Powered By Kitlog Pro v2.0
Bills Safari Adventure
Safari
All
Work Logs Found:
150
Category Work Time:
555 Hours
Date
Hours
Work Log Summary
Details
12-28-2015
0.00
Rotor Tach Sender
Details
12-22-2015
0.00
Part #s for Control Rod Bearings
Details
01-31-2015
0.00
Balancing Summary
Details
01-30-2015
0.00
Forward Flight Balancing
Details
01-29-2015
0.00
Hover Balancing
Details
01-28-2015
0.00
Tank Bracing
Details
01-27-2015
0.00
Lateral Accelerometer Mount
Details
01-26-2015
0.00
TRIM TABS
Details
01-25-2015
0.00
Additional Adjustments
Details
01-24-2015
0.00
Remove Slop in Linkage
Details
01-23-2015
0.00
Static Adjustments.
Details
01-22-2015
0.00
Balancing
Details
06-17-2012
0.00
Test Flights
Details
05-23-2012
0.00
FAA Inspection
Details
05-09-2012
4.00
First Run and Flight
Details
05-08-2012
10.00
Install Mail Rotor
Details
05-07-2012
10.00
Taking it to the Airport
Details
05-01-2012
4.00
Trailer Ramps
Details
04-21-2012
4.00
Install Movable Ballast and Rotor Brace
Details
04-11-2012
1.00
Finish up Control Rods
Details
04-07-2012
6.00
Rigging
Details
03-29-2012
2.00
Got er done
Details
03-28-2012
2.00
Trying to Mount the Bubble
Details
03-26-2012
2.00
Trying to mount bubble
Details
03-24-2012
4.00
Remove and Refinish Instrument Pod and Floor
Details
03-22-2012
2.00
Blade Clamps for Trailer
Details
03-11-2012
2.00
Oil Tank Breather
Details
03-10-2012
5.00
Work on Trailer
Details
02-12-2012
2.00
Replace Governor Switch
Details
02-04-2012
4.00
Try to get Avionics Working
Details
01-29-2012
2.00
Build Transmission Vent
Details
01-23-2012
8.00
Cabin Heat
Details
01-16-2012
1.00
Timed Engine
Details
01-15-2012
8.00
Trailer and Make the Lights light up
Details
01-13-2012
8.00
Final Install of Interior Sheet Metal
Details
01-12-2012
5.00
Finalize Wiring and Install Headboard
Details
01-08-2012
4.00
Heater Valve
Details
01-07-2012
8.00
Work on Hold Downs
Details
12-29-2011
8.00
Spray Lat Bubble, Build Trailer Brackets
Details
12-29-2011
8.00
Build Trailer Brackets
Details
12-28-2011
12.00
Install Exhaust
Details
12-21-2011
1.00
Christmas comes early
Details
12-10-2011
8.00
Governor Linkage, Counterbalance Springs
Details
11-05-2011
7.00
Install Gas Tanks and Build Braces
Details
11-01-2011
2.00
Bubble Finally Installed
Details
10-30-2011
3.00
Install Govenor and Bubble (con't)
Details
10-29-2011
5.00
Misc and Bubble Installation
Details
10-22-2011
8.00
Lots of small stuff that you cannot see
Details
10-19-2011
4.00
Finish up tail and work on instrument pod
Details
10-16-2011
4.00
Finish Horizontal Stab and Governor mount
Details
10-15-2011
4.00
Horizontal Stab and Governor Bracket
Details
10-12-2011
3.00
Finish Tail Boom Wiring Read Avionics Manual
Details
10-09-2011
4.00
Install Cable Controls
Details
10-08-2011
8.00
Hook up Tail Rotor Control Cable and Misc
Details
10-03-2011
3.00
Weld up Drive Shaft and Install
Details
10-01-2011
7.00
Tail Rotor Drive Shaft and Floor
Details
09-19-2011
8.00
Plumb Transmission and Install Tailboom
Details
09-17-2011
8.00
Plumbing and Misc
Details
09-13-2011
2.00
Fix Interior Panel
Details
09-05-2011
8.00
Wiring, Alt Air Box Misc.
Details
09-03-2011
8.00
Install Oil Cooler and Lines
Details
08-30-2011
2.00
Install Plugs on Fuel Indicator and Oil Line Fitti
Details
08-28-2011
4.00
Install Fuel LInes and Antelope Hunt
Details
08-22-2011
2.00
Assemble Gas Tanks
Details
08-21-2011
4.00
Install More Eyeballs
Details
08-20-2011
8.00
Install Eyeball firewall penetrations
Details
08-17-2011
1.50
Install Bulkhead Penetration
Details
08-07-2011
5.00
Tighten and Adjust Transmisison and Control Rods
Details
08-06-2011
3.00
Install Transmission
Details
08-01-2011
2.00
Install Main Transmission
Details
07-23-2011
5.00
Install Cooling Fan/Clutch Drum
Details
07-09-2011
4.50
Wiring
Details
07-05-2011
5.50
Wiring
Details
06-29-2011
3.00
More Wiring Cleanup
Details
06-28-2011
7.00
Rewiring
Details
06-23-2011
1.00
Engine Lift
Details
06-20-2011
3.00
Engine Lift Fixture
Details
06-18-2011
4.00
Sheet Metal and Engine Lift Fixture
Details
06-13-2011
2.00
Install Sheet Metal
Details
06-09-2011
5.00
Assemble Engine
Details
06-04-2011
5.00
Engine Dry Sump Conversion
Details
05-30-2011
1.50
Rod Ends
Details
05-29-2011
1.50
Assemble Fuel Selector Valve
Details
05-28-2011
1.50
Finish Intake Manifold and Valve Covers
Details
05-25-2011
1.00
Make Nipples for Valve Cover Drains
Details
05-21-2011
3.00
Adjust Intake and Add Oil Drains to Valve Covers
Details
05-18-2011
3.00
Intake Manifold
Details
05-16-2011
1.50
Sump Block off Plate
Details
05-15-2011
3.00
Dry Sump Conversion
Details
05-14-2011
4.00
Clean up wiring
Details
05-02-2011
3.00
Lacing the Wiring
Details
05-01-2011
5.00
Bed Liner and Miscellaneous
Details
04-24-2011
3.00
Remake and Coat interior parts
Details
04-23-2011
4.00
Install Doublers and Antennas
Details
04-18-2011
3.00
Finish Body Fab Antenna mounts
Details
04-17-2011
3.00
Finish Riveting.
Details
04-16-2011
5.00
Riveting the Exterior Sheet Metal
Details
03-27-2011
3.00
More Wiring and Riveting
Details
03-24-2011
2.00
More Wiring
Details
03-23-2011
2.00
Wire Collective and Cyclic
Details
03-12-2011
4.00
Finish Cyclics
Details
03-09-2011
1.50
Wiring Pilot Cyclic
Details
03-08-2011
2.00
Cyclic Wiring and Grip Install
Details
03-07-2011
3.00
Wire CoPilot Cyclic
Details
03-06-2011
3.00
Make it Nekked Again
Details
03-05-2011
5.00
Finish Up Interior Sheet Metal
Details
02-27-2011
4.00
Interior Sheet Metal
Details
02-26-2011
7.00
Interior Sheet Metal
Details
02-25-2011
5.00
Interior Sheet Metal
Details
02-24-2011
7.00
Make Collective Control
Details
02-20-2011
3.50
Wiring
Details
02-19-2011
8.00
Wiring
Details
02-08-2011
2.00
Wiring
Details
02-07-2011
2.00
Wiring and Backup Battery Box
Details
02-06-2011
5.00
Avionics
Details
02-05-2011
5.50
Construct and Attach Instrument Pod
Details
01-25-2011
2.00
Still Working on Pedestal
Details
01-24-2011
1.50
Still building Pedestal
Details
01-23-2011
5.00
Instrument Pod Pedestal
Details
01-22-2011
4.00
Instrument Pod Support
Details
01-21-2011
1.00
Weld up Hole
Details
01-16-2011
5.00
Finish Control Rods, Avionics
Details
01-15-2011
6.00
Control Rods
Details
01-14-2011
1.25
Sheet Metal and Control Rods
Details
01-10-2011
3.00
Battery Box
Details
01-09-2011
4.00
Seat Back and Seats
Details
01-08-2011
8.50
Finish Front of Seats
Details
01-07-2011
4.00
Cut and Fit Front of Seat
Details
01-05-2011
2.00
Finish Side Panels
Details
01-04-2011
3.00
Working on interior pieces
Details
01-02-2011
3.00
OH CRAP
Details
01-01-2011
2.00
Corrosion Inhibitor
Details
12-31-2010
3.00
Thinking
Details
12-30-2010
5.00
Still installing nut plates
Details
12-29-2010
6.00
Install Nut Plates
Details
12-28-2010
2.00
Install Nut Plates
Details
12-21-2010
4.00
Reinstall Painted Panels
Details
12-20-2010
3.00
Paint interior surfaces
Details
12-19-2010
4.00
Prime
Details
12-18-2010
3.00
Disassemble and prep for paint
Details
12-14-2010
0.00
Its Here con't
Details
12-14-2010
2.00
Its Here
Details
11-27-2010
4.00
Build Engine Stand and Engine lift
Details
11-26-2010
4.00
Assemble Gantry Crane
Details
11-24-2010
8.00
Build Sheet Metal Brake Stand
Details
11-15-2010
0.00
Rough Wiring on Avionics
Details
11-02-2010
0.00
Bubble Mounting
Details
10-09-2010
6.00
Spec Out Avionics
Details
10-08-2010
4.00
Build Main Rotor Blades
Details
10-08-2010
4.00
Assemble Main Transmission
Details
SITE NAVIGATION
Contact Builder
Safari Home
Category
# Logs
# Hours
All
150
556
Avionics
28
102
Empennage
12
69
Engine
23
81
Frame
50
196
Main Rotor
16
22
Main Transmission
5
16
Miscellaneous
8
27
None
1
3
Test Flight
1
Tools
3
16
Trailer
3
24
Copyright © 2001-2024 Matronics. All Rights Reserved.