Work Logs Found: 117
Category Work Time: 512 Hours
 Date
Hours
Work Log Summary

Details

 01-27-2007
10.00
Riveting top skins
Details
       

 01-20-2007
8.00
Installed rollbar
       

 01-07-2007
5.00
Prepped top skin for installation
Details
       

 01-06-2007
6.00
Finished fabricating parking brake valve bracket.
Details
     

 12-30-2006
6.00
permanently installed floors
       

 12-29-2006
4.00
Prepped and installed side covers
       

 12-28-2006
6.00
Installed wire tie brackets
       

 12-23-2006
6.00
Installed conduit under floors and in rear fuselag
       

 11-27-2006
2.00
Installed nut plates, riveted in crotch strap moun
       

 11-25-2006
4.00
Deburred, primed, drilled crotch strap mounts
     

 11-20-2006
1.00
Engine arrives from Canada
Details
       

 11-11-2006
6.00
Installed ELT and Strobe Power pack
       

 10-21-2006
5.00
Fabricated and Installed aileron trim
       

 10-14-2006
4.00
Installed rudder cables and fairings
     

 10-07-2006
6.00
Static ports and lines installed
       

 09-30-2006
4.00
ELT and Strobe power supply brackets
       

 09-19-2006
6.00
Fabricated elevator pushrod, stick to bellcrank PR

 09-16-2006
8.00
Cut holes for landing gear, fit landing gear weldm
       

 09-13-2006
6.00
Installed roll servo bracket and servo
       

 09-10-2006
6.00
Primed and installed autopilot pitch servo bracket
Details
       

 09-09-2006
6.00
finished battery box, statrted autopilot installat
Details
     

 09-03-2006
4.00
Lots of firewall stuff
Details
       

 09-02-2006
6.00
Worked on firewall items
       

 08-13-2006
4.00
Drilled middle rib to firewall,

 08-12-2006
6.00
Fabricated brackets, forward ribs for instrument p
       

 08-06-2006
4.00
Installed rivets in side rails
     

 08-04-2006
8.00
Finished top skin stiffeners, support structure
Details
       

 08-03-2006
6.00
Plate nut installation, stiffener
Details
       

 08-02-2006
6.00
Riveted F-712 and F-712E
       

 08-01-2006
4.00
Added seat back adjusters
       

 07-31-2006
4.00
Fabricated, deburred, primed more interior parts
     

 07-22-2006
3.00
More interior parts
       

 07-21-2006
4.00
Electric flaps, covers and final assemblies
       

 07-20-2006
6.00
Final positioning of flap actuators and bearing bl
       

 07-18-2006
2.00
More interior stuff

 07-17-2006
7.00
Tunnel cover, fuel valve mount, Electric flaps
Details
       

 07-16-2006
3.00
Tunnel cover, Tail tie down bracket
       

 07-16-2006
5.00
Riveted seat backs, fabricated tunnel cover,
       

 07-15-2006
4.00
Seat Backs
       

 07-15-2006
2.00
Elevator bellcrank
       

 07-14-2006
6.00
Fabricated seat backs, ready to deburr and prime
       

 07-13-2006
6.00
Seat back adjusters
     

 07-12-2006
6.00
Fit upper top skin, constructed elevator bellcrank
       

 07-11-2006
5.00
installed rudder pedals in fuselage
       

 07-09-2006
5.00
Rudder pedals and toe brakes
       

 07-08-2006
6.00
Completed step installation, started rudder pedals
       

 07-07-2006
7.00
Step installation
Details
       

 07-05-2006
6.00
Finished brake line mount, assembled control colum
       

 07-03-2006
6.00
Drilled wings and installed Van's wiring conduit
Details
       

 07-01-2006
5.00
Located hardware, installed aierons, adjusted push
       

 06-30-2006
7.00
Riveted pushrods, attached hinges to ailerons
       

 06-29-2006
6.00
Riveted flap, aileron gap seals, started pushrods
       

 06-28-2006
8.00
Aileron and flap gap seals
       

 06-27-2006
6.00
Riveted aileron hinge brackets
       

 06-26-2006
6.00
Deburred, match drilled, primed brackets
     

 06-25-2006
4.00
Stored empennage, located wing parts
     

 06-24-2006
6.00
Built storage for empenage parts

 06-23-2006
4.00
Riveted hinge to left elevator, installed trim ser
       

 06-22-2006
5.00
Installed rod ends, temporarily installed elevator
       

 06-17-2006
4.00
Pro sealed foam ribs and riveted hinge
       

 04-30-2006
4.00
Trim tab
       

 04-29-2006
4.00
Started trim tab
Details
       

 04-17-2006
5.00
Pro Sealed AEX Wedge to elevators and rudder TE
Details
       

 04-17-2006
1.00
I did all of the trailing edges at once
Details
       

 04-16-2006
2.00
Finished countersinking AEX wedge

 04-13-2006
3.00
Riveted bottom skin to spar, completed skin rivets
       

 04-13-2006
3.00
Drilled trailing edge skins and wedge.
       

 04-12-2006
3.00
Riveted spar to top skin, riveted on counterbalanc
       

 04-12-2006
5.00
Back riveted stiffeners, assembled counterbalance
       

 04-11-2006
5.00
Primed left elevator skin, assembled spar, and hor
       

 04-10-2006
5.00
Primed Left Elevator Parts
       

 03-19-2006
6.00
Riveted counterbalance, bottom spar, end ribs
       

 03-18-2006
6.00
Riveted skin stiffeners, elevator skin to spar
       

 03-12-2006
3.00
Counterbalance arm assembly
       

 03-11-2006
6.00
Assembled right elevator skeleton
       

 03-05-2006
4.00
Dimpled, deburred, both elevators ready for primin
       

 03-04-2006
6.00
Match drilled skins to spars, dimpled, deburred
       

 02-26-2006
3.00
Finished match drilling stiffeners
       

 02-26-2006
2.00
Dimpled skins, doubler, assembled counterbalances
       

 02-25-2006
4.00
Deburred elevator stiffeners, match drilled to ski
       

 02-20-2006
1.00
Started elevators
     

 02-20-2006
5.00
Rudder, riveted skins, machine countersunk wedge
       

 02-18-2006
5.00
Rudder, Dimpled, deburred, finished edges of skins
       

 02-18-2006
1.00
Riveted Counter balance rib, skin, rudder brace
       

 02-12-2006
2.00
Started final assembly of the rudder.
       

 02-11-2006
6.00
Disassemled, Dimpled, Deburred, Primed
Details
     

 02-05-2006
5.00
Assembled rudder skeleton, matched drilled skins.
       

 02-04-2006
3.00
Deburred skins and dimpled
       

 01-29-2006
4.00
Finished rudder stiffeners, matched drilled
Details
       

 01-28-2006
4.00
Started the rudder this afternoon
       

 01-28-2006
2.50
Finished Vertical Stabilizer
       

 01-23-2006
2.00
riveted front spar and middle rib to skin.

 01-22-2006
3.00
Assembled front spar and ribs, clecoed on skin.
       

 01-21-2006
5.00
Deburred, finished edges, dimpled and primed. Read
       

 01-16-2006
4.00
Started vertical stabilizer this afternoon
Details
       

 01-16-2006
2.00
finished horizontal stabilizer this morning
       

 01-15-2006
6.00
finished riveting the rear spar and hinge brackets
       

 01-14-2006
6.00
Riveting second skin

 01-02-2006
3.00
Ready to rivet skins
Details
       

 12-31-2005
3.00
Riveting spars
       

 12-30-2005
2.00
Dimpling skins
       

 12-27-2005
6.00
Finished practice kit
Details
       

 12-26-2005
6.00
All of the parts for the practice kit
Details
       

 12-23-2005
4.00
Finished toolbox
       

 12-22-2005
5.00
Van's toolbox kit, using my new rivet squeezer
Details
       

 12-18-2005
4.00
Both sides ready to debur and dimple
       

 12-17-2005
1.00
Horizontal stabilizers
       

 12-17-2005
6.00
Horizontal stabilizer
Details
       

 11-25-2005
1.00
paint booth
       

 11-25-2005
1.00
Paint booth
       

 11-12-2005
1.00
QB kit
       

 11-11-2005
1.00
QB kit arrives
       

 10-17-2005
1.00
Horizontal Stabilizer
       

 10-17-2005
1.00
Dimpler construction
       

 10-15-2005
1.00
Horizontal Stabilizer
Details
       

 09-17-2005
1.00
Dimpler construction
Details
       

 07-19-2005
1.00
Garage, before drywall
Details
       