Date
|
Hours
|
Work Log Summary
|
Details
|
01-27-2007
|
10.00
|
Riveting top skins
|
Details
|
|
|
01-20-2007
|
8.00
|
Installed rollbar
|
|
|
|
01-07-2007
|
5.00
|
Prepped top skin for installation
|
Details
|
|
|
01-06-2007
|
6.00
|
Finished fabricating parking brake valve bracket.
|
Details
|
|
|
12-30-2006
|
6.00
|
permanently installed floors
|
|
|
|
12-29-2006
|
4.00
|
Prepped and installed side covers
|
|
|
|
12-28-2006
|
6.00
|
Installed wire tie brackets
|
|
|
|
12-23-2006
|
6.00
|
Installed conduit under floors and in rear fuselag
|
|
|
|
11-27-2006
|
2.00
|
Installed nut plates, riveted in crotch strap moun
|
|
|
|
11-25-2006
|
4.00
|
Deburred, primed, drilled crotch strap mounts
|
|
|
|
11-20-2006
|
1.00
|
Engine arrives from Canada
|
Details
|
|
|
11-11-2006
|
6.00
|
Installed ELT and Strobe Power pack
|
|
|
|
10-21-2006
|
5.00
|
Fabricated and Installed aileron trim
|
|
|
|
10-14-2006
|
4.00
|
Installed rudder cables and fairings
|
|
|
|
10-07-2006
|
6.00
|
Static ports and lines installed
|
|
|
|
09-30-2006
|
4.00
|
ELT and Strobe power supply brackets
|
|
|
|
09-19-2006
|
6.00
|
Fabricated elevator pushrod, stick to bellcrank PR
|
|
|
|
09-16-2006
|
8.00
|
Cut holes for landing gear, fit landing gear weldm
|
|
|
|
09-13-2006
|
6.00
|
Installed roll servo bracket and servo
|
|
|
|
09-10-2006
|
6.00
|
Primed and installed autopilot pitch servo bracket
|
Details
|
|
|
09-09-2006
|
6.00
|
finished battery box, statrted autopilot installat
|
Details
|
|
|
09-03-2006
|
4.00
|
Lots of firewall stuff
|
Details
|
|
|
09-02-2006
|
6.00
|
Worked on firewall items
|
|
|
|
08-13-2006
|
4.00
|
Drilled middle rib to firewall,
|
|
|
|
08-12-2006
|
6.00
|
Fabricated brackets, forward ribs for instrument p
|
|
|
|
08-06-2006
|
4.00
|
Installed rivets in side rails
|
|
|
|
08-04-2006
|
8.00
|
Finished top skin stiffeners, support structure
|
Details
|
|
|
08-03-2006
|
6.00
|
Plate nut installation, stiffener
|
Details
|
|
|
08-02-2006
|
6.00
|
Riveted F-712 and F-712E
|
|
|
|
08-01-2006
|
4.00
|
Added seat back adjusters
|
|
|
|
07-31-2006
|
4.00
|
Fabricated, deburred, primed more interior parts
|
|
|
|
07-22-2006
|
3.00
|
More interior parts
|
|
|
|
07-21-2006
|
4.00
|
Electric flaps, covers and final assemblies
|
|
|
|
07-20-2006
|
6.00
|
Final positioning of flap actuators and bearing bl
|
|
|
|
07-18-2006
|
2.00
|
More interior stuff
|
|
|
|
07-17-2006
|
7.00
|
Tunnel cover, fuel valve mount, Electric flaps
|
Details
|
|
|
07-16-2006
|
3.00
|
Tunnel cover, Tail tie down bracket
|
|
|
|
07-16-2006
|
5.00
|
Riveted seat backs, fabricated tunnel cover,
|
|
|
|
07-15-2006
|
4.00
|
Seat Backs
|
|
|
|
07-15-2006
|
2.00
|
Elevator bellcrank
|
|
|
|
07-14-2006
|
6.00
|
Fabricated seat backs, ready to deburr and prime
|
|
|
|
07-13-2006
|
6.00
|
Seat back adjusters
|
|
|
|
07-12-2006
|
6.00
|
Fit upper top skin, constructed elevator bellcrank
|
|
|
|
07-11-2006
|
5.00
|
installed rudder pedals in fuselage
|
|
|
|
07-09-2006
|
5.00
|
Rudder pedals and toe brakes
|
|
|
|
07-08-2006
|
6.00
|
Completed step installation, started rudder pedals
|
|
|
|
07-07-2006
|
7.00
|
Step installation
|
Details
|
|
|
07-05-2006
|
6.00
|
Finished brake line mount, assembled control colum
|
|
|
|
07-03-2006
|
6.00
|
Drilled wings and installed Van's wiring conduit
|
Details
|
|
|
07-01-2006
|
5.00
|
Located hardware, installed aierons, adjusted push
|
|
|
|
06-30-2006
|
7.00
|
Riveted pushrods, attached hinges to ailerons
|
|
|
|
06-29-2006
|
6.00
|
Riveted flap, aileron gap seals, started pushrods
|
|
|
|
06-28-2006
|
8.00
|
Aileron and flap gap seals
|
|
|
|
06-27-2006
|
6.00
|
Riveted aileron hinge brackets
|
|
|
|
06-26-2006
|
6.00
|
Deburred, match drilled, primed brackets
|
|
|
|
06-25-2006
|
4.00
|
Stored empennage, located wing parts
|
|
|
|
06-24-2006
|
6.00
|
Built storage for empenage parts
|
|
|
|
06-23-2006
|
4.00
|
Riveted hinge to left elevator, installed trim ser
|
|
|
|
06-22-2006
|
5.00
|
Installed rod ends, temporarily installed elevator
|
|
|
|
06-17-2006
|
4.00
|
Pro sealed foam ribs and riveted hinge
|
|
|
|
04-30-2006
|
4.00
|
Trim tab
|
|
|
|
04-29-2006
|
4.00
|
Started trim tab
|
Details
|
|
|
04-17-2006
|
5.00
|
Pro Sealed AEX Wedge to elevators and rudder TE
|
Details
|
|
|
04-17-2006
|
1.00
|
I did all of the trailing edges at once
|
Details
|
|
|
04-16-2006
|
2.00
|
Finished countersinking AEX wedge
|
|
|
|
04-13-2006
|
3.00
|
Riveted bottom skin to spar, completed skin rivets
|
|
|
|
04-13-2006
|
3.00
|
Drilled trailing edge skins and wedge.
|
|
|
|
04-12-2006
|
3.00
|
Riveted spar to top skin, riveted on counterbalanc
|
|
|
|
04-12-2006
|
5.00
|
Back riveted stiffeners, assembled counterbalance
|
|
|
|
04-11-2006
|
5.00
|
Primed left elevator skin, assembled spar, and hor
|
|
|
|
04-10-2006
|
5.00
|
Primed Left Elevator Parts
|
|
|
|
03-19-2006
|
6.00
|
Riveted counterbalance, bottom spar, end ribs
|
|
|
|
03-18-2006
|
6.00
|
Riveted skin stiffeners, elevator skin to spar
|
|
|
|
03-12-2006
|
3.00
|
Counterbalance arm assembly
|
|
|
|
03-11-2006
|
6.00
|
Assembled right elevator skeleton
|
|
|
|
03-05-2006
|
4.00
|
Dimpled, deburred, both elevators ready for primin
|
|
|
|
03-04-2006
|
6.00
|
Match drilled skins to spars, dimpled, deburred
|
|
|
|
02-26-2006
|
3.00
|
Finished match drilling stiffeners
|
|
|
|
02-26-2006
|
2.00
|
Dimpled skins, doubler, assembled counterbalances
|
|
|
|
02-25-2006
|
4.00
|
Deburred elevator stiffeners, match drilled to ski
|
|
|
|
02-20-2006
|
1.00
|
Started elevators
|
|
|
|
02-20-2006
|
5.00
|
Rudder, riveted skins, machine countersunk wedge
|
|
|
|
02-18-2006
|
5.00
|
Rudder, Dimpled, deburred, finished edges of skins
|
|
|
|
02-18-2006
|
1.00
|
Riveted Counter balance rib, skin, rudder brace
|
|
|
|
02-12-2006
|
2.00
|
Started final assembly of the rudder.
|
|
|
|
02-11-2006
|
6.00
|
Disassemled, Dimpled, Deburred, Primed
|
Details
|
|
|
02-05-2006
|
5.00
|
Assembled rudder skeleton, matched drilled skins.
|
|
|
|
02-04-2006
|
3.00
|
Deburred skins and dimpled
|
|
|
|
01-29-2006
|
4.00
|
Finished rudder stiffeners, matched drilled
|
Details
|
|
|
01-28-2006
|
4.00
|
Started the rudder this afternoon
|
|
|
|
01-28-2006
|
2.50
|
Finished Vertical Stabilizer
|
|
|
|
01-23-2006
|
2.00
|
riveted front spar and middle rib to skin.
|
|
|
|
01-22-2006
|
3.00
|
Assembled front spar and ribs, clecoed on skin.
|
|
|
|
01-21-2006
|
5.00
|
Deburred, finished edges, dimpled and primed. Read
|
|
|
|
01-16-2006
|
4.00
|
Started vertical stabilizer this afternoon
|
Details
|
|
|
01-16-2006
|
2.00
|
finished horizontal stabilizer this morning
|
|
|
|
01-15-2006
|
6.00
|
finished riveting the rear spar and hinge brackets
|
|
|
|
01-14-2006
|
6.00
|
Riveting second skin
|
|
|
|
01-02-2006
|
3.00
|
Ready to rivet skins
|
Details
|
|
|
12-31-2005
|
3.00
|
Riveting spars
|
|
|
|
12-30-2005
|
2.00
|
Dimpling skins
|
|
|
|
12-27-2005
|
6.00
|
Finished practice kit
|
Details
|
|
|
12-26-2005
|
6.00
|
All of the parts for the practice kit
|
Details
|
|
|
12-23-2005
|
4.00
|
Finished toolbox
|
|
|
|
12-22-2005
|
5.00
|
Van's toolbox kit, using my new rivet squeezer
|
Details
|
|
|
12-18-2005
|
4.00
|
Both sides ready to debur and dimple
|
|
|
|
12-17-2005
|
1.00
|
Horizontal stabilizers
|
|
|
|
12-17-2005
|
6.00
|
Horizontal stabilizer
|
Details
|
|
|
11-25-2005
|
1.00
|
paint booth
|
|
|
|
11-25-2005
|
1.00
|
Paint booth
|
|
|
|
11-12-2005
|
1.00
|
QB kit
|
|
|
|
11-11-2005
|
1.00
|
QB kit arrives
|
|
|
|
10-17-2005
|
1.00
|
Horizontal Stabilizer
|
|
|
|
10-17-2005
|
1.00
|
Dimpler construction
|
|
|
|
10-15-2005
|
1.00
|
Horizontal Stabilizer
|
Details
|
|
|
09-17-2005
|
1.00
|
Dimpler construction
|
Details
|
|
|
07-19-2005
|
1.00
|
Garage, before drywall
|
Details
|
|