KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
Work Logs Found: 720
Category Work Time: 1548 Hours
 Date
Hours
Work Log Summary

Details

 07-15-2018
0.00
Hooker Harnesses for sale
Details
     

 01-16-2018
0.00
Batteries for sale
       

 05-17-2017
0.00
SkyView VHF radio for sale
       

 01-23-2017
0.00
Sensinich prop for sale
       

 09-25-2016
0.00
Landing touchdown
     

 04-06-2016
0.00
200 Kt Club
Details
       

 03-05-2016
0.00
Kelli Girl
       

 02-20-2016
0.00
tug 2
       

 02-20-2016
0.00
tug 1
       

 11-22-2015
0.00
b
       

 11-21-2015
0.00
a
       

 11-20-2015
0.00
c
       

 11-19-2015
0.00
b
       

 11-18-2015
0.00
a
       

 11-17-2015
0.00
d
       

 11-16-2015
0.00
c
       

 11-15-2015
0.00
b
       

 11-14-2015
0.00
a
       

 11-11-2015
0.00
d
       

 11-10-2015
0.00
c
       

 11-09-2015
0.00
b
       

 11-08-2015
0.00
a
       

 11-06-2015
0.00
b
       

 11-05-2015
0.00
a
       

 11-04-2015
0.00
D
       

 11-03-2015
0.00
C
       

 11-02-2015
0.00
b
       

 11-01-2015
0.00
A
       

 07-28-2015
0.00
panel
       

 07-28-2015
0.00
caddy
       

 07-20-2015
1.00
Houston's first flight in N260KM
       

 07-18-2015
0.00
First Phase II flight, with Kelli
       

 04-07-2015
2.00
DAR Mel Asbury issues N260KM it's Airworthiness Ce
Details
       

 03-30-2015
1.00
Washing her down, getting ready for inspection
Details
       

 03-27-2015
3.00
First engine start, systems test run
Details
       

 03-26-2015
2.50
Randy Richmond's Pre-inspection
Details
       

 03-25-2015
1.00
Pilot's Operating Handbook--POH
Details
     

 03-25-2015
3.00
Clean-up items
Details
       

 03-22-2015
3.00
Calibrating fuel level, looking for leaks, part 2
Details
       

 03-22-2015
4.00
Calibrating fuel level, looking for leaks, part 1
Details
       

 03-20-2015
3.00
Rewiring the flap position sensor
Details
       

 03-16-2015
1.00
Tire fairing doors for air pressure checks, part 2
Details
       

 03-16-2015
3.00
Tire fairing doors for air pressure checks, part 1
Details
       

 03-15-2015
3.00
Weight & Balance, part 2
Details
       

 03-15-2015
2.00
Weight & Balance, part 1
Details
       

 03-15-2015
2.00
Copilot Function kill switch
Details
       

 03-09-2015
2.00
Mounted/tested ELT, sealed fuselage center ribs
Details
       

 03-09-2015
2.00
Firewall pass-through, oil drain magnet
Details
       

 02-26-2015
3.00
Wingtip lights, part 4
Details
       

 02-25-2015
2.00
Wingtip lights, part 3
Details
       

 02-24-2015
3.00
Wingtip lights, part 2
Details
       

 02-24-2015
1.50
Right wingtip rib
Details
       

 02-18-2015
3.00
Wingtip lights, part 1
Details
       

 02-12-2015
2.00
Safety tape, stall warning, wing root fairings
Details
       

 02-12-2015
1.00
New fuel line -- right wing to fuel tank valve
Details
       

 02-12-2015
2.00
Left wingtip light cover
Details
       

 02-09-2015
4.00
Wingtip aft edge, edge alignment
Details
       

 02-09-2015
1.00
Priming and sanding fiberglass parts, fairings
Details
       

 02-09-2015
4.00
Left wingtip ribs, platenuts
Details
       

 02-08-2015
3.00
Filling pinholes
Details
       

 02-05-2015
3.00
Wingtip reinforcements
Details
       

 02-03-2015
2.00
Wing trailing edge adjustments, part 2
Details
       

 02-03-2015
2.00
Wing trailing edge adjustments
Details
       

 01-27-2015
1.00
Fitting the wingtips, part 2
Details
       

 01-27-2015
3.00
Fitting the wingtips, part 1
Details
       

 01-27-2015
2.00
Connecting the aileron trim
Details
       

 01-21-2015
1.00
Installing the ailerons, part 2
Details
       

 01-21-2015
3.00
Installing the ailerons, part 1
Details
       

 01-20-2015
2.00
Flap extension sensor, part 2
Details
       

 01-20-2015
2.00
Flap extension sensor, part 1
Details
       

 01-19-2015
3.00
Building the jack stands
Details
       

 01-17-2015
2.00
Building the wing root fairings, part 2
Details
       

 01-17-2015
3.00
Building the wing root fairings, part 1
Details
       

 01-16-2015
3.00
Flap actuator connections, seals
Details
       

 01-10-2015
1.00
Zip-tying firesleeve around the oil cooler return
Details
     

 01-10-2015
2.00
New fuel valve and lines, part 1
Details
       

 01-10-2015
0.00
Moving to Location #5, part 2
Details
       

 01-10-2015
2.00
Moving to Location #5, part 1
Details
       

 01-05-2015
0.00
Winter gear
Details
       

 01-05-2015
2.00
Flap arm hole seals
Details
       

 01-03-2015
2.00
Hanging the flaps
Details
       

 01-03-2015
3.00
Flaps: Fit and Trim
Details
       

 01-03-2015
1.00
Flap actuator arms
Details
       

 12-31-2014
2.00
Re-plumbing the fuel lines, part 3
Details
       

 12-31-2014
0.50
Re-plumbing the fuel lines, part 2
Details
       

 12-31-2014
2.00
Re-plumbing the fuel lines, part 1
Details
       

 12-31-2014
1.00
Connecting the fuel level electrical leads
Details
       

 12-28-2014
1.00
Tapping the forward access panels' screw holes
Details
       

 12-28-2014
1.00
Installing the aircraft identa-plate
Details
       

 12-28-2014
1.00
Applying the N-number decals
Details
       

 12-28-2014
1.00
Applying the "Experimental" decal
Details
       

 12-27-2014
3.00
Riveting the Forward Skin to the airplane, Part 2
Details
       

 12-27-2014
2.00
Riveting the Forward Skin to the airplane, Part 1
Details
       

 12-24-2014
2.00
Forward Access Panels redux
Details
       

 12-24-2014
2.00
Countersinking the Forward Access Panels' screw ho
Details
       

 12-18-2014
3.00
Riveting the access panel doublers to the forward
Details
     

 12-18-2014
1.00
ProSealing the aft window edge
Details
       

 12-18-2014
1.00
Intersection Fairings FAIL -- Follow-up
Details
     

 12-18-2014
2.00
Creating the ProSeal gasket for the access panels
Details
       

 12-15-2014
3.00
Screws & Platenuts for the forward access panels
Details
       

 12-10-2014
3.00
Matchdrilling the doubler and skin (continued)
Details
       

 12-10-2014
2.00
Dimpling the forward skin access panel rivet holes
Details
       

 12-08-2014
1.50
Cutting the access panel holes, part 2
Details
       

 12-08-2014
1.00
Cutting the access panel holes, part 1
Details
       

 12-08-2014
2.00
Access Panel Doubler rivet holes
Details
       

 12-01-2014
4.00
Removing the top forward fuselage skin
Details
       

 12-01-2014
2.00
Designing the forward access panel templates
Details
       

 12-01-2014
2.00
Cutting and shaping the doublers, part 1
Details
       

 11-29-2014
1.00
Running the wing pitot/AOA tubing
Details
       

 11-29-2014
1.00
Preparing the pitot probe for install
Details
       

 11-29-2014
0.50
Pitot/AOA plumbing final connection
Details
       

 11-29-2014
1.00
Installing the pitot probe to the left wing
Details
       

 11-28-2014
2.00
Wing fuel vent lines
Details
       

 11-26-2014
2.50
Torquing the wing bolts
Details
       

 11-26-2014
1.00
Bolting, safety wiring the fuel tank attach bracke
Details
     

 11-22-2014
0.00
Wing cradle
Details
     

 11-22-2014
0.50
Permanently mating Wings to Fuselage, Part 5
Details
       

 11-22-2014
2.00
Permanently mating Wings to Fuselage, Part 4
Details
       

 11-22-2014
1.00
Permanently mating Wings to Fuselage, Part 3
Details
       

 11-22-2014
1.50
Permanently mating Wings to Fuselage, Part 2
Details
       

 11-22-2014
1.00
Permanently mating Wings to Fuselage, Part 1
Details
       

 11-20-2014
3.00
Intersection Fairings, part 3 -- FAIL
Details
       

 11-19-2014
1.50
Propeller final installation
Details
       

 11-19-2014
1.00
Leg Fairing alignment pins
Details
       

 11-14-2014
3.00
Intersection Fairings, part 2
Details
       

 11-14-2014
3.00
Intersection Fairings, part 1
Details
       

 11-09-2014
0.00
Free Box
     

 11-06-2014
0.50
Nose Fairing, part 3
Details
       

 11-06-2014
2.00
Nose Fairing, part 2
Details
       

 11-06-2014
1.00
Exhaust pipe repair
Details
       

 11-05-2014
3.00
Nose Fairing, part 1
Details
       

 10-31-2014
1.50
Installing Wheel Pants, part 9
Details
     

 10-31-2014
0.50
Installing Wheel Pants, part 8
Details
       

 10-31-2014
3.00
Installing Wheel Pants, part 7
Details
       

 10-30-2014
1.50
Installing Wheel Pants, part 6
Details
       

 10-30-2014
2.00
Installing Wheel Pants, part 5
Details
       

 10-29-2014
0.50
Installing Wheel Pants, part 4
Details
     

 10-29-2014
1.00
Installing Wheel Pants, part 3
Details
       

 10-29-2014
1.50
Installing Wheel Pants, part 2
Details
       

 10-29-2014
2.50
Installing Wheel Pants, part 1
Details
       

 10-23-2014
1.50
Aligning the leg fairings, Part 2
Details
       

 10-23-2014
2.50
Aligning the leg fairings, Part 1
Details
       

 10-22-2014
4.00
Gear Leg Fairing shimmy dampeners
Details
       

 10-20-2014
3.00
Man Gear Fairings -- Installing the piano hinge pa
Details
       

 10-20-2014
2.00
Cowling/Spinner clearance check
Details
       

 10-17-2014
3.00
Man Gear Fairings -- Installing the piano hinge
Details
       

 10-16-2014
0.50
Sam Toy, of Kaiser Airlines (prop bolts)
Details
       

 10-16-2014
0.50
Prop Spinner Installation, part 3
Details
       

 10-16-2014
0.50
Canopy Guides, fuel tank drain fairings
Details
       

 10-16-2014
2.00
Aligning the Leg Fairings
Details
       

 10-11-2014
1.50
Spinner prop hole backing plates, part 3
Details
       

 10-11-2014
1.50
Prop Spinner Installation, part 2
Details
       

 10-11-2014
1.50
Prop Spinner Installation, part 1
Details
       

 10-10-2014
2.00
FAB Snorkel, final install
Details
       

 10-09-2014
2.00
Spinner front plate
Details
       

 10-08-2014
2.50
Spinner prop hole backing plates, part 2
Details
       

 10-08-2014
1.50
Spinner prop hole backing plates, part 1
Details
       

 10-05-2014
3.00
Redux: Left Intake Snorkel mount, part 3
Details
       

 10-05-2014
2.00
Prop Install, part 2
Details
       

 10-05-2014
1.50
New fuel line, oil quickdrain
Details
       

 10-01-2014
2.00
Prop install, part 1
Details
       

 10-01-2014
0.00
Loki, our new hangar dog
Details
     

 09-26-2014
1.00
Canopy Sun Shade
Details
       

 09-26-2014
3.00
Anti-Splat nose gear brace, tow bar lugs
Details
       

 09-25-2014
3.00
Redux: Left Intake Snorkel mount, part 2
Details
       

 09-21-2014
1.00
Cowling platenuts
Details
       

 09-21-2014
2.00
Cowling oil door, part 6
Details
       

 09-21-2014
2.00
Cowling oil door, part 5
Details
       

 09-21-2014
3.00
Cowling heat protection
Details
       

 09-19-2014
2.00
Cowling Paint
Details
       

 09-18-2014
3.00
Cowling oil door, part 4
Details
       

 09-17-2014
1.50
Cowling oil door, part 3
Details
       

 09-17-2014
2.00
Cowling oil door, part 2
Details
       

 09-15-2014
2.00
Glareshield Pad
Details
       

 09-15-2014
1.50
Cowling oil door, part 1
Details
       

 09-09-2014
2.00
Installing ignition/spark wires, part 2
Details
       

 09-09-2014
1.00
Alternate Air Door/oil line conflict, Part 2
Details
       

 09-09-2014
5.00
Alternate Air Door/oil line conflict, Part 1
Details
       

 09-08-2014
2.00
Redux: Left Intake Snorkel mount, part 1
Details
       

 09-08-2014
2.00
Installing ignition/spark wires, part 1
Details
       

 09-08-2014
2.00
Alternate Air Door, part 1
Details
       

 08-29-2014
2.00
Installing Oil Cooler/hoses and alternate air cabl
Details
       

 08-25-2014
3.00
FAB Snorkel, part 4
Details
       

 08-21-2014
2.00
Removing the inner crankshaft oil plug (for fixed
Details
       

 08-20-2014
0.10
More blood!
Details
     

 08-20-2014
3.00
FAB Snorkel, part 3
Details
       

 08-18-2014
2.00
FAB Snorkel, part 2
Details
       

 08-18-2014
2.00
FAB Snorkel, part 1
Details
       

 08-16-2014
2.00
Top Cowl intake-to-cealing ramps
Details
       

 08-16-2014
3.00
Lower Cowl Intakes' rubber cloth
Details
       

 08-13-2014
3.00
Wired Fuel Flow Transducer, installed blast tubes
Details
       

 08-13-2014
3.00
Footheat air scat tube installation
Details
       

 08-12-2014
0.10
Status Shot
Details
     

 08-12-2014
5.00
Baffle rubber cloth install
Details
       

 08-07-2014
4.00
Baffle Walls, part 3
Details
       

 07-30-2014
3.00
Installed cockpit placards and mood lights
Details
       

 07-29-2014
2.00
Misc. Baffle hardware install
Details
       

 07-29-2014
3.00
Baffle Walls, part 2
Details
       

 07-28-2014
3.00
Baffle Walls, part 1
Details
       

 07-26-2014
3.00
Baffle Intake conical gussets
Details
       

 07-25-2014
4.00
Cleaning up, reassembling the canopy
Details
       

 07-24-2014
3.00
Forward baffles part 4
Details
       

 07-20-2014
3.00
Forward baffles part 3
Details
       

 07-19-2014
0.10
Snoopy Doo's Last Hangar Day
Details
       

 07-18-2014
2.00
Forward baffles part 2
Details
       

 07-18-2014
3.00
Forward baffles
Details
       

 07-10-2014
6.00
Cowling exterior finished
Details
       

 07-08-2014
8.00
Finishing the canopy frame
Details
       

 07-02-2014
2.00
Test-fitting all four cylinders' baffles
Details
       

 07-02-2014
2.00
#3 Cylinder baffle
Details
       

 07-02-2014
3.00
#1 and #2 cylinder baffles, Top engine mount brack
Details
       

 07-01-2014
4.00
Number 4 baffle and oil cooler, part 2
Details
       

 06-29-2014
7.00
Surface finish/pinhole fill, coat #1
Details
       

 06-29-2014
2.00
Final cowling fit
Details
       

 06-28-2014
3.00
Number 4 baffle and oil cooler, part 1
Details
       

 06-25-2014
3.00
Installing the cowling side camlocs
Details
       

 06-24-2014
2.00
Main Fuel Line re-route and protection
Details
       

 06-24-2014
3.00
Fabricating Cyl 4 baffle wall
Details
       

 06-18-2014
3.00
Oil dipstick, footheat scat tubing
Details
       

 06-18-2014
3.00
Camloc Flange side connections
Details
       

 06-17-2014
6.00
Bottom Cowling Center Brace
Details
       

 06-16-2014
4.00
Top/Bottom Cowl Camloc Stud Holes
Details
       

 06-16-2014
4.00
Top and Bottom Cowl Camlocs
Details
       

 06-16-2014
2.00
Fixing the left side cowling gap
Details
       

 06-01-2014
3.00
Top Cowl Camlocs, part 1
Details
       

 06-01-2014
2.00
Bottom cowling fitting and trimming, part 3
Details
       

 05-31-2014
2.00
Bottom cowling fitting and trimming, part 2
Details
       

 05-28-2014
6.00
Bottom cowling fitting and trimming
Details
       

 05-27-2014
2.00
Center floor cover angle channel, part 3
Details
       

 05-27-2014
2.00
Center floor cover angle channel, part 2
Details
       

 05-27-2014
2.00
Center floor cover angle channel, part 1
Details
       

 05-24-2014
3.00
Blocking the top cowling
Details
       

 05-22-2014
3.00
Cockpit fuel line/wiring floor covers
Details
       

 05-22-2014
2.00
Cockpit air ducting
Details
       

 05-21-2014
3.00
Cowling top half trim/fit
Details
       

 05-20-2014
2.00
Footheat muff installation, part 2
Details
       

 05-20-2014
2.00
Footheat muff installation, part 1
Details
       

 05-20-2014
2.00
Cowling oil door access
Details
       

 05-16-2014
2.00
Protecting the sniffle valve and throttle cables
Details
       

 05-10-2014
3.00
Riveting on top front fuselage skin, part 2
Details
       

 05-09-2014
2.00
Riveting on top front fuselage skin, part 1
Details
       

 05-04-2014
0.00
Texas Scottish Festival & Highland Games -- VAF Ha
Details
     

 04-30-2014
2.00
Installing the Warning Light CBs, part 2
Details
       

 04-29-2014
3.00
Installing the Warning Light CBs, part 1
Details
       

 04-29-2014
2.00
Installing the "Red Cube" fuel transducer
Details
       

 04-14-2014
3.00
EMS Sensor wire routing
Details
       

 04-04-2014
6.00
Wiring the EMS Sensors part 1
Details
       

 03-25-2014
3.00
Oil/Air Seperator part 2
Details
       

 03-25-2014
2.00
Oil/Air Seperator installation part 1
Details
       

 03-21-2014
4.00
Installing the Throttle and Mixture cables
Details
       

 03-20-2014
4.00
Installing the alternator and shunt
Details
       

 03-19-2014
3.00
Installing the manifold pressure line and sensor
Details
       

 03-19-2014
3.00
Fuel Pump Overflow and Pressure Sensor connections
Details
       

 03-19-2014
2.00
Fabricating/installing the engine sniffle valve
Details
       

 03-18-2014
2.00
Installing the Fuel Injector
Details
       

 03-12-2014
2.00
Installing the exhaust pipe hanger supports
Details
       

 03-11-2014
2.00
Installing the engine exhaust system
Details
       

 03-10-2014
3.00
Throttle/Mixture linkages
Details
       

 03-08-2014
1.00
TEST
Details

 03-06-2014
1.00
Hanging the Engine part 2
Details
       

 03-06-2014
4.00
Hanging the Engine part 1
Details
       

 03-05-2014
2.00
Uncrating the engine
Details
       

 03-05-2014
2.00
Prepping the engine for installation
Details
       

 02-28-2014
3.00
SB 14-01-31 part 8, reinstalling the empennage
Details
       

 02-26-2014
4.00
SB 14-01-31 part 7, match-drilling and riveting th
Details
       

 02-26-2014
2.00
SB 14-01-31 part 6, fabricating the main rib forwa
Details
       

 02-25-2014
3.00
SB 14-01-31 part 5, riveting doublers to the forwa
Details
       

 02-25-2014
3.00
SB 14-01-31 part 4, positioning the spar doublers
Details
       

 02-25-2014
2.00
SB 14-01-31 part 3, main rib forward flange remova
Details
       

 02-24-2014
2.00
SB 14-01-31 part 2, removing forward spar angles
Details
       

 02-21-2014
4.00
SB 14-01-31 part 1
Details
       

 02-19-2014
4.00
Installing VHF comm antennae
Details
       

 02-10-2014
3.00
Running antennae cables, fuel vent lines
Details
       

 02-01-2014
2.00
Installing Dynon Skyview VHF, part 3
Details
       

 01-25-2014
2.00
New canopy latch, part 6
Details
       

 01-25-2014
2.00
New canopy latch, part 5
Details
       

 01-25-2014
1.00
Control Sticks: Assembly and wiring part 3
Details
       

 01-24-2014
3.00
New canopy latch, part 4
Details
       

 01-24-2014
3.00
New canopy latch, part 3
Details
       

 01-22-2014
2.00
New canopy latch, part 2
Details
       

 01-22-2014
3.00
New canopy latch, part 1
Details
       

 01-22-2014
3.00
Installing Dynon Skyview VHF, part 2
Details
       

 01-16-2014
1.00
There will be blood!
Details
       

 01-16-2014
3.00
Installing Dynon Skyview VHF, part 1
Details
       

 01-16-2014
2.00
Foot Heat control cable
Details
       

 01-14-2014
2.00
Parking Brake Cable
Details
       

 01-12-2014
3.00
Spar bulkhead side plate covers, part 2
Details
       

 01-08-2014
4.00
Spar bulkhead side plate covers, part 1
Details
       

 12-31-2013
3.00
Control Sticks: Assembly and wiring part 2
Details
       

 12-30-2013
2.00
Conformal mount, top anti-collision beacon, part 4
Details
       

 12-30-2013
2.00
Conformal mount, top anti-collision beacon, part 3
Details
       

 12-26-2013
2.00
Connecting the rudder to the pedals, part 2
Details
       

 12-26-2013
2.00
Connecting the rudder to the pedals, part 1
Details
       

 12-24-2013
3.00
Control Sticks: Assembly and wiring part 1
Details
       

 12-23-2013
2.00
Conformal mount, top anti-collision beacon, part 2
Details
       

 12-23-2013
3.00
Conformal mount, top anti-collision beacon, part 1
Details
       

 12-16-2013
2.00
Control sticks: Final fit, paint
Details
       

 12-13-2013
3.00
Assembling the sticks
Details
       

 11-27-2013
1.00
Modifying the control stick design, part 2
Details
       

 11-27-2013
2.00
Modifying the control stick design, part 1
Details
       

 11-20-2013
2.00
Prepping the stick grips, cross connectors
Details
       

 11-20-2013
1.00
New switches for the nav lights, beacons, and stro
Details
       

 11-13-2013
4.00
Forming the canopy fairing
Details
       

 11-04-2013
4.00
Installing the canopy skirts to the canopy frame
Details
       

 10-31-2013
2.00
Install rudder cable outlet covers
Details
       

 10-31-2013
2.00
Building up canopy frame sides, part 2
Details
       

 10-29-2013
4.00
Installing the empennage fairing
Details
       

 10-23-2013
3.00
Horizontal stab end caps: Filling, final install
Details
       

 10-23-2013
3.00
Building up canopy frame sides
Details
       

 10-15-2013
2.00
Elevator/push tube connections
Details
       

 10-12-2013
2.00
Bolted the Rudder into place!
Details
       

 10-08-2013
2.00
Horizontal Stabilizer end caps
Details
       

 10-08-2013
2.00
Balancing the elevators
Details
     

 10-03-2013
2.00
Installing/connecting the elevator trim servo
Details
       

 10-03-2013
3.00
Bolting on the elevator
Details
       

 08-23-2013
4.00
Running the elevator trim cable
Details
       

 08-20-2013
3.00
Installing the horizontal/vertical stabilizers
Details
       

 08-15-2013
3.00
Empennage fairing, part 1
Details
       

 08-14-2013
3.00
Vertical Stab Top Cap part 2
Details
       

 08-14-2013
3.00
Empennage fairing, part 1
Details
       

 07-20-2013
2.00
Elevator end caps, part 2
Details
       

 07-20-2013
3.00
Elevator end caps
Details
       

 07-19-2013
3.00
Vertical Stab Top Cap
Details
       

 06-29-2013
1.00
Rudder Caps on!
Details
       

 06-29-2013
4.00
Installing the bottom and top rudder caps
Details
       

 06-24-2013
3.00
Routing and connecting the tail light wires
Details
       

 06-23-2013
3.00
Riveting the aft fuselage skins
Details
       

 06-17-2013
3.00
Tail light mounting
Details
       

 06-15-2013
3.00
Fabricating/mounting the tail light mounting brack
Details
       

 06-14-2013
4.00
Fitting the rudder bottom cap
Details
       

 05-25-2013
2.00
Moving N260KM from the Van Cave to our T-hangar
Details
       

 04-25-2013
0.00
N260KM checks into the Van Cave
Details
       

 04-13-2013
7.00
Prepping the project to ship to Texas
Details
       

 03-16-2013
1.00
Testing the landind and taxi lights
Details
       

 03-16-2013
5.00
Attaching the wings -- initial attachment
Details
       

 02-28-2013
8.00
Cleaning up the wiring, part 3
Details
       

 02-27-2013
8.00
Cleaning up the wiring, part 2
Details
       

 02-27-2013
5.00
Cleaning up the wiring, part 1
Details
       

 02-21-2013
2.00
Reinforcing the cockpit arm rests, part 2
Details
       

 02-19-2013
3.00
Reinforcing the cockpit arm rests, part 1
Details
       

 02-18-2013
3.00
Transponder antennae
Details
       

 01-24-2013
2.00
Headphone jack brackets part 2
Details
       

 01-21-2013
3.00
Headphone jack brackets part 1
Details
       

 01-20-2013
3.00
Installing the seat cushion wiring
Details
       

 12-03-2012
3.00
Wing root electrical connections
Details
       

 12-01-2012
3.00
VHF antenna: Fuselage holes, doubler plates
Details
       

 12-01-2012
3.00
Cockpit eyeball lights, part 2
Details
     

 12-01-2012
3.00
Cockpit eyeball lights, part 1
Details
       

 11-17-2012
2.00
Ethernet pass-through for the avionics sub-panel
Details
       

 11-14-2012
3.00
Fabricate/Install fuel tank attach brackets
Details
       

 10-23-2012
2.00
Elevator push tubes and control column part 2
Details
       

 10-22-2012
3.00
Installed first major firewall electrical pass-thr
Details
       

 10-14-2012
3.00
Elevator push tubes and control column
Details
       

 09-23-2012
4.00
Installing the Roll Trim servo
Details
       

 09-15-2012
4.00
Wiring the terminal blocks
Details
       

 09-09-2012
0.50
RV-7 Yoga
Details
       

 09-02-2012
4.00
Cockpit relay terminals
Details
       

 08-24-2012
4.00
Firewall-mounted ground block
Details
       

 08-23-2012
3.00
Hooked up the two Skyview EFIS displays, installed
Details
       

 08-19-2012
3.00
First look at the wiring harness
Details
       

 08-09-2012
2.00
Panel build-up (continued)
Details
       

 08-08-2012
2.00
Installed the pilot/copilot air vent scoops
Details
       

 08-07-2012
0.10
Snoopy patrols the shop
Details
       

 08-07-2012
0.10
Looking like an airplane...?
Details
       

 08-07-2012
1.00
Installing VHF slave, Skyview back-up batteries
Details
       

 08-07-2012
2.00
Installing the VP-X Vertical Power electrical cont
Details
       

 08-06-2012
2.00
Installing the Skyview Transponder Module
Details
       

 08-06-2012
3.00
Installing Skyview EMS module
Details
       

 08-04-2012
2.00
Installing the heat vent valve part 2
Details
       

 08-04-2012
2.00
Installing the battery box and battery
Details
       

 07-31-2012
2.00
Installing the heat vent valve part 1
Details
       

 07-31-2012
2.00
Installing the engine sensor manifold
Details
       

 07-30-2012
2.00
More firewall platenuts...adel clamp mounts
Details
       

 07-29-2012
2.00
Drilling/installing starter and master solenoids t
Details
       

 07-28-2012
3.00
Building the battery box
Details
       

 07-26-2012
2.00
Installing the backing angle to the new panel
Details
       

 07-23-2012
2.00
Nose wheel fairing mounting plates
Details
       

 07-23-2012
0.10
Givin' the shop dog a bone
Details
       

 07-18-2012
3.00
Fabricating/installing the wheel brake lines
Details
       

 07-18-2012
3.00
Building, installing nose gear assemblies
Details
       

 07-15-2012
2.00
Mounting wheels
Details
       

 07-15-2012
0.10
I have the absolute BEST copilot!
Details
       

 07-15-2012
2.00
Assembling the wheel/tire assemblies
Details
       

 07-14-2012
3.00
Modifying the tire fairing mounts
Details
       

 07-14-2012
3.00
Attaching the wheel brake mounts, tire fairing mou
Details
       

 07-12-2012
2.00
Main axle initial assembly
Details
       

 07-12-2012
2.00
Installing the gear strut mounting bolts
       

 07-11-2012
2.00
Installing the nose gear strut
Details
       

 07-11-2012
2.00
Installing the gear struts
Details
       

 07-09-2012
2.00
Installing the Engine Mount
Details
       

 07-07-2012
0.10
Snoopy the Shop Dog ROCKS!
Details
       

 07-07-2012
3.00
Installing the rear window
Details
       

 07-07-2012
2.00
Canopy locking mechanisms
Details
       

 07-01-2012
4.00
Final prep on rear window
Details
       

 06-24-2012
4.00
Riveting Top Fuselage Skin in place
Details
       

 06-23-2012
2.00
Canopy Gas Struts install
Details
       

 06-16-2012
2.00
Roll bar final prep
Details
       

 06-01-2012
2.00
Canopy Side Skirts
Details
       

 05-28-2012
3.00
Sikaflex-gluing the canopy to the frame...prep wor
Details
       

 05-28-2012
3.00
Sika-Flexing the plexi to the canopy frame...part
Details
       

 05-28-2012
2.00
Applying the Sikaflex primer to the canopy, fra
Details
       

 05-27-2012
3.00
Canopy Side mount hardware & side skirts
Details
       

 05-25-2012
3.00
Canopy Frame stiffeners (part 2)
Details
       

 05-21-2012
3.00
Setting the edge bend on the Canopy Frame Stiffene
Details
       

 05-05-2012
3.00
THE BIG CUT!!!!
Details
       

 05-02-2012
4.00
Canopy frame riveting
Details
       

 05-01-2012
2.00
Drawing the "Big Cut" line dividing fore/aft canop
Details
       

 04-30-2012
3.00
Trimming/fitting the canopy to the frame
Details
       

 04-15-2012
3.00
Initial trim on the canopy
Details
       

 04-13-2012
3.00
Canopy frame side rails
Details
       

 04-12-2012
2.00
Mounted rear canopy frame
Details
       

 04-11-2012
0.10
My Prop Came In!!
Details
     

 04-07-2012
3.00
Pre-drilling avionics mounts, building up panel su
Details
       

 04-07-2012
2.00
Mounting shelf for the Vertical Power Pro unit
Details
     

 04-01-2012
2.00
Autopilot Pitch Servo installed
Details
     

 04-01-2012
3.00
ADAHRS shelf mounting, plumbing
Details
       

 03-26-2012
2.00
Mounting SkyView ADAHRS units to the shelf
Details
       

 03-24-2012
2.00
Mounted Dynon Outside Air Temp (OAT) probes in tai
Details
       

 03-24-2012
3.00
Installing ELT, ELT antenna, cable
Details
       

 03-23-2012
2.00
Building/installing ELT shelf
Details
       

 02-19-2012
2.00
Ran the static plumbing and shoulder harness cable
Details
       

 02-18-2012
1.00
Tested the anti-collision beacon
Details
     

 02-18-2012
3.00
Installed the Static system ports
Details
       

 02-18-2012
3.00
Autopilot pitch channel: Bracket, wiring
Details
       

 02-08-2012
3.00
Panel construction, Stark Aviation
Details
       

 02-01-2012
4.00
Fabricating the Skyview ADAHRS shelf
Details
       

 01-28-2012
2.00
Running wires for the fuselage/tail lights, elev t
Details
       

 01-25-2012
2.00
Riveting the anti-collision mount stiffiners to th
Details
       

 01-23-2012
3.00
Beacon fuselage mount stiffiners
Details
       

 01-19-2012
2.00
Side and Rear canopy frame brackets
Details
       

 01-16-2012
2.00
Riveting the forward frame spars
Details
       

 01-16-2012
2.00
Drilling the canopy frame hinge brackets
Details
       

 01-15-2012
4.00
Canopy frame forward skin alignment problems
Details
       

 01-15-2012
2.00
Canopy frame forward bracket
Details
       

 01-14-2012
1.00
Canopy Frame forward skin
Details
       

 01-10-2012
1.00
Canopy Frame Hinge Bracket pins
Details
       

 01-08-2012
1.00
Forward canopy frame, initial skin alignment
Details
       

 01-08-2012
2.00
Cockpit lock handle primed, riveted into place
Details
       

 01-08-2012
2.00
Aft Canopy locking mechanisms, part 1
Details
       

 01-07-2012
2.00
Fabricated and installed canopy lock/release hardw
Details
       

 01-07-2012
2.00
Cutting/drilling canopy lock handle mounts
Details
       

 01-05-2012
2.00
Wire runs for the fuselage
Details
       

 01-05-2012
2.00
Canopy disconnect assembly
Details
       

 01-02-2012
2.00
Testing the canopy hinge bracket release
Details
       

 01-01-2012
2.00
Canopy hinge mounting blocks
Details
       

 12-26-2011
3.00
Main Instrument Panel, air vents
Details
       

 12-25-2011
2.00
Positioning mounting brackets for the sub-panel
Details
       

 12-25-2011
2.00
Match-drilling the skins to the sub-panel ribs and
Details
       

 12-24-2011
3.00
Side sub-panel assembly
Details
       

 12-24-2011
3.00
Fitting the sub-panels to the cockpit area
Details
       

 12-23-2011
2.00
Panel component fabrication, part 3
Details
       

 12-23-2011
3.00
Center Sub-panel assembly, part 2
Details
       

 12-23-2011
2.00
Center Sub-panel assembly, part 1
Details
       

 12-22-2011
2.00
Riveting the stiffiner to the instrument panel
Details
       

 12-22-2011
3.00
Panel component fabrication, part 2
Details
       

 12-20-2011
3.00
Panel component fabrication, part 1
Details
       

 12-19-2011
2.00
Roll Bar top brace/channel
Details
       

 12-19-2011
2.00
Final-drilling the roll bar mounting brackets
Details
       

 12-17-2011
3.00
Finished/primed, assembled/rivited the roll bar
Details
       

 12-17-2011
2.00
Assembling/mounting the roll bar mount brackets
Details
       

 12-11-2011
2.00
Drilling/fitting the roll channel halves' joining
Details
       

 12-11-2011
3.00
Assembling, drilling the roll bar
Details
       

 12-10-2011
3.00
Fabricating the angles
Details
       

 12-04-2011
2.00
Installing the rudder pedal assembly
Details
       

 12-04-2011
1.00
Finished. Also, had help from neighbor's friend
Details
       

 12-01-2011
3.00
Inventorying the Finishing Kit
Details
     

 11-28-2011
4.00
Rebuilding and painting the brake pedals
Details
       

 11-26-2011
3.00
Mounting and fitting the rudder
Details
       

 11-25-2011
2.00
Rear tie-down block, vert stabilizer (part 2)
Details
       

 11-25-2011
2.00
Rear tie-down block, vert stabilizer
Details
       

 11-25-2011
1.00
Attaching the elevator horn up block
Details
     

 11-23-2011
2.00
Riveted the front attach plate to the forward spar
Details
       

 11-22-2011
3.00
Fine-tuning the Vertical Stab, and DRILLING THE HO
Details
       

 11-21-2011
2.00
Mounting the vertical stab
Details
       

 11-21-2011
3.00
Assembled and plumbed the fuel pump and filter
Details
       

 11-20-2011
2.00
Installing platenuts for the fuel pump floor mount
Details
       

 11-20-2011
2.00
Final assembly: Fuel Pump cover doghouse
Details
       

 11-19-2011
2.00
Building the fuel pump cover and floor mounts
Details
       

 11-19-2011
1.00
Adjusting the forward elevator stop block
Details
       

 11-15-2011
1.00
Installed the elevator bellcrank, connected aft pu
Details
       

 11-15-2011
2.00
Front elevator push rod
Details
       

 11-15-2011
1.00
Adjusting the aft elevator pushrod
Details
       

 11-14-2011
2.00
Finished the rear elevator push rod
Details
       

 11-13-2011
2.00
Elevator push rod (rear half)
Details
       

 11-09-2011
3.00
Building/installing the parking brake
Details
       

 11-06-2011
2.00
Setting the horizontal Stab's angle of incidence
Details
       

 11-05-2011
2.00
Fabricating shims, mounting/aligning the horiz sta
Details
       

 11-05-2011
2.00
Drilling forward stab, installing shims
Details
       

 11-03-2011
2.00
Match-drilling the elevator horns
Details
       

 10-30-2011
2.00
Mounting the elevator to align the control horns
Details
       

 10-09-2011
4.00
Fuel Vent lines
Details
       

 10-06-2011
0.00
Shop Dogs!
       

 10-06-2011
4.00
Constructing/mounting cockpit fuel lines
Details
       

 10-02-2011
2.00
Installing brake fluid reservoir and fuel tank sel
Details
       

 10-01-2011
3.00
Drilling gear holes, aligning the weldments
Details
       

 10-01-2011
2.00
Drilling and bolting the weldment side mounts
Details
       

 09-30-2011
3.00
Mounting the flap motor
Details
       

 09-30-2011
2.00
Center Brace, side covers
Details
       

 09-26-2011
3.00
Platenuts on the flap actuator channel
Details
       

 09-26-2011
2.00
Flap Actuator Channel, top mounting plate
Details
       

 09-23-2011
3.00
Fabricating parts for the flap actuator assemblies
Details
       

 09-21-2011
1.00
Seat Back final assembly, finished
Details
       

 09-21-2011
3.00
Mounting the flap actuator assembly to the 705 bul
Details
       

 09-21-2011
1.00
Drilling the flap actuator arm safety wire hole
Details
       

 09-21-2011
3.00
Assembling, riveting the seat back braces
Details
       

 09-20-2011
2.00
Fitting the Cockpit Heater baffle to front cockpit
Details
       

 09-19-2011
2.00
Riveting the heater baffle assembly and platenuts
Details
       

 09-18-2011
3.00
Priming and riveting the seat backs
Details
       

 09-18-2011
3.00
Cockpit heat baffle drilling, assembly
Details
       

 09-10-2011
3.00
Assembling the seat back pieces
Details
       

 09-07-2011
3.00
Seat backs--marking and match-drilling the forward
Details
       

 09-05-2011
1.00
Pop-Riveting the cargo floors and cockpit seat flo
Details
     

 09-05-2011
2.00
Assemble mid-cockpit tunnel cover
Details
       

 09-01-2011
3.00
Seatbelt cable wear plates/blocks for aft cargo wa
Details
       

 08-31-2011
3.00
Installing the Cargo Compartment floors
Details
       

 08-30-2011
2.00
Rivet the aircrew steps to the fuselage sides
Details
       

 08-30-2011
1.00
Anchoring the steps to the fuselage ribs
Details
       

 08-04-2011
3.00
Installing cockpit steps part 1
Details
       

 08-03-2011
1.00
Top Forward Skin GOOF!
Details
       

 08-03-2011
3.00
Fitting the top forward skin
Details
       

 08-03-2011
1.00
Constructing the elevator bellcrank
Details
       

 07-31-2011
3.00
Mid-fuselage bulkhead gusset part 2
Details
       

 07-31-2011
2.00
Mid-fuselage bulkhead gusset part 1
Details
       

 07-30-2011
2.00
Rudder/brake pedals, final assembly
Details
       

 07-30-2011
3.00
Mounting, drilling adjustment holes for the rudder
Details
       

 07-30-2011
2.00
Assembling the rudder/brake pedals
Details
       

 07-24-2011
4.00
Fabricating and prepping the rudder/brake pedals
Details
       

 07-23-2011
2.00
Fabricating the fuselage/fuel tank attachment shim
Details
       

 07-16-2011
2.00
Fuselage Rotisserie--tail support
Details
       

 07-16-2011
3.00
Fuselage Rotisserie
Details
       

 07-16-2011
2.00
Drilling the main landing gear holes
Details
       

 07-16-2011
2.00
Crew step holes
Details
       

 07-10-2011
2.00
modifying the cockpit floor ribs
Details
       

 07-10-2011
2.00
Installing cockpit floor nutplates
Details
       

 07-10-2011
2.00
Firewall-mounted fuel boost pump stiffener
Details
       

 07-10-2011
2.00
Fabricating the rudder stops
Details
       

 07-09-2011
2.00
Fab work on cross-cockpit channel trim, part 4
Details
       

 07-06-2011
2.00
Fab work on cross-cockpit channel trim, part 3
Details
       

 07-06-2011
2.00
Fab work on cross-cockpit channel trim, part 2
Details
       

 07-05-2011
1.00
Fab work on cross-cockpit channel trim
Details
       

 07-04-2011
3.00
Central stick linkage, cockpit floors
Details
       

 07-03-2011
1.00
Snap bushings
Details
       

 07-03-2011
2.00
Prepping the firewall recess
Details
       

 07-03-2011
2.00
Drilling the firewall pass-through holes
Details
       

 07-01-2011
2.00
Moving wings back to storage
Details
       

 07-01-2011
2.00
Hauling in the QB fuselage
Details
       

 06-27-2011
1.00
Wings are done!
Details
       

 06-26-2011
1.00
Right wing bottom skin, part 2
Details
       

 06-26-2011
4.00
Right wing bottom skin
Details
       

 06-26-2011
2.00
Re-mounting the ailerons after riveting the lower
Details
       

 06-18-2011
4.00
Left Wing, bottom skin, part 2
Details
       

 06-12-2011
4.00
Left Wing, bottom skin, part 1
Details
       

 06-12-2011
2.00
Cutting, drilling skin access for pitot tube
Details
       

 06-01-2011
1.00
EAA Tech Inspection #1
Details
       

 05-30-2011
1.00
Lower skins primed
Details
     

 05-30-2011
2.00
Access panel plate-nuts
Details
       

 05-29-2011
2.00
Prepping the lower outer skin access panels
Details
       

 05-28-2011
2.00
Dimpling wings, prep for lower skins
Details
       

 05-28-2011
2.00
Bottom skin edge prep, dimpling
Details
       

 05-27-2011
1.00
Bevelling the wing bottom skins' edges
Details
       

 05-26-2011
2.00
Autopilot roll servo harness part 4
Details
       

 05-26-2011
2.00
Autopilot roll servo harness part 3
Details
       

 05-21-2011
2.00
Autopilot roll servo harness part 2
Details
       

 05-21-2011
2.00
Autopilot roll servo harness part 1
Details
       

 05-15-2011
3.00
Wingtip light trim, lens
Details
       

 05-13-2011
3.00
Wingtip lighting #3
Details
       

 05-07-2011
2.00
Wingtip lighting #2
Details
       

 05-07-2011
1.00
Running Stall Warner wiring
Details
       

 05-05-2011
1.00
Autopilot roll servo, right wing #2
Details
       

 05-05-2011
2.00
Autopilot roll servo, right wing #1
Details
       

 05-04-2011
2.00
Wingtip lighting #1
Details
       

 04-16-2011
2.00
Wing conduit, wires
Details
       

 04-09-2011
3.00
Running wing conduit
Details
       

 03-24-2011
1.00
Light plate installed....finished!
Details
     

 03-23-2011
1.00
Landing light bulb mount plate, power supply
Details
     

 03-23-2011
2.00
Installing the lense cover
Details
       

 03-23-2011
2.00
Finished mounting the lens cover
Details
       

 03-22-2011
2.00
Mounting screw plates for the landing light mount
Details
       

 03-22-2011
1.00
Match-drilling the lense cover mount strips
Details
     

 03-20-2011
2.00
Marked and cut the left wing's landing light hole
Details
       

 03-17-2011
1.00
Final assembly of the wing-mounted portion
Details
       

 03-17-2011
2.00
Assembling the system's electronic component
Details
       

 03-16-2011
2.00
Finishing the leading edge holes, priming
Details
       

 03-16-2011
2.00
Drilling out leading edge holes, mounting access p
Details
       

 03-15-2011
3.00
Sealing the fuel tanks
Details
       

 03-15-2011
2.00
Began installing the stall warning system in left
Details
       

 03-13-2011
2.00
Torquing the tank mount bolts, and prepping the ta
Details
       

 03-13-2011
2.00
Assembling the fuel feed hardware to the tank acce
Details
       

 03-12-2011
2.00
Mounting the pitot tube bracket (initial metal wor
Details
       

 03-12-2011
3.00
Mounting and aligning the ailerons
Details
       

 03-08-2011
2.00
dimpling and installing the aileron gap fairing, t
Details
       

 03-07-2011
1.00
Installing the flap hardware
Details
       

 03-06-2011
2.00
Installing the aileron's end brackets
Details
       

 03-06-2011
3.00
Installing flap piano hinges
Details
       

 03-06-2011
3.00
Aileron gap fairings & flap braces, part 3
Details
       

 03-05-2011
2.00
Aileron gap fairings & flap brace, part 2
Details
       

 03-05-2011
3.00
Aileron gap fairings & flap brace, part 1
Details
       

 03-03-2011
2.00
Installing the aileron brackets
Details
       

 03-02-2011
2.00
Riveting the aileron brackets
Details
       

 03-02-2011
3.00
Building the aileron brackets
Details
       

 02-28-2011
2.00
Rigging the aileron bellcrank
Details
       

 02-26-2011
3.00
Building the aileron tie rods
Details
       

 02-21-2011
2.00
Trimming horizontal stab spar to clear elevator ho
Details
       

 02-21-2011
2.00
Trimming horizontal stab end skins to clear the el
Details
       

 02-21-2011
0.10
Tail feathers are done!
Details
     

 02-21-2011
1.00
Drilling the elevator horns for the center bearing
Details
       

 02-20-2011
2.00
Rolling the elevators' leading edges
Details
       

 02-20-2011
1.00
Installing the elevator bearing eye bolts
Details
     

 02-19-2011
2.00
Stiffeners for the new left elevator
Details
       

 02-19-2011
3.00
Riveting left elevator skin to skeleton
Details
       

 02-19-2011
1.00
Installing the electric trim servo
Details
       

 02-19-2011
2.00
Finishing the trim tab install
Details
       

 02-19-2011
3.00
Elevator trim tab
Details
       

 02-09-2011
2.00
Elevator Trim Tab partial assembly
Details
       

 02-08-2011
2.00
Trim Tab assembly
Details
       

 02-08-2011
2.00
Left elevator--riveting the skeleton, Part 1
Details
       

 02-08-2011
2.00
Left elevator--riveting the skeleton Part 2
Details
       

 02-07-2011
2.00
Left Elev: ribs for elevator trim slot
Details
       

 02-07-2011
2.00
Elev Trim servo mount
Details
       

 02-06-2011
2.00
Left Elevator: Skin fold for trim tab...FAIL
Details
       

 02-05-2011
2.00
Left elevator: Match drill and dimple the skeleton
Details
       

 02-05-2011
2.00
Left elevator skeleton
Details
       

 02-02-2011
2.00
Riveting right elevator skeleton
Details
       

 02-02-2011
2.00
Right Elevator: riveted elevator horn and skin to
Details
       

 01-30-2011
2.00
Skeleton assembly continued
Details
       

 01-30-2011
2.00
Riveting stiffeners to elevator skins
Details
       

 01-30-2011
1.00
Riveting elevator trim access panel to skin
Details
       

 01-30-2011
1.00
Bending the elevators' skin trailing edges
Details
       

 01-30-2011
2.00
Assembling right elevator skeleton
Details
       

 01-22-2011
1.00
Elevator trim access panel
Details
       

 01-22-2011
3.00
Dimpling and priming stiffeners and skins
Details
       

 01-20-2011
2.00
Rolling the leading edge
Details
       

 01-20-2011
2.00
Riveting the rudder trailing edge
Details
       

 01-20-2011
1.00
Rivet the leading edge
Details
       

 01-19-2011
2.00
Sand and shape the stiffeners
Details
       

 01-19-2011
2.00
Elevator Skin Stiffeners
Details
       

 01-16-2011
2.00
ProSealing the trailing edge
Details
       

 01-15-2011
3.00
Riveting the skins to the skeleton
Details
       

 01-15-2011
2.00
Riveting the rudder skeleton pieces to spar
Details
       

 01-15-2011
1.00
Riveting reinforcement plates and nut plates to sp
       

 01-15-2011
1.00
Prepping the trailing edge
Details
       

 01-15-2011
2.00
Finishing the rudder horn assembly
Details
       

 01-14-2011
3.00
Acid wash and Prime
Details
       

 01-12-2011
1.00
Rudder counter-weight rib
Details
       

 01-12-2011
3.00
Dimpling and deburring
Details
       

 01-11-2011
2.00
Match-drilling the rudder horn cover
Details
       

 01-11-2011
2.00
Fabricating the bottom cap mounting strip
Details
       

 01-09-2011
1.00
upper skeleton
Details
       

 01-09-2011
2.00
Drilling and attaching skins
Details
       

 01-09-2011
2.00
Back-riveting the stiffiners to the rudder skins (
Details
       

 01-09-2011
1.00
Back-riveting the stiffiners to the rudder skins
Details
       

 01-09-2011
2.00
Assembling the lower rudder skeleton
Details
       

 01-08-2011
1.00
Priming the stiffiners and skins
Details
       

 01-08-2011
2.00
Dimpling the rudder stiffiners and skins
Details
       

 01-08-2011
4.00
Deburring the rudder skin and stiffiner holes
Details
       

 01-05-2011
2.00
Stiffiners, final length check, cleco to skins
Details
       

 01-04-2011
2.00
Trimming the stiffiners
Details
       

 01-01-2011
9.00
Quick-build Wings and Fuselage arrive!
Details
       

 12-12-2010
2.00
Riveting the aft spar into the vert stab
Details
       

 12-12-2010
1.00
Riveting skins to forward spar and skeleton
Details
       

 12-12-2010
4.00
Riveting aft spar to spar doubler
Details
       

 12-12-2010
1.00
Finishing the aft spar
Details
       

 12-12-2010
1.00
Final 3 rivets....done!
Details
       

 12-12-2010
1.00
Cleco the skins to forward skeleton
Details
       

 12-12-2010
1.00
assembling the skeleton to forward spar
Details
       

 12-05-2010
3.00
Acid Wash and Prime
Details
       

 12-02-2010
3.00
Dimpling the ribs, spars, skins
Details
       

 12-02-2010
1.00
Dimpling and countersinking the rear spar and doub
Details
       

 11-30-2010
1.00
Hanging the skin and drilling
Details
       

 11-30-2010
4.00
finishing the skeleton
Details
       

 11-30-2010
1.00
Debur and start dimpling
Details
       

 11-29-2010
2.00
Rear spar, doubler, and rudder hinge mounts
Details
       

 11-29-2010
1.00
building the spar/rib skeleton
Details
       

 11-28-2010
2.00
still skinning
Details
       

 11-27-2010
1.00
Riveting the skins to the forward spar
Details
       

 11-27-2010
1.00
Riveting the skins
Details
       

 11-27-2010
7.00
Riveting ribs to the skin
Details
       

 11-27-2010
1.00
Rivet the horiz stab end ribs
Details
       

 11-26-2010
1.00
rivet the horizontal stab aft spar
Details
       

 11-26-2010
1.00
rivet elevator bearing mounts to the rear spar
Details
       

 11-26-2010
4.00
Rebuilding rear spar
Details
       

 11-26-2010
1.00
Reassemble horizontal stab front spar
Details
       

 11-26-2010
1.00
hanging the ribs
Details
       

 11-23-2010
2.00
Horiz Stab: Acid wash prep for prime
Details
       

 11-23-2010
2.00
Horiz Stab skin edge prep
Details
       

 11-22-2010
2.00
Dimpling Horiz Stab skins part deux
Details
       

 11-22-2010
3.00
Building the DRDT-2 cradle platform
Details
       

 11-21-2010
2.00
Dimpling the Horiz Stab Skin, part one
Details
       

 11-21-2010
2.00
Debur, Dimple Horiz Stab skeleton
Details
       

 11-12-2010
1.00
Problem with Horiz Stab front spar
Details
       

 11-11-2010
1.00
The big 4-thick drill!
Details
       

 11-11-2010
1.00
horiz. stab skins
Details
       

 11-11-2010
1.00
Horiz Stab--Disassembly and final front spar holes
Details
     

 11-11-2010
1.00
horiz stab inboard ribs placement
Details
       

 11-11-2010
1.00
drilling & attaching the horiz stab skins to the i
Details
       

 11-11-2010
6.00
Assembling the horiz stab skeleton
Details
       

 11-09-2010
1.00
Prepping the horiz stab ribs
Details
       

 11-09-2010
1.50
Predrilling horiz stab inboard ribs
Details
       

 11-09-2010
1.00
Notching the fwd inboard horiz stab ribs
Details
       

 11-09-2010
1.00
Horizontal stab
Details
     

 11-09-2010
1.00
Finishing horiz stab front spar
Details
       

 11-08-2010
1.00
Tapering the Hor Stab front spar angle pieces' end
Details
       

 11-08-2010
1.00
Rounding, tapering the Horiz Stab front spar angle
Details
       

 11-08-2010
1.00
Hor. Stab front spar/angle pieces
Details
       

 11-08-2010
3.00
Front spar channels
Details
       

 11-08-2010
2.00
Finishing elev bearing assembly
Details
       

 11-08-2010
1.00
Drawing the template for Horiz Stab front spar ang
Details
     

 11-07-2010
2.00
Work has officially begun!
Details
       

 11-07-2010
2.00
Positioning & match-drilling the elevator hinge br
Details
       

 11-07-2010
2.00
Match-drill elevator rear spars to spar channel
Details
       

 11-07-2010
2.00
Elevator bearing bracket assembly, priming
Details
       

 10-30-2010
2.00
Tools!
Details
       

 10-26-2010
1.00
Air Supply part deux
       

 10-25-2010
0.00
The kit
Details
     

 10-25-2010
2.00
Sorting the bits and pieces
Details
       

 10-25-2010
6.00
Shop setup
Details
       

 10-25-2010
2.00
Empennage Delivered!
Details
       

 10-25-2010
6.00
Air supply, Benches, back rivet plate
Details
       

 06-25-2010
0.00
Visiting the Mothership!
Details
       

 06-25-2010
0.00
Demo Flight at the Van's Factory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.