|
0.75
|
Trim Canard Mounting Area
|
Details
|
 |
|
08-08-2005
|
0.50
|
Install Front Assy
|
Details
|
 |
|
08-07-2005
|
0.50
|
Install Jig For Front Assy
|
Details
|
  |
|
08-06-2005
|
1.50
|
Trim Hole For Actuator
|
Details
|
  |
|
08-03-2005
|
2.00
|
Mount Tires / Flip over Fuse
|
Details
|
|
|
08-02-2005
|
1.50
|
Trial Fit Tires/Bid Wrap
|
Details
|
  |
|
07-29-2005
|
0.10
|
Found Out About Courtney!!!
|
Details
|
  |
|
07-27-2005
|
3.00
|
Trim Glass / trial fit axles
|
Details
|
  |
|
07-26-2005
|
2.00
|
Glass and make flox pads for axles
|
Details
|
|
|
07-25-2005
|
1.50
|
Align Fuselage for axles
|
Details
|
  |
|
07-21-2005
|
2.50
|
Install LB Actuator and Hardpoints
|
Details
|
|
|
07-20-2005
|
2.50
|
Glass Inside of LB, remake free side ...
|
Details
|
  |
|
07-19-2005
|
3.00
|
Final Sand Adjust LB
|
Details
|
  |
|
07-17-2005
|
4.00
|
Route Foam Drill Tap and Mount LB
|
Details
|
 |
|
07-16-2005
|
2.50
|
Install LB Hinge Plywood
|
Details
|
  |
|
07-14-2005
|
1.00
|
Make LB brackets
|
Details
|
  |
|
07-14-2005
|
2.00
|
Cut Paper Templates for wings
|
Details
|
  |
|
07-13-2005
|
0.50
|
Trim LB
|
Details
|
  |
|
07-13-2005
|
0.50
|
Sand elevator pin tubes
|
|
  |
|
07-12-2005
|
1.25
|
Install Tubes for Elevator Pins
|
Details
|
|
|
07-12-2005
|
0.75
|
fit and join landing brake
|
Details
|
  |
|
07-11-2005
|
2.50
|
Sand LG Attach tabs, trim LB,routeLB23
|
Details
|
  |
|
07-10-2005
|
1.75
|
Glass Tubes and Washers onto tabs
|
Details
|
  |
|
07-09-2005
|
1.50
|
Flox Tubes and Bushings
|
Details
|
 |
|
07-08-2005
|
3.10
|
Fit/Bore Hole #2 and fit tubes
|
Details
|
|
|
07-07-2005
|
1.50
|
Fit/ Bore Hole the first hole
|
Details
|
  |
|
07-06-2005
|
3.00
|
Install MG1 and 2s
|
Details
|
 |
|
07-05-2005
|
2.00
|
Start Fitting LG Hoop
|
Details
|
  |
|
07-04-2005
|
6.50
|
Layup #2 LG BH Reinforcment
|
Details
|
|
|
07-03-2005
|
5.00
|
Inside LG Attach/prep for 2cd ...
|
Details
|
  |
|
07-02-2005
|
3.00
|
3rd LG Reinforcing Layup
|
Details
|
 |
|
06-30-2005
|
1.00
|
Trim Attach Points
|
Details
|
|
|
06-29-2005
|
3.00
|
Outer LG Attach Points MG1/2
|
Details
|
|
|
06-28-2005
|
3.00
|
Jig Hoop For Attach Points
|
Details
|
 |
|
06-27-2005
|
2.00
|
Sand Hoop/Start Jigging
|
Details
|
 |
|
06-26-2005
|
2.00
|
Forward BH Reinforcement Layup
|
Details
|
 |
|
06-25-2005
|
5.00
|
Second Torsional Layup
|
Details
|
|
|
06-23-2005
|
1.00
|
Cleanup Tape on TE
|
Details
|
  |
|
06-22-2005
|
2.00
|
Install TE/ Sand Bulkheads
|
Details
|
  |
|
06-20-2005
|
2.00
|
Sand Hoop/Install Brake Conduits
|
Details
|
|
|
06-19-2005
|
4.50
|
First Torsional Layup
|
Details
|
 |
|
06-18-2005
|
2.00
|
Build Micro Fillets into LG bulkheads
|
Details
|
|
|
06-16-2005
|
2.00
|
Sand Hold/Cut Glass for Torsional Layup
|
Details
|
  |
|
06-15-2005
|
2.00
|
Sand Hoop/Gear Hold
|
Details
|
  |
|
06-14-2005
|
1.00
|
Trim LG Strut Hoop
|
Details
|
  |
|
06-12-2005
|
1.50
|
Countour and Glass Bottom Tip
|
Details
|
 |
|
06-12-2005
|
1.50
|
Continue sanding landing brake bay
|
|
  |
|
06-11-2005
|
0.75
|
Start routing out LB area
|
Details
|
  |
|
06-11-2005
|
1.75
|
Glass Upper Tip
|
Details
|
 |
|
06-10-2005
|
3.00
|
Sand Canard Tip Upper Contour
|
Details
|
 |
|
06-09-2005
|
1.00
|
Install Canard Tips
|
Details
|
 |
|
06-08-2005
|
1.00
|
Cut Ends for Canard
|
Details
|
  |
|
06-07-2005
|
0.50
|
Fill Hinges
|
Details
|
  |
|
06-06-2005
|
1.50
|
Install Hinges
|
Details
|
  |
|
06-05-2005
|
1.50
|
Route Hinge Mount Points
|
Details
|
 |
|
06-04-2005
|
2.00
|
Sand Trim TE/ Elevators
|
Details
|
  |
|
02-17-2005
|
0.50
|
Glue 2cd Elevator Core
|
Details
|
  |
|
02-16-2005
|
0.50
|
Glue First Elevator Core
|
Details
|
  |
|
02-15-2005
|
2.50
|
Alodine Torque tubes
|
Details
|
  |
|
02-13-2005
|
0.50
|
final Drill and Sand of NG-30's
|
Details
|
  |
|
02-11-2005
|
2.00
|
Route NG-30 Reinforcements, Glass
|
Details
|
  |
|
02-10-2005
|
2.00
|
Glass Outside of NG-30 4 Ply
|
Details
|
  |
|
02-09-2005
|
0.50
|
Prep NG30 and install plywood HP
|
Details
|
|
|
02-08-2005
|
0.50
|
Install Glass Hardpoints
|
Details
|
|
|
02-07-2005
|
1.00
|
Glass New Landing Brake
|
Details
|
  |
|
02-04-2005
|
1.00
|
15 Ply Glass Layups for Hard Points
|
Details
|
  |
|
02-02-2005
|
0.50
|
Cut MG1, 2
|
Details
|
  |
|
02-01-2005
|
1.50
|
Cut aluminum for CH13
|
Details
|
|
|
01-30-2005
|
2.00
|
Layup Inside NG-30s
|
Details
|
 |
|
01-28-2005
|
1.00
|
Glass NG31 and 32
|
Details
|
  |
|
01-27-2005
|
1.00
|
Cut plywood hardpoints for 13
|
Details
|
  |
|
01-26-2005
|
0.50
|
Cut foam for NG-31
|
|
  |
|
01-24-2005
|
1.00
|
Cut foam for NG-30
|
Details
|
  |
|
01-06-2005
|
1.00
|
Clean torque tubes
|
Details
|
  |
|
01-05-2005
|
1.00
|
Clean torques tubes
|
Details
|
  |
|
01-04-2005
|
1.00
|
Clean torque tubes
|
Details
|
  |
|
10-10-2004
|
8.00
|
Skin, spar cap, install antennas
|
Details
|
|
|
10-08-2004
|
1.00
|
Fill canard
|
Details
|
  |
|
10-07-2004
|
2.00
|
Install Coax
|
Details
|
  |
|
10-06-2004
|
3.00
|
Install Foam hard points
|
Details
|
  |
|
10-03-2004
|
8.00
|
Glass bottom spar cap and skin
|
Details
|
  |
|
09-30-2004
|
2.00
|
Sand Cores spar cap areas
|
Details
|
  |
|
09-29-2004
|
3.00
|
Rework core assy
|
Details
|
  |
|
09-28-2004
|
3.00
|
Assy Canard Cores
|
|
  |
|
09-27-2004
|
1.00
|
Install lift tabs
|
|
|
|
09-17-2004
|
1.00
|
Install lift tabs
|
|
 |
|
09-16-2004
|
2.00
|
Assy lift tab mounting plates
|
|
  |
|
09-15-2004
|
4.00
|
Assy aft cores
|
|
 |
|
09-14-2004
|
2.00
|
Complete jig
|
|
  |
|
09-13-2004
|
3.00
|
Build new jig
|
|
  |
|
09-11-2004
|
3.00
|
Cut new foam cores
|
Details
|
  |
|
09-01-2004
|
3.00
|
trim trailing edge
|
|
  |
|
08-31-2004
|
2.00
|
Assemble elevators, build L templates
|
|
 |
|
08-30-2004
|
3.00
|
Glass elevator ends, 2ply bid over
|
Details
|
 |
|
08-29-2004
|
1.00
|
Glass top of elevators
|
|
  |
|
08-29-2004
|
6.00
|
glass top of canard , solder antennas,
|
|
 |
|
08-28-2004
|
6.00
|
Glass Canard spar cap
|
|
  |
|
08-28-2004
|
1.00
|
bottom of elevator
|
Details
|
  |
|
08-27-2004
|
1.00
|
Rebuild elevator
|
Details
|
  |
|
08-26-2004
|
5.00
|
Install elevator hardpoints, antenna
|
Details
|
|
|
08-25-2004
|
4.00
|
Remove T.E. foam
|
Details
|
  |
|
08-25-2004
|
1.00
|
build left elevator
|
|
  |
|
08-24-2004
|
3.00
|
sand prep canard
|
|
  |
|
08-24-2004
|
1.00
|
Build right elevator
|
Details
|
  |
|
08-23-2004
|
4.00
|
Remove fish tail, jig canard
|
Details
|
  |
|
08-22-2004
|
5.00
|
Glass Bottom of Canard
|
Details
|
|
|
08-21-2004
|
4.00
|
Glass bottom spar cap
|
Details
|
|
|
08-20-2004
|
1.00
|
Sand and fill Canard
|
|
  |
|
08-19-2004
|
1.00
|
install NC/2 into torque tubes
|
Details
|
  |
|
08-19-2004
|
4.00
|
Glass Shoulder support
|
Details
|
  |
|
08-18-2004
|
4.00
|
Assemble Canard cores
|
Details
|
|
|
08-17-2004
|
2.00
|
Flox Lift Tabs
|
Details
|
|
|
08-17-2004
|
2.00
|
cut elevator cores
|
|
  |
|
08-16-2004
|
3.00
|
Make tempates/fit canard cores
|
|
  |
|
08-15-2004
|
7.00
|
Glass Canard Shear WEB
|
|
  |
|
08-12-2004
|
7.00
|
Tape head duct
|
Details
|
  |
|
08-11-2004
|
2.00
|
Install lift tabs into canard
|
|
  |
|
08-11-2004
|
2.00
|
anchors for front seat harness
|
Details
|
  |
|
08-10-2004
|
5.00
|
Fabricate Attach tabs
|
Details
|
 |
|
08-09-2004
|
4.00
|
Join aft canard cores
|
Details
|
 |
|
08-08-2004
|
3.00
|
Cut Canard Cores
|
Details
|
|
|
08-07-2004
|
2.00
|
Finish Hot Wire Tool
|
|
  |
|
08-06-2004
|
4.00
|
Build Hot Wire Tool
|
|
  |
|
08-05-2004
|
3.00
|
Finish A, B, C + D Templates
|
Details
|
  |
|
08-04-2004
|
1.50
|
Make Templates
|
|
  |
|
08-04-2004
|
1.50
|
heat duct harness attach 7 ply buildups
|
|
  |
|
08-03-2004
|
2.00
|
Glue Canard Templates to MDF
|
Details
|
  |
|
07-28-2004
|
6.00
|
Glass Fuselage Aft
|
Details
|
  |
|
07-28-2004
|
2.00
|
Glass end of spar
|
Details
|
  |
|
07-27-2004
|
5.00
|
Glass Front of Spar
|
Details
|
  |
|
07-26-2004
|
4.50
|
Install heat duct/shoulder support
|
Details
|
 |
|
07-25-2004
|
3.00
|
Rebuild NACA area
|
Details
|
  |
|
07-25-2004
|
6.00
|
Outside spar shear web
|
Details
|
  |
|
07-24-2004
|
4.00
|
Sand aft section, polyurethan foam
|
Details
|
  |
|
07-23-2004
|
5.00
|
Build up fwd bulkhead
|
Details
|
  |
|
07-22-2004
|
4.00
|
install 6 ply bid...
|
Details
|
  |
|
07-21-2004
|
3.00
|
Sand Spar
|
Details
|
  |
|
07-20-2004
|
7.00
|
Lower Spar cap
|
Details
|
  |
|
07-19-2004
|
12.00
|
Upper Spar Cap
|
Details
|
 |
|
07-18-2004
|
8.00
|
Shear Web for Spar
|
Details
|
|
|
07-17-2004
|
7.00
|
Finish contouring spar/install outer hardpoints
|
|
|
|
07-15-2004
|
3.00
|
Contour Spar
|
Details
|
  |
|
07-14-2004
|
3.00
|
Sand Spar/contour
|
Details
|
  |
|
07-13-2004
|
3.00
|
Installed FWD Lower Bulkhead
|
Details
|
  |
|
07-12-2004
|
3.00
|
Applied top to spar
|
|
|
|
07-11-2004
|
10.00
|
Glassed inside of spar
|
|
|
|
07-10-2004
|
1.50
|
Glassed front / fwd BH
|
Details
|
  |
|
07-10-2004
|
1.50
|
cut new inside hardpoints for spar
|
|
  |
|
07-09-2004
|
3.00
|
Removed FWD BH
|
Details
|
  |
|
07-09-2004
|
1.50
|
Recut foam for the fwd lg bulkhead
|
Details
|
  |
|
07-08-2004
|
1.50
|
Reinstall upper forward lg bulkhead
|
|
  |
|
07-08-2004
|
3.00
|
Microed top of spar
|
|
  |
|
07-07-2004
|
4.50
|
installed lwr fwd bh
|
Details
|
  |
|
07-06-2004
|
4.50
|
Installed Aft Bulkhead and C + D plywood
|
Details
|
  |
|
07-05-2004
|
6.00
|
Cut Spar foam
|
|
  |
|
07-04-2004
|
4.00
|
Finished jig
|
|
  |
|
07-03-2004
|
4.00
|
Coninue new spar jig
|
|
  |
|
07-02-2004
|
4.00
|
Started new jig
|
|
  |
|
07-01-2004
|
5.00
|
Spar is dead rebuild...ouch
|
Details
|
  |
|
06-30-2004
|
2.00
|
glass aft side of LG bulkheads
|
|
  |
|
06-30-2004
|
3.00
|
finished top spar cap trough
|
|
  |
|
06-29-2004
|
2.00
|
Glass front of LG Bulkheads
|
Details
|
  |
|
06-29-2004
|
3.00
|
bottom spar cap trough...
|
Details
|
  |
|
06-28-2004
|
2.50
|
Made some sanders
|
Details
|
  |
|
06-28-2004
|
0.50
|
cutout foam for landing
|
Details
|
  |
|
06-27-2004
|
3.00
|
bevel front of spar
|
Details
|
  |
|
06-24-2004
|
2.50
|
Epoxy hardpoints and cut glass
|
Details
|
  |
|
06-23-2004
|
3.50
|
Glass landing gear hardpoints
|
Details
|
  |
|
06-22-2004
|
3.00
|
glass front face of spar
|
Details
|
  |
|
06-21-2004
|
4.00
|
trim spar and inner wing mount hardpoint
|
Details
|
 |
|
06-19-2004
|
5.00
|
Fix spar end, end layups
|
Details
|
  |
|
06-18-2004
|
4.00
|
rebuild spar end, cut out LG bulkhead
|
Details
|
  |
|
06-15-2004
|
1.50
|
right side inner spar attach points
|
Details
|
  |
|
06-12-2004
|
5.00
|
inside harness attach point
|
Details
|
|
|
06-11-2004
|
3.00
|
install canopy hinges and 6mm ply harnes
|
Details
|
  |
|
06-10-2004
|
2.00
|
Cut out new landing gear bulkheads
|
Details
|
  |
|
02-23-2004
|
1.00
|
Glass edges of head rests
|
|
  |
|
02-21-2004
|
0.50
|
Sand faces of Headrests
|
Details
|
  |
|
02-18-2004
|
1.00
|
Glass faces of headrests
|
Details
|
  |
|
02-14-2004
|
0.50
|
Sand edges of Headrests
|
Details
|
  |
|
02-11-2004
|
0.50
|
Assemble seatback brace
|
Details
|
  |
|
02-09-2004
|
1.00
|
Assemble headrests
|
Details
|
  |
|
02-07-2004
|
0.50
|
Trim Headrest parts
|
Details
|
  |
|
02-06-2004
|
0.75
|
Glass inside edges of headrests
|
Details
|
  |
|
01-21-2004
|
0.50
|
Layout Headrest parts
|
Details
|
  |
|
09-01-2003
|
1.00
|
Sand Joints
|
Details
|
  |
|
08-30-2003
|
2.00
|
Assemble Spar foam U Channel
|
Details
|
  |
|
08-29-2003
|
0.50
|
Sand impressions for spar foam
|
Details
|
  |
|
08-28-2003
|
2.00
|
Cut foam for Spar
|
|
  |
|
08-26-2003
|
3.00
|
Measure foam for Spar
|
Details
|
  |
|
08-25-2003
|
1.00
|
Cut Wing hardpoints for Spar
|
Details
|
  |
|
08-24-2003
|
3.00
|
Build jig for center section spar
|
Details
|
  |
|
08-23-2003
|
3.00
|
Layup Fuelage fix
|
Details
|
  |
|
08-22-2003
|
4.00
|
Aft Reinforcements/Finish Plug
|
Details
|
  |
|
08-21-2003
|
2.00
|
Sanding and Plug for Fuel valve
|
Details
|
 |
|
08-19-2003
|
3.00
|
Complete inside joint taping
|
|
|
|
08-18-2003
|
2.00
|
Tape inside joints
|
Details
|
 |
|
08-17-2003
|
2.00
|
Tape inside joints
|
Details
|
 |
|
08-16-2003
|
6.00
|
Glass fuselage side
|
Details
|
  |
|
08-15-2003
|
2.00
|
Prep opposite side for glassing
|
Details
|
  |
|
08-12-2003
|
1.00
|
Continue sanding
|
Details
|
  |
|
08-11-2003
|
1.00
|
Sand joints on sides
|
Details
|
  |
|
08-10-2003
|
6.00
|
Glass the fuselage side
|
Details
|
|
|
08-09-2003
|
2.00
|
Prep Side
|
Details
|
  |
|
08-07-2003
|
4.00
|
Contour Sides
|
Details
|
|
|
08-05-2003
|
4.00
|
Construct A Frames
|
Details
|
  |
|
07-27-2003
|
6.00
|
Glass Bottom of Fuselage
|
Details
|
|
|
07-23-2003
|
0.50
|
General Sanding of Fuselage Bottom
|
|
|
|
07-22-2003
|
1.00
|
Fill/Sand Fuselage Bottom
|
|
  |
|
07-21-2003
|
1.00
|
reinstall fwd upper lg bulkhead
|
|
  |
|
07-21-2003
|
1.00
|
Filling MKR BCN/SCOOP
|
Details
|
  |
|
07-20-2003
|
6.00
|
NACA Scoop/MKR BCN
|
Details
|
|
|
07-18-2003
|
2.00
|
Sand NACA Scoop
|
Details
|
  |
|
07-17-2003
|
1.00
|
Redo NACA Foam
|
Details
|
  |
|
07-16-2003
|
1.00
|
Remove NACA Scoop
|
Details
|
  |
|
07-15-2003
|
1.00
|
Sand Foam Added for the NACA droop
|
Details
|
  |
|
07-14-2003
|
1.00
|
General Sanding Prep
|
|
  |
|
07-13-2003
|
4.00
|
Sanding/Prep of Bottom, Grooves
|
Details
|
  |
|
07-11-2003
|
1.00
|
Forming Lower Gear Corners
|
|
 |
|
07-10-2003
|
2.00
|
Build up of Gear cover
|
Details
|
  |
|
07-09-2003
|
1.50
|
Permenant installation of flat gear cove
|
Details
|
|
|
07-08-2003
|
2.00
|
Install center of 8"
|
Details
|
  |
|
07-07-2003
|
1.00
|
Contour corners between Firewall and aft
|
Details
|
 |
|
07-02-2003
|
3.00
|
Install foam for the aft corners
|
Details
|
|
|
07-01-2003
|
2.00
|
Plywood installed for aft corners
|
Details
|
  |
|
06-30-2003
|
1.00
|
Finish work on aft bulkhead
|
Details
|
  |
|
06-29-2003
|
7.00
|
Contour right side
|
Details
|
 |
|
06-28-2003
|
7.00
|
Finsih left side contour
|
Details
|
|
|
06-27-2003
|
5.00
|
Start contouring left side
|
Details
|
|
|
06-24-2003
|
1.00
|
Start Contouring NACA scoop
|
Details
|
|
|
06-23-2003
|
2.00
|
Install foam for the naca scoop
|
Details
|
 |
|
06-22-2003
|
6.00
|
Glass inside of bottom and install
|
Details
|
|
|
06-21-2003
|
6.00
|
Sanded buildup tape joints
|
Details
|
  |
|
06-20-2003
|
3.00
|
Micro foam/install fwd firewall glass
|
Details
|
  |
|
06-19-2003
|
4.00
|
Installed new foam
|
Details
|
  |
|
06-18-2003
|
1.50
|
Glass prep
|
Details
|
  |
|
06-15-2003
|
3.00
|
Sanding install upper fwd fuselage
|
Details
|
  |
|
06-14-2003
|
4.00
|
Finish build up of last a foam
|
Details
|
|
|
06-13-2003
|
10.00
|
Bottom Prep
|
Details
|
|
|
06-11-2003
|
2.00
|
Install Fwd Gear Bulkhead
|
Details
|
 |
|
06-10-2003
|
3.00
|
Install Lwr Firewall/Heat Duct
|
Details
|
|
|
06-09-2003
|
4.00
|
Fixup Electrical channel
|
Details
|
  |
|
06-07-2003
|
2.00
|
Cleanup Taped Joints/F28
|
Details
|
  |
|
06-05-2003
|
5.00
|
Tape Joints
|
Details
|
  |
|
04-26-2003
|
2.00
|
Heat Duct outer layup
|
Details
|
  |
|
03-14-2003
|
1.00
|
Trim/Assemble Aft Heat Duct
|
Details
|
 |
|
03-13-2003
|
0.50
|
Layup Baffle side two
|
Details
|
  |
|
03-12-2003
|
1.00
|
Inside Head duct layup
|
Details
|
  |
|
03-09-2003
|
0.50
|
Trimming Heat Duct
|
Details
|
 |
|
03-09-2003
|
0.50
|
sand rear harness attach tubes
|
Details
|
  |
|
03-06-2003
|
0.50
|
Rear Heat duct pieces
|
Details
|
 |
|
03-01-2003
|
2.00
|
Trim Exterior layups of keel/seatback
|
Details
|
  |
|
02-27-2003
|
3.00
|
Glassed keel
|
Details
|
  |
|
02-26-2003
|
1.00
|
Glass outside of brace
|
Details
|
 |
|
02-25-2003
|
2.00
|
Trim Valve support/install
|
Details
|
 |
|
02-24-2003
|
0.50
|
Layup for Valve Support
|
Details
|
  |
|
02-23-2003
|
0.50
|
Assemble Seat support
|
Details
|
 |
|
02-22-2003
|
0.50
|
Prep Seatback spacers
|
Details
|
  |
|
02-21-2003
|
0.50
|
Installed wooden triangles
|
Details
|
 |
|
02-10-2003
|
0.75
|
Glass Map Pocket Sides
|
Details
|
 |
|
02-09-2003
|
1.00
|
Prep/assemble keel
|
Details
|
|
|
02-08-2003
|
1.00
|
Trimmed Landing Gear Bulkheads
|
Details
|
  |
|
02-08-2003
|
0.50
|
Trimed spacers and keel
|
Details
|
  |
|
02-07-2003
|
1.00
|
Glass inside of Center keel
|
Details
|
 |
|
02-06-2003
|
1.25
|
Opposite layup of R LG BH
|
Details
|
  |
|
02-05-2003
|
1.00
|
Glassed opposite Fwd Upper BH
|
|
  |
|
02-04-2003
|
0.60
|
Glassed opposite side of Fwd Lower BH
|
|
  |
|
02-03-2003
|
0.75
|
Glassed opposite side of spacers
|
|
 |
|
02-01-2003
|
0.50
|
Trim Map Pocket Spacers
|
Details
|
  |
|
02-01-2003
|
1.50
|
Trim Fwd Face of Bulkheads
|
Details
|
  |
|
01-31-2003
|
0.50
|
Glassed map pocket spacers
|
Details
|
 |
|
01-30-2003
|
0.50
|
Cut out parts for center keel
|
Details
|
 |
|
01-29-2003
|
0.75
|
Glass Fwd Face of Rear LG BH
|
Details
|
 |
|
01-28-2003
|
1.00
|
Glass Fwd Face of Upper Front LG BH
|
Details
|
 |
|
01-27-2003
|
0.75
|
Glass Fwd Face of Lower Front LG BH
|
Details
|
  |
|
01-26-2003
|
0.50
|
Glass for mouning Fuel Valve
|
Details
|
|
|
01-24-2003
|
0.50
|
Cut Glass for landing gear bulkheads
|
Details
|
  |
|
01-23-2003
|
1.00
|
Build up of landing gear bulheads
|
Details
|
  |
|
01-22-2003
|
0.50
|
Cut Replacement Hardpoint foam
|
Details
|
|
|
01-18-2003
|
0.50
|
Cut Fuel Selector Plywood Mounts
|
Details
|
  |
|
01-17-2003
|
0.50
|
Templates for Plywood Reinforcement
|
Details
|
  |
|
11-03-2002
|
0.75
|
Join F22
|
Details
|
  |
|
11-01-2002
|
1.00
|
Jig Fuselage
|
Details
|
  |
|
09-29-2002
|
1.50
|
Fuselage Fitting
|
Details
|
|
|
09-29-2002
|
2.00
|
Fuselage Fitting
|
Details
|
 |
|
09-27-2002
|
2.00
|
Fuselage Jig
|
Details
|
  |
|
09-22-2002
|
3.00
|
Final Trim of Spar Support and Aft
|
Details
|
  |
|
09-20-2002
|
3.00
|
Trimming and Sanding of sides
|
Details
|
|
|
09-18-2002
|
2.00
|
Spar Support Layup
|
Details
|
|
|
09-17-2002
|
1.50
|
Left Side Elec. Ch Buildup
|
Details
|
 |
|
09-16-2002
|
1.50
|
Right Side Elec. Ch Buildup
|
Details
|
 |
|
09-15-2002
|
3.00
|
LWX and LWY and Elec Channel
|
Details
|
|
|
09-14-2002
|
1.50
|
Lower Longeron Doublers/Elec Channel.
|
Details
|
 |
|
09-13-2002
|
4.00
|
Upper Longeron Layup
|
Details
|
 |
|
09-12-2002
|
2.00
|
Lower Longeron Installation cont
|
Details
|
 |
|
09-11-2002
|
2.00
|
Lower Longeron (Left Side)
|
Details
|
|
|
09-10-2002
|
2.00
|
Side preparation
|
Details
|
|
|
09-08-2002
|
5.00
|
Layup of Fuselage Sides
|
Details
|
|
|
09-07-2002
|
1.50
|
Sanded Fuel Site Gauge Depressions
|
Details
|
 |
|
09-06-2002
|
2.00
|
Sand Sides
|
Details
|
  |
|
09-05-2002
|
2.00
|
Micro joints layup prep
|
Details
|
|
|
09-04-2002
|
1.00
|
Completed installing build ups
|
Details
|
  |
|
09-03-2002
|
0.75
|
Fuselage build up continued 3/4"
|
Details
|
  |
|
09-02-2002
|
1.00
|
Continue attaching 3/4 side pieces
|
Details
|
 |
|
09-01-2002
|
4.00
|
Trimmed risers for fuselage sides
|
Details
|
|
|
08-31-2002
|
4.00
|
Dishing of Control Stick depressions
|
Details
|
|
|
08-30-2002
|
3.00
|
Foam Sides
|
Details
|
|
|
08-29-2002
|
3.00
|
Side Templates
|
Details
|
  |
|
08-28-2002
|
1.50
|
Side Templates
|
Details
|
|
|
08-26-2002
|
0.50
|
Trimmed Instr Pnl Stiffeners
|
Details
|
  |
|
08-26-2002
|
1.00
|
Cleanup and Side Templates
|
Details
|
  |
|
08-25-2002
|
2.00
|
Stiffener Layup two
|
Details
|
  |
|
08-24-2002
|
4.00
|
Instrument Pnl Trim/Hole Cuts/Stiffener
|
Details
|
 |
|
08-22-2002
|
1.50
|
Instrument Panel Fwd Layup
|
Details
|
  |
|
08-21-2002
|
0.75
|
Instrument Panel Trim
|
Details
|
  |
|
08-20-2002
|
1.50
|
Instrument Panel Aft Layup
|
Details
|
  |
|
08-19-2002
|
1.75
|
Sand Longerons
|
Details
|
  |
|
08-19-2002
|
0.75
|
Recut instrument panel foam
|
Details
|
  |
|
08-18-2002
|
1.50
|
Install longerons doublers
|
Details
|
|
|
08-17-2002
|
1.50
|
Laminate Longerons
|
Details
|
 |
|
08-16-2002
|
4.00
|
Fuselage Jigs/Cut Spruce for longeron
|
Details
|
 |
|
08-15-2002
|
1.50
|
Fuselage Side Jigs
|
Details
|
|
|
08-15-2002
|
0.50
|
Continue Trimming of F22
|
Details
|
  |
|
08-14-2002
|
0.10
|
Fix Table and Rework Glass cutting Table
|
Details
|
  |
|
08-13-2002
|
1.50
|
Try to salvage Instr. Panel
|
Details
|
  |
|
08-12-2002
|
2.00
|
F22/Firewall Trimming
|
Details
|
  |
|
08-11-2002
|
5.00
|
Aft firewall and Istr. Panel Layups
|
Details
|
 |
|
08-10-2002
|
5.00
|
Drill Firewall Screws, Fwd Layup of F22
|
Details
|
  |
|
08-09-2002
|
3.00
|
Instrument Panel Layup
|
Details
|
 |
|
08-08-2002
|
1.50
|
FWD firewall layups
|
Details
|
  |
|
08-07-2002
|
2.00
|
Glass cutting for remaining parts
|
Details
|
  |
|
08-06-2002
|
2.50
|
Firewall Cutouts and Hardpoints
|
Details
|
 |
|
08-05-2002
|
2.00
|
Temp Firewall and Eng Mount Holes
|
Details
|
  |
|
08-04-2002
|
2.00
|
Cut out firewall parts
|
Details
|
|
|
08-03-2002
|
3.00
|
Trim aft face of F22
|
Details
|
  |
|
08-02-2002
|
4.00
|
F22 aft layup, Instrument Panel Prep
|
Details
|
|
|
08-01-2002
|
4.00
|
Seatback trimming and F22 prep
|
Details
|
|
|
07-31-2002
|
7.00
|
Cut and layup seatback aft
|
Details
|
  |
|
07-21-2002
|
3.50
|
Layup Fwd Face of seatback
|
Details
|
 |
|
07-17-2002
|
0.75
|
Complete F28
|
Details
|
 |
|
07-16-2002
|
1.50
|
Trim and Layup Fwd face F28
|
Details
|
  |
|
07-15-2002
|
1.50
|
Aft F28 Layup
|
Details
|
|
|
07-13-2002
|
3.00
|
Assemble F22, continue Instr. Panel Cuts
|
Details
|
|
|
07-12-2002
|
1.00
|
Cutting Instrument Panel
|
Details
|
 |
|
07-10-2002
|
0.50
|
Cut F28
|
Details
|
  |
|
07-07-2002
|
5.00
|
Cut foam for F22, Doubler, Seatback...
|
Details
|
|