Date
|
Hours
|
Work Log Summary
|
Details
|
06-28-2019
|
2.00
|
Riveting the Baffle Seals
|
Details
|
|
|
06-27-2019
|
3.00
|
Fitting the Baffle Seals
|
Details
|
|
|
06-25-2019
|
3.00
|
Inital Fitting of the Baffle Seals
|
Details
|
|
|
06-25-2019
|
2.00
|
Bundling Cables
|
Details
|
|
|
06-24-2019
|
1.00
|
Wiring PMags
|
Details
|
|
|
06-24-2019
|
1.00
|
EAA Stage Inspection
|
Details
|
|
|
06-24-2019
|
3.00
|
Complete Primary Wiring
|
Details
|
|
|
06-23-2019
|
1.00
|
Routing Spark Plug Wires
|
Details
|
|
|
06-23-2019
|
1.50
|
New Forward Skin
|
Details
|
|
|
06-23-2019
|
1.00
|
Final Trimming of Baffles
|
Details
|
|
|
06-23-2019
|
0.50
|
Blast Tubes
|
Details
|
|
|
06-23-2019
|
0.00
|
Big Picture
|
Details
|
|
|
06-22-2019
|
2.00
|
Finishing the Aux Battery Mounting Floor
|
Details
|
|
|
06-22-2019
|
1.00
|
Final Baffle Check
|
Details
|
|
|
06-22-2019
|
1.00
|
DAU Cable Harness Firewall Penetration
|
Details
|
|
|
06-20-2019
|
0.50
|
Planning EDM Wiring Penetration / Main Alt Fuse
|
|
|
|
06-20-2019
|
0.50
|
Oil Pressure Sensor Hookup
|
Details
|
|
|
06-20-2019
|
1.00
|
Oil Cooler / Baffle Brace
|
Details
|
|
|
06-20-2019
|
2.50
|
Finish Securing Starter Cable
|
Details
|
|
|
06-20-2019
|
0.10
|
Crossing Items Off the List
|
Details
|
|
|
06-19-2019
|
0.50
|
Starter Cable Installation
|
Details
|
|
|
06-19-2019
|
3.00
|
Routing Cabing Heat Control Cable
|
Details
|
|
|
06-17-2019
|
1.00
|
Securing Control Cables
|
Details
|
|
|
06-17-2019
|
4.00
|
Installing Cabin Heat Box
|
Details
|
|
|
06-12-2019
|
0.50
|
Installing Hoses
|
Details
|
|
|
06-12-2019
|
0.50
|
Cabin Heat Muff and Routing
|
Details
|
|
|
06-12-2019
|
1.00
|
Alternate Air
|
Details
|
|
|
06-11-2019
|
1.50
|
Completing Battery Box
|
Details
|
|
|
06-11-2019
|
3.00
|
Aux Air
|
Details
|
|
|
06-09-2019
|
2.50
|
Building Aux Battery Compartment
|
Details
|
|
|
06-08-2019
|
3.00
|
Opening up the hanger after a long winter
|
Details
|
|
|
06-08-2019
|
1.00
|
Build compartment for aux battery and EDM DAU
|
Details
|
|
|
09-25-2018
|
2.00
|
Prop Bracket
|
Details
|
|
|
09-25-2018
|
2.00
|
Engine Progress Inspection
|
Details
|
|
|
09-23-2018
|
1.00
|
Removed/Replaced Throttle Cable
|
Details
|
|
|
09-22-2018
|
2.00
|
Odds and ends
|
Details
|
|
|
09-15-2018
|
3.00
|
Engine Control Assembly
|
Details
|
|
|
09-14-2018
|
5.00
|
Progress on cables
|
Details
|
|
|
09-13-2018
|
2.00
|
Problem with Control Travel
|
Details
|
|
|
08-31-2018
|
3.50
|
Hooking Up Control Cables
|
Details
|
|
|
08-25-2018
|
2.00
|
Air Filter Cover
|
Details
|
|
|
08-18-2018
|
5.50
|
Complete Oil Cooler and Rear Baffle
|
Details
|
|
|
08-12-2018
|
2.00
|
Straightening Baffle Seal Routing
|
Details
|
|
|
08-11-2018
|
3.00
|
Mounting Oil Cooler to Baffles
|
Details
|
|
|
08-10-2018
|
0.50
|
Tedious Organizing
|
Details
|
|
|
08-09-2018
|
1.00
|
New Precision Sensors
|
Details
|
|
|
08-07-2018
|
0.50
|
Finding the Alternator Data Plate
|
Details
|
|
|
07-31-2018
|
5.00
|
New Battery Box
|
Details
|
|
|
07-30-2018
|
3.00
|
Losing Weight
|
Details
|
|
|
07-29-2018
|
2.00
|
Fuel Line Hookup
|
Details
|
|
|
11-22-2016
|
1.00
|
Straightening cowl seal path
|
Details
|
|
|
11-21-2016
|
2.00
|
Riveting Front Right Baffles
|
Details
|
|
|
11-17-2016
|
0.50
|
More Pictures
|
|
|
|
11-17-2016
|
5.00
|
Fitting to Cowl
|
Details
|
|
|
11-15-2016
|
8.00
|
Right Inboard Front Baffle
|
|
|
|
11-13-2016
|
5.00
|
Finishing up Left Baffles
|
Details
|
|
|
11-10-2016
|
6.00
|
Algining Snorkel
|
|
|
|
11-08-2016
|
2.50
|
Joining Left Side Baffles
|
Details
|
|
|
11-07-2016
|
0.50
|
Snorkel Drill Guide
|
Details
|
|
|
11-07-2016
|
3.00
|
Baffle Floor Assemblies
|
Details
|
|
|
11-06-2016
|
4.00
|
Assembling Baffles
|
Details
|
|
|
11-05-2016
|
4.00
|
New Engine Baffle Floors
|
Details
|
|
|
11-02-2016
|
5.00
|
Control Hookup
|
Details
|
|
|
10-30-2016
|
5.00
|
Baffles
|
Details
|
|
|
10-28-2016
|
2.50
|
Replacing Front Baffles
|
Details
|
|
|
10-27-2016
|
2.00
|
Installing Prop Governor Control Cable
|
Details
|
|
|
10-26-2016
|
2.00
|
Fabricating CNC Prop Bracket
|
Details
|
|
|
10-16-2016
|
4.00
|
Sealing the Center Baffle / Safety Clearance
|
Details
|
|
|
10-15-2016
|
3.00
|
Final Baffle Trim
|
Details
|
|
|
10-14-2016
|
5.00
|
Prop Bracket
|
Details
|
|
|
10-09-2016
|
2.50
|
Prop Control Bracket - Idea 8
|
Details
|
|
|
10-08-2016
|
1.00
|
Front Baffle Floor
|
|
|
|
08-14-2016
|
4.00
|
More Baffles
|
Details
|
|
|
08-13-2016
|
5.00
|
Front Baffles
|
Details
|
|
|
08-10-2016
|
2.50
|
Left Inlet Baffle
|
Details
|
|
|
08-09-2016
|
4.00
|
More Baffles
|
Details
|
|
|
07-31-2016
|
3.00
|
Prop Governor Bracket
|
Details
|
|
|
07-31-2016
|
2.00
|
New Prop Governor Bracket Evolves
|
Details
|
|
|
07-30-2016
|
0.25
|
Prop Control Bracket
|
Details
|
|
|
07-23-2016
|
0.50
|
Yet another prototype prop control bracket
|
Details
|
|
|
07-23-2016
|
2.00
|
Trimming Baffles
|
Details
|
|
|
07-23-2016
|
1.50
|
Mounting the Air Intake
|
Details
|
|
|
07-22-2016
|
2.00
|
Prop Control
|
Details
|
|
|
07-22-2016
|
3.00
|
Mounting the Front Baffles
|
Details
|
|
|
07-17-2016
|
3.00
|
Baffle Fitting
|
Details
|
|
|
07-16-2016
|
4.00
|
Rebuild Engine Baffle
|
Details
|
|
|
05-21-2016
|
2.00
|
New Flooring for Hanger
|
Details
|
|
|
12-01-2013
|
0.10
|
Learning 3D CAD, 3D Printing
|
Details
|
|
|
11-17-2013
|
4.00
|
Solution to Throttle
|
Details
|
|
|
11-16-2013
|
6.00
|
Backup Power Supply
|
Details
|
|
|
11-15-2013
|
1.00
|
Prop Governor and Oil Cooler
|
Details
|
|
|
11-14-2013
|
0.50
|
Assemble Throttle Quadrant
|
Details
|
|
|
01-29-2013
|
0.50
|
Scanning Documents
|
Details
|
|
|
01-29-2013
|
0.50
|
|
Details
|
|
|
01-27-2013
|
1.50
|
Oil Cooler
|
Details
|
|
|
01-27-2013
|
0.25
|
Installed JPI EGT Probes
|
Details
|
|
|
01-23-2013
|
0.50
|
Fuel Hoses and FF Transducer
|
Details
|
|
|
01-11-2013
|
1.00
|
Prop Governor Adapter
|
Details
|
|
|
01-11-2013
|
1.00
|
Prop Governor Adapter
|
Details
|
|
|
01-11-2013
|
1.00
|
Hoses and Sensors
|
Details
|
|
|
01-10-2013
|
1.00
|
Heater box
|
Details
|
|
|
01-09-2013
|
1.00
|
Mounting Transducer Block
|
Details
|
|
|
01-09-2013
|
0.75
|
Adjust bracket
|
Details
|
|
|
01-08-2013
|
0.50
|
Dry-Fit Throttle Bracket
|
Details
|
|
|
01-07-2013
|
2.00
|
Prop Governor Hookup
|
Details
|
|
|
01-06-2013
|
2.00
|
Backup Battery System Design
|
Details
|
|
|
01-05-2013
|
0.00
|
Clean the Shop
|
Details
|
|
|
01-02-2013
|
1.00
|
First RV8 Ride
|
Details
|
|
|
07-31-2012
|
1.00
|
Fuel / Oil System
|
Details
|
|
|
07-30-2012
|
1.00
|
|
Details
|
|
|
07-29-2012
|
2.00
|
MS Project For Completion
|
Details
|
|
|
01-09-2012
|
6.00
|
Dimmer Circuit Design and PCB
|
Details
|
|
|
01-08-2012
|
8.00
|
Fuel Sensor PCB
|
Details
|
|
|
12-22-2011
|
4.00
|
ADS-B Setup
|
Details
|
|
|
12-20-2011
|
0.50
|
Hooking up Magnetometers
|
Details
|
|
|
12-16-2011
|
5.50
|
Debugging ADSB, More Configuration
|
Details
|
|
|
12-15-2011
|
1.00
|
Making GPS Cables
|
Details
|
|
|
12-15-2011
|
2.00
|
Configuring Avionics
|
Details
|
|
|
12-14-2011
|
4.00
|
Powering Up and Configuration
|
Details
|
|
|
12-14-2011
|
1.00
|
Installing Radios
|
Details
|
|
|
12-13-2011
|
3.00
|
More EFIS Details
|
Details
|
|
|
12-12-2011
|
5.00
|
Initial Power Up of EFIS
|
Details
|
|
|
12-11-2011
|
4.00
|
Low Output Day
|
Details
|
|
|
12-10-2011
|
1.00
|
Swap Com1/Com2
|
Details
|
|
|
12-10-2011
|
0.50
|
Pitot / Static
|
Details
|
|
|
12-10-2011
|
1.00
|
FastStack
|
Details
|
|
|
12-10-2011
|
0.50
|
ADS-B Hookup
|
Details
|
|
|
12-09-2011
|
3.00
|
Repositioning AHRS
|
Details
|
|
|
12-08-2011
|
0.50
|
Installing P-Mags
|
Details
|
|
|
12-08-2011
|
0.50
|
Installing ADS-B Cable
|
Details
|
|
|
11-13-2011
|
2.00
|
Panel Completion
|
Details
|
|
|
11-11-2011
|
0.50
|
Wemac
|
Details
|
|
|
11-10-2011
|
4.00
|
Rebuild Avionics Mounting Panel
|
Details
|
|
|
11-06-2011
|
3.60
|
Finished Wiring Avionics Basy --- Well Almost
|
Details
|
|
|
11-05-2011
|
8.00
|
Avionics Wiriing - Continued
|
Details
|
|
|
11-04-2011
|
2.00
|
Schematic Update
|
Details
|
|
|
11-04-2011
|
3.00
|
Installing Avionics
|
Details
|
|
|
11-04-2011
|
3.00
|
Avionics Wiring - Power
|
Details
|
|
|
11-03-2011
|
2.00
|
Panel Rived Up
|
Details
|
|
|
11-03-2011
|
3.00
|
|
Details
|
|
|
11-02-2011
|
1.50
|
Tech Inspection by EAA
|
Details
|
|
|
11-02-2011
|
4.00
|
Adding Lightening Holes, Assembly
|
Details
|
|
|
10-30-2011
|
2.00
|
Building Avionics Shelf
|
Details
|
|
|
10-29-2011
|
0.50
|
Wiring EDM P3
|
Details
|
|
|
10-29-2011
|
3.00
|
Avionics Bay - Cont
|
Details
|
|
|
10-29-2011
|
2.00
|
Avionics Bay
|
Details
|
|
|
10-28-2011
|
5.00
|
Starting Avionics Bay
|
Details
|
|
|
10-27-2011
|
1.00
|
EDM Hookup
|
Details
|
|
|
10-23-2011
|
2.00
|
Engine Monitor Harness
|
Details
|
|
|
10-22-2011
|
2.50
|
Rewired VP-X J1, J2, Tested System
|
Details
|
|
|
10-19-2011
|
1.00
|
Programming Vertical Power System
|
Details
|
|
|
10-15-2011
|
0.75
|
Power Jack
|
Details
|
|
|
10-15-2011
|
1.00
|
Master Switch Panel
|
Details
|
|
|
10-14-2011
|
1.50
|
Firewall Penetration
|
Details
|
|
|
10-12-2011
|
0.25
|
Requested Assignment of N-Number
|
Details
|
|
|
10-11-2011
|
1.00
|
Laying out
|
Details
|
|
|
10-10-2011
|
3.00
|
Machining Stack Mounts
|
Details
|
|
|
10-06-2011
|
3.00
|
Magnetometer Wiring
|
Details
|
|
|
10-06-2011
|
2.00
|
Installing Magentometers
|
Details
|
|
|
10-05-2011
|
1.50
|
Routing the Magnitometer Cables
|
Details
|
|
|
10-05-2011
|
3.50
|
Magnetometer Tray
|
Details
|
|
|
10-04-2011
|
1.00
|
First CNC Cut
|
Details
|
|
|
10-02-2011
|
1.00
|
Terminate EFIS Lines
|
Details
|
|
|
09-28-2011
|
0.00
|
Cut Panel
|
Details
|
|
|
09-27-2011
|
1.00
|
Tidy Up Switch Panel
|
Details
|
|
|
09-26-2011
|
0.00
|
N Numbers Reserved
|
Details
|
|
|
09-26-2011
|
1.00
|
Laying Out Panel Connectors
|
Details
|
|
|
09-25-2011
|
0.10
|
CAM and Milling
|
Details
|
|
|
09-24-2011
|
1.00
|
Moved Master & Boost Pump
|
Details
|
|
|
09-23-2011
|
8.00
|
3D CAD of the Instrument Panel
|
Details
|
|
|
09-22-2011
|
4.00
|
Mock Up Panel
|
Details
|
|
|
09-21-2011
|
2.00
|
More Wire Pulls
|
Details
|
|
|
09-21-2011
|
1.00
|
Finalized Panel Layout
|
Details
|
|
|
09-20-2011
|
1.50
|
Sub Panel Design
|
Details
|
|
|
09-20-2011
|
3.00
|
Main Panel Layout
|
Details
|
|
|
09-19-2011
|
2.00
|
Wiring Roll Trim
|
Details
|
|
|
09-17-2011
|
3.00
|
Rework Day
|
Details
|
|
|
09-16-2011
|
2.00
|
Wiring the Main Switch Panel
|
Details
|
|
|
09-15-2011
|
3.00
|
More Wiring
|
Details
|
|
|
09-14-2011
|
1.50
|
More Wiring
|
Details
|
|
|
09-13-2011
|
4.00
|
More Wiring of Vertical Power
|
Details
|
|
|
09-11-2011
|
8.00
|
Wiring Lights, Mags, Alternators
|
Details
|
|
|
09-10-2011
|
4.00
|
VPX Wiring - Switches
|
Details
|
|
|
09-10-2011
|
2.00
|
VP-X Pro Load Planning
|
Details
|
|
|
09-10-2011
|
0.50
|
Grounds
|
Details
|
|
|
09-08-2011
|
2.50
|
Routing Wires Through Front Baggage
|
Details
|
|
|
09-06-2011
|
0.50
|
Vertical Power - Part 2 - Install
|
Details
|
|
|
09-06-2011
|
3.00
|
Vertical Power - Part 1 - Tray
|
Details
|
|
|
09-06-2011
|
0.50
|
Replace Contactor Diodes
|
Details
|
|
|
09-06-2011
|
3.00
|
Parking Brake Remount
|
Details
|
|
|
09-05-2011
|
1.00
|
Rework Wire Routing Behind Spar
|
Details
|
|
|
09-05-2011
|
3.00
|
Mounting VP-X Pro
|
Details
|
|
|
09-04-2011
|
0.20
|
Throttle Bracket
|
Details
|
|
|
09-03-2011
|
0.50
|
Prop Governor
|
Details
|
|
|
08-30-2011
|
1.00
|
Pulling N Number
|
Details
|
|
|
08-21-2011
|
0.30
|
Rebuild Missing Bracket
|
Details
|
|
|
08-21-2011
|
1.00
|
Fast Stack distribution block wiring
|
Details
|
|
|
08-21-2011
|
3.00
|
Basic Stack Assembly
|
Details
|
|
|
08-20-2011
|
2.00
|
Head Scratching
|
Details
|
|
|
08-10-2011
|
2.00
|
Engine Control Mechanisms
|
Details
|
|
|
08-10-2011
|
5.00
|
Avionics Plan
|
Details
|
|
|
11-02-2008
|
4.00
|
Plumbing Brakes
|
Details
|
|
|
11-02-2008
|
8.00
|
Baffle Fitting
|
Details
|
|
|
11-01-2008
|
2.00
|
Wiring - Flaps and Roll Servo
|
Details
|
|
|
08-10-2008
|
40.00
|
Putting Plane on Legs
|
Details
|
|
|
12-10-2007
|
2.00
|
Polishing
|
Details
|
|
|
12-10-2007
|
6.00
|
Parking Brake
|
Details
|
|
|
12-10-2007
|
7.00
|
Layout of the Engine Sub-Panel
|
Details
|
|
|
12-10-2007
|
3.00
|
Completion of the Avionics and Lighting Subpanel
|
Details
|
|
|
12-09-2007
|
6.00
|
Side Panel Wiring
|
Details
|
|
|
12-09-2007
|
6.00
|
Mounting Rudder Pedals and Brake Lines
|
Details
|
|
|
04-23-2007
|
6.00
|
Tagging and Planning
|
Details
|
|
|
04-22-2007
|
3.00
|
Running Tubing
|
Details
|
|
|
04-22-2007
|
6.00
|
Building Rear Seat Assembly
|
Details
|
|
|
04-14-2007
|
10.00
|
More painting of fuselage parts
|
Details
|
|
|
04-13-2007
|
10.00
|
Painting Small Fuselage Interior Parts
|
Details
|
|
|
04-12-2007
|
14.00
|
Paint Booth
|
Details
|
|
|
04-11-2007
|
6.00
|
Repainting the Interior
|
Details
|
|
|
04-06-2007
|
0.13
|
Busy Building Engine Data Monitors
|
Details
|
|
|
04-04-2007
|
2.00
|
Starting Panel Electronics
|
Details
|
|
|
04-02-2007
|
1.00
|
Picking up the airplane
|
Details
|
|
|
03-26-2007
|
2.00
|
The plane goes to the paint shop
|
Details
|
|
|
03-23-2007
|
10.00
|
Painting for Prep
|
Details
|
|
|
01-14-2007
|
20.00
|
Joining Wings
|
Details
|
|
|
09-17-2006
|
2.00
|
Right Side Panel
|
Details
|
|
|
09-10-2006
|
4.00
|
Side Panels
|
Details
|
|
|
09-10-2006
|
2.00
|
Pilot Seat
|
Details
|
|
|
09-10-2006
|
2.00
|
Organizing Electrical Components
|
Details
|
|
|
09-10-2006
|
4.00
|
Antenna Wires
|
Details
|
|
|
09-04-2006
|
2.00
|
Stiffening the Air Ramp
|
Details
|
|
|
09-04-2006
|
6.00
|
Mouting the Landing Gear
|
Details
|
|
|
09-03-2006
|
2.00
|
Routing the Headset & Flap Wires
|
Details
|
|
|
09-01-2006
|
2.50
|
Left Wing Wiring
|
Details
|
|
|
09-01-2006
|
6.00
|
Fiberglassing Tips
|
Details
|
|
|
08-31-2006
|
4.00
|
Wiring Left Side of Aircraft
|
Details
|
|
|
08-30-2006
|
12.00
|
Wiring Right Wing and Empennage
|
Details
|
|
|
08-29-2006
|
2.00
|
Side Panels
|
Details
|
|
|
08-28-2006
|
4.00
|
Mounting Strobe Controller
|
Details
|
|
|
08-28-2006
|
1.00
|
Attaching Brake Cylinders
|
Details
|
|
|
08-27-2006
|
3.00
|
Baggage Skin Prepp
|
Details
|
|
|
08-26-2006
|
1.00
|
Removing For Storage
|
Details
|
|
|
08-26-2006
|
3.00
|
Planning and Pulling Wire to Empennage
|
Details
|
|
|
08-26-2006
|
1.00
|
Organizing Electrical Parts
|
Details
|
|
|
08-26-2006
|
6.00
|
Fiberglassing Tips
|
Details
|
|
|
08-24-2006
|
5.00
|
Separating the Canopy
|
Details
|
|
|
08-23-2006
|
2.00
|
Additional trimming
|
Details
|
|
|
08-22-2006
|
5.00
|
Rough Trimming of Canopy
|
Details
|
|
|
08-21-2006
|
5.00
|
Mounting the Slides
|
Details
|
|
|
08-20-2006
|
4.00
|
Platenuts and Dimpling
|
Details
|
|
|
08-20-2006
|
8.00
|
Building C805 Rail
|
Details
|
|
|
08-20-2006
|
4.00
|
Assembling Seat Backs
|
Details
|
|
|
08-19-2006
|
2.00
|
Trimming and Fitting Fariings
|
Details
|
|
|
08-19-2006
|
2.00
|
Prepping Material
|
Details
|
|
|
08-19-2006
|
2.00
|
Prepping and Painting the Battery Holder
|
Details
|
|
|
08-19-2006
|
2.00
|
Assembly
|
Details
|
|
|
08-18-2006
|
2.00
|
Rudder Peddle Adjustment Latch
|
Details
|
|
|
08-15-2006
|
2.00
|
Wire Plan
|
Details
|
|
|
08-13-2006
|
3.00
|
Rudder Stops
|
Details
|
|
|
08-13-2006
|
5.00
|
Plate Nuts
|
Details
|
|
|
08-13-2006
|
3.00
|
Fabricating Battery Tray
|
Details
|
|
|
08-12-2006
|
8.00
|
Installing Rudder
|
Details
|
|
|
08-12-2006
|
12.00
|
Elevator Controls
|
Details
|
|
|
08-11-2006
|
7.00
|
Attaching and Adjusting Elevator
|
Details
|
|
|
08-10-2006
|
3.00
|
Riveting and Bolting
|
Details
|
|
|
08-09-2006
|
3.00
|
Setting Incidence
|
Details
|
|
|
08-09-2006
|
3.00
|
Oxygen Tank Mounts
|
Details
|
|
|
08-08-2006
|
6.00
|
Attaching the Vertical Stabilizer
|
Details
|
|
|
08-07-2006
|
3.00
|
Setting Incidence
|
Details
|
|
|
08-05-2006
|
2.00
|
Joining HS to Fuselage
|
Details
|
|
|
08-04-2006
|
2.00
|
Joining Horizontal Stab
|
Details
|
|
|
07-25-2006
|
2.00
|
Rough attachment
|
Details
|
|
|
07-25-2006
|
2.00
|
Receiving Finish Kit
|
Details
|
|
|
07-25-2006
|
1.00
|
Installing Rudder Cables
|
|
|
|
07-20-2006
|
2.00
|
Planning
|
Details
|
|
|
07-19-2006
|
1.50
|
Installed the Servo Elevator Bellcrank
|
Details
|
|
|
07-19-2006
|
1.50
|
Installed the front canopy support
|
Details
|
|
|
07-19-2006
|
3.00
|
Drilling Baggage Skin
|
Details
|
|
|
07-17-2006
|
4.00
|
Preppig and Drilling Skin
|
Details
|
|
|
07-17-2006
|
1.50
|
Installing Pilot Back Support
|
Details
|
|
|
07-16-2006
|
1.00
|
Re Fabrication of Bell Crank Mount
|
Details
|
|
|
07-09-2006
|
3.00
|
Platenuts and Prepping
|
Details
|
|
|
07-09-2006
|
2.00
|
Mounting Rudder Pedals
|
Details
|
|
|
07-09-2006
|
1.00
|
Elevator Bellcrank Servo Mount
|
Details
|
|
|
07-08-2006
|
2.00
|
Match Drilled Floors
|
Details
|
|
|
07-07-2006
|
2.00
|
Mid Cabin Floors
|
Details
|
|
|
07-07-2006
|
3.00
|
Installing Consoles
|
Details
|
|
|
07-07-2006
|
3.00
|
Drilling and Prepping
|
Details
|
|
|
07-06-2006
|
2.00
|
Left Console
|
Details
|
|
|
07-04-2006
|
2.00
|
Servos
|
Details
|
|
|
07-04-2006
|
2.00
|
Riveting and Fabrication
|
Details
|
|
|
07-04-2006
|
2.00
|
Mounting Baggage Floor
|
Details
|
|
|
07-04-2006
|
2.00
|
Left Console
|
Details
|
|
|
07-03-2006
|
1.50
|
Rear Side Panels
|
Details
|
|
|
07-03-2006
|
2.00
|
Platnuts, Platenuts, Platenuts
|
Details
|
|
|
07-03-2006
|
3.00
|
Platenuts
|
Details
|
|
|
07-03-2006
|
0.50
|
Mounting Brackets
|
Details
|
|
|
07-02-2006
|
1.00
|
Rear Side Panels
|
Details
|
|
|
07-02-2006
|
5.00
|
Finish Nutplates
|
Details
|
|
|
07-01-2006
|
5.00
|
Platenut Rivets
|
Details
|
|
|
06-30-2006
|
1.00
|
Setting up Control Tube
|
Details
|
|
|
06-30-2006
|
0.50
|
Ordering Oxygen System
|
Details
|
|
|
06-30-2006
|
4.00
|
Mounting the Flap Motor
|
Details
|
|
|
06-29-2006
|
1.00
|
Prepping Platenuts
|
Details
|
|
|
06-29-2006
|
3.00
|
Flap Weldament
|
Details
|
|
|
06-28-2006
|
1.00
|
Unpacking and Organizing
|
Details
|
|
|
06-28-2006
|
4.00
|
Fabricating Elevator Bell Crank and Push Rods
|
Details
|
|
|
06-27-2006
|
1.50
|
Sorting and Binning Parts
|
Details
|
|
|
06-27-2006
|
2.50
|
Riveting Floors
|
Details
|
|
|
06-27-2006
|
3.00
|
Mounting Control Column
|
Details
|
|
|
06-26-2006
|
2.00
|
Prep and Paint
|
Details
|
|
|
06-26-2006
|
1.00
|
Plate Nuts
|
Details
|
|
|
06-25-2006
|
1.50
|
Prep
|
Details
|
|
|
06-25-2006
|
3.00
|
Nut Plates
|
Details
|
|
|
06-24-2006
|
3.50
|
Trimming and Mounting Wingtips
|
Details
|
|
|
06-24-2006
|
2.00
|
Adjusted Aileron Bell Crank
|
Details
|
|
|
06-23-2006
|
1.00
|
General Clean UP
|
Details
|
|
|
06-23-2006
|
1.50
|
Attaching Ailerons and Flaps
|
Details
|
|
|
06-21-2006
|
2.00
|
Correcting Hinges, Drilling skins for platenuts
|
Details
|
|
|
06-19-2006
|
4.50
|
Riveting Stiffeners
|
Details
|
|
|
06-18-2006
|
7.50
|
Prepping Floor Skins
|
Details
|
|
|
06-15-2006
|
1.00
|
Trimming Floor for Removal
|
Details
|
|
|
06-14-2006
|
3.00
|
Match Drilling Floors
|
Details
|
|
|
06-13-2006
|
1.00
|
Pitot Mast and Electrical
|
Details
|
|
|
06-13-2006
|
2.50
|
Cleco up the floors
|
Details
|
|
|
06-12-2006
|
0.50
|
Grounding Lugs
|
Details
|
|
|
06-11-2006
|
12.00
|
Riveting Skins
|
Details
|
|
|
06-10-2006
|
3.00
|
Tall Pilot
|
Details
|
|
|
06-10-2006
|
5.00
|
Prep
|
Details
|
|
|
06-07-2006
|
1.50
|
Fuel Level Sensor and Tank Covers
|
Details
|
|
|
06-04-2006
|
3.00
|
Wiring
|
Details
|
|
|
06-04-2006
|
2.00
|
Tank Pickup
|
Details
|
|
|
06-02-2006
|
3.00
|
Trimming and Drilling Hings
|
Details
|
|
|
05-31-2006
|
3.00
|
Match Drilling Skins
|
Details
|
|
|
05-28-2006
|
4.00
|
Install Gretz Smart Heated Pitot
|
Details
|
|
|
05-27-2006
|
2.00
|
Fuel pickup and level sensor
|
Details
|
|
|
05-27-2006
|
4.00
|
Assembly and Installation
|
Details
|
|
|
05-26-2006
|
1.50
|
Cut Left Landing Light Opening
|
Details
|
|
|
05-25-2006
|
2.00
|
Prepping Parts
|
Details
|
|
|
05-24-2006
|
2.00
|
Cutting Wing Skin
|
Details
|
|
|
05-23-2006
|
2.00
|
Pulling Conduit
|
Details
|
|
|
05-23-2006
|
0.25
|
Ordering Prop
|
Details
|
|
|
05-20-2006
|
1.25
|
Drilling Conduit for Right Wing
|
Details
|
|
|
05-19-2006
|
5.00
|
Conduit and Bushings
|
Details
|
|
|
05-18-2006
|
1.00
|
Aileron Gap Seal Riveting
|
Details
|
|
|
05-16-2006
|
1.50
|
Riveting Gap Seals
|
Details
|
|
|
05-15-2006
|
1.50
|
Ordering The Engine
|
Details
|
|
|
05-15-2006
|
9.00
|
Flap Attachement
|
Details
|
|
|
05-14-2006
|
6.00
|
Aileron Hinges and Initial Mounting
|
Details
|
|
|
05-12-2006
|
3.00
|
Assembly
|
Details
|
|
|
05-12-2006
|
1.00
|
Aileron Hinge Assembly
|
Details
|
|
|
05-11-2006
|
4.00
|
Drilling and painting pushrods
|
Details
|
|
|
05-10-2006
|
2.00
|
Reaming and Reaming
|
Details
|
|
|
05-10-2006
|
2.00
|
Drilling pushrods and rod-ends
|
Details
|
|
|
05-07-2006
|
1.00
|
Reaming bushings
|
Details
|
|
|
05-02-2006
|
1.50
|
Prep work
|
Details
|
|
|
05-01-2006
|
2.00
|
Fabricating Aileron Hinges
|
Details
|
|
|
04-30-2006
|
1.00
|
Speed Mods and Engine
|
Details
|
|
|
04-30-2006
|
1.00
|
Cradle Completion
|
Details
|
|
|
04-30-2006
|
1.00
|
Aileron Control Tubes
|
Details
|
|
|
04-29-2006
|
2.00
|
Beginnings of the Fuselage Cradle
|
Details
|
|
|
04-25-2006
|
3.00
|
Wing Cradle
|
Details
|
|
|
04-24-2006
|
1.00
|
Shop Jigs
|
Details
|
|
|
04-24-2006
|
4.00
|
Parts Inventory
|
Details
|
|
|
04-20-2006
|
2.00
|
Unloading
|
Details
|
|
|
04-19-2006
|
1.00
|
Kit Pickup- More
|
Details
|
|
|
04-19-2006
|
16.00
|
Kit Pickup
|
Details
|
|
|
03-27-2006
|
0.00
|
No Kit.....
|
Details
|
|
|
02-09-2006
|
2.00
|
Fabricated E616 and Mounted Trim Servo
|
Details
|
|
|
02-08-2006
|
2.00
|
Rolling Leading Edge
|
Details
|
|
|
02-07-2006
|
0.50
|
Trim Riveting
|
Details
|
|
|
02-02-2006
|
6.00
|
Riveting Left Elevator - Finally
|
Details
|
|
|
02-02-2006
|
1.00
|
Rebuilding CP214 Squeezer
|
Details
|
|
|
02-01-2006
|
6.00
|
Final Prep
|
Details
|
|
|
01-27-2006
|
4.00
|
Priming and Deburring
|
Details
|
|
|
01-23-2006
|
1.00
|
Debur and Dimple Skin
|
Details
|
|
|
01-21-2006
|
5.00
|
Prep Parts
|
Details
|
|
|
01-14-2006
|
4.00
|
Deburring and Preping
|
Details
|
|
|
01-14-2006
|
1.00
|
Bending Leading Edge
|
Details
|
|
|
01-12-2006
|
2.50
|
Mount Trim hinge, machine countersink
|
Details
|
|
|
01-11-2006
|
2.50
|
Prep Left Elevator
|
Details
|
|
|
01-11-2006
|
1.50
|
Bending Trim
|
Details
|
|
|
01-09-2006
|
1.00
|
Left Elevator Spar Assembly
|
Details
|
|
|
01-08-2006
|
8.00
|
Rudder Assembly
|
Details
|
|
|
01-08-2006
|
2.00
|
Prime rudder parts
|
Details
|
|
|
01-08-2006
|
3.00
|
Bending the rudder leading edge
|
Details
|
|
|
01-07-2006
|
2.00
|
QA and Corrections - Stablizers and Rt Rudder
|
Details
|
|
|
01-07-2006
|
8.00
|
Dimple, Debur and Prime
|
Details
|
|
|
01-05-2006
|
3.00
|
Rudder Prep
|
Details
|
|
|
01-04-2006
|
0.50
|
Prep Stiffeners
|
Details
|
|
|
01-04-2006
|
3.00
|
Formed Rudder Stiffeners
|
Details
|
|
|
01-04-2006
|
0.50
|
Finished Riveting Right Elevator
|
Details
|
|
|
01-03-2006
|
2.00
|
Riveting Right Rudder
|
Details
|
|
|
01-03-2006
|
1.50
|
Bending Right Elevator
|
Details
|
|
|
01-02-2006
|
4.00
|
Riveting Right Elevator Subassemblies
|
Details
|
|
|
01-01-2006
|
2.00
|
Priming Rudder
|
Details
|
|
|
12-31-2005
|
6.00
|
Drilling, Dimpling, Deburring Right Elevator
|
Details
|
|
|
12-28-2005
|
3.00
|
Form elevator stiffeners
|
Details
|
|
|
12-27-2005
|
3.00
|
Inspection, Rework and close out
|
Details
|
|
|
12-27-2005
|
2.00
|
Inspection & Close Out
|
Details
|
|
|
12-25-2005
|
1.50
|
Rivet Skin
|
Details
|
|
|
12-24-2005
|
1.00
|
Spar hinge mounting
|
Details
|
|
|
12-24-2005
|
2.00
|
Rivet rear spar
|
Details
|
|
|
12-23-2005
|
3.30
|
Skin Riveting Right Stab. Skin
|
Details
|
|
|
12-22-2005
|
2.00
|
Skin Riveting - Left side complete
|
Details
|
|
|
12-21-2005
|
2.00
|
Skin Riveting
|
Details
|
|
|
12-19-2005
|
4.00
|
Riveting Spars
|
Details
|
|
|
12-19-2005
|
1.00
|
Riveting Skin
|
Details
|
|
|
12-18-2005
|
5.00
|
Priming and first rivets
|
Details
|
|
|
12-17-2005
|
15.00
|
Skin Drilling
|
Details
|
|
|
12-16-2005
|
3.50
|
Prepare for drilling
|
Details
|
|
|
12-15-2005
|
1.50
|
Repair defective ribs
|
Details
|
|
|
12-14-2005
|
2.00
|
Dimpling
|
Details
|
|
|
12-12-2005
|
1.00
|
Research deviations from print
|
Details
|
|
|
12-11-2005
|
10.00
|
Vertical Fin
|
Details
|
|
|
12-11-2005
|
6.00
|
Horizontal Stab
|
Details
|
|
|
12-10-2005
|
16.00
|
Prepare HS Spar Assembly
|
Details
|
|
|
11-09-2005
|
1.00
|
Shop Setup, Tool inspection
|
|
|