Date
|
Hours
|
Work Log Summary
|
Details
|
11-01-2019
|
0.01
|
FAA DAR Inspection.
|
Details
|
|
|
10-23-2019
|
1.50
|
Fueled airplane and calibrated the fuel tank, EFIS
|
Details
|
|
|
10-21-2019
|
3.00
|
Worked on radio. Calibrate eletronic fuel sender.
|
Details
|
|
|
10-18-2019
|
4.00
|
Working on Radio and wires.
|
Details
|
|
|
10-17-2019
|
2.00
|
Applied required lables to the instrument panel.
|
Details
|
|
|
10-16-2019
|
1.00
|
Completed the Weight and Balance.
|
Details
|
|
|
10-11-2019
|
5.00
|
Wired the landing lights, position lights, radio.
|
Details
|
|
|
10-10-2019
|
4.00
|
Installed the aft bottom skin.
|
Details
|
|
|
10-09-2019
|
4.00
|
Rigged ail.erons and flaps
|
Details
|
|
|
10-08-2019
|
1.50
|
Clean my Sonex
|
Details
|
|
|
10-07-2019
|
3.00
|
Rear luggage turtle-deck panel. installed position
|
Details
|
|
|
10-04-2019
|
3.00
|
Install flaps and ailerons.
|
Details
|
|
|
10-03-2019
|
5.00
|
Balance ailerons, rivet wing walk and continue wit
|
Details
|
|
|
10-02-2019
|
5.00
|
Final Assembly of several items.
|
Details
|
|
|
10-01-2019
|
4.00
|
Install the wings.
|
Details
|
|
|
09-30-2019
|
1.00
|
Transport the plane to the Goshen In airport
|
Details
|
|
|
09-28-2019
|
3.00
|
Numerous final assembly inspections and task.
|
Details
|
|
|
09-28-2019
|
0.01
|
Continued.
|
Details
|
|
|
09-28-2019
|
3.01
|
Continued
|
Details
|
|
|
09-27-2019
|
2.50
|
Installed gear fairing and wheel pants.
|
Details
|
|
|
09-26-2019
|
4.00
|
Finished working on the firewall forward wiring.
|
Details
|
|
|
09-25-2019
|
2.00
|
Connect EGT & CHT probes. Route wires.
|
Details
|
|
|
09-24-2019
|
3.50
|
Install oil presure switch and other electrical co
|
Details
|
|
|
09-23-2019
|
4.00
|
Finish the final installation of the windscreen an
|
Details
|
|
|
09-22-2019
|
4.00
|
Wet sanding and polishing the wheel pants and wing
|
Details
|
|
|
09-22-2019
|
1.00
|
Install the Communication radio antenna.
|
Details
|
|
|
09-21-2019
|
1.25
|
Install Radio in instrument panel.
|
Details
|
|
|
09-20-2019
|
2.00
|
Removed the front landing gear to install the whee
|
Details
|
|
|
09-19-2019
|
0.01
|
Finished up work on N416SX.
|
Details
|
|
|
09-18-2019
|
0.01
|
Worked on N416SX at Goshen airport.
|
Details
|
|
|
09-17-2019
|
3.00
|
More wet sanding.
|
Details
|
|
|
09-16-2019
|
3.00
|
Wet sanding.
|
Details
|
|
|
09-12-2019
|
2.00
|
Jake applies paint to Cowl, wheel pant, wing tips.
|
Details
|
|
|
09-11-2019
|
1.00
|
Prime Wheel pants, Wing tips, and Cowl.
|
Details
|
|
|
09-10-2019
|
2.00
|
Prep the cowl, wing tips, and wheel pants for pain
|
Details
|
|
|
09-09-2019
|
3.00
|
Prepping for paint.
|
Details
|
|
|
09-08-2019
|
1.00
|
Create a bracket and install aHalon fire extinguis
|
Details
|
|
|
09-04-2019
|
3.00
|
Sanding and prep of the cowl, wing tips and wheel
|
Details
|
|
|
09-03-2019
|
1.00
|
Install oil separator. also prep fiber glass piece
|
Details
|
|
|
08-30-2019
|
3.00
|
Fiberglass the cooling air exit vents into the bot
|
Details
|
|
|
08-29-2019
|
3.00
|
Fit the cowling vents. Sand and prep cowling wing
|
Details
|
|
|
08-23-2019
|
3.00
|
Cut cooling air vent opening in the bottom cowl.
|
|
|
|
08-22-2019
|
2.50
|
Split cowl with a horizontal cut.
|
Details
|
|
|
08-22-2019
|
1.50
|
Build the cooling air vents for cowling.
|
Details
|
|
|
08-19-2019
|
8.00
|
Cowling fuel door and latch.
|
Details
|
|
|
08-09-2019
|
0.01
|
Transport the wings to the hanger.
|
Details
|
|
|
07-31-2019
|
8.00
|
Polish wings with Nuvite grade C
|
Details
|
|
|
07-30-2019
|
7.00
|
A long day of Polishing the wings.
|
Details
|
|
|
07-29-2019
|
1.00
|
Modify the forward rib.
|
Details
|
|
|
07-28-2019
|
0.01
|
Oshkosh 2019
|
Details
|
|
|
06-28-2019
|
8.00
|
Work on cowling and final assembly of the windscre
|
Details
|
|
|
06-27-2019
|
9.00
|
Install the painted canopy frame and windscreen bo
|
Details
|
|
|
06-26-2019
|
0.50
|
Jeff installs the EXPERIMENTAL decal.
|
Details
|
|
|
06-26-2019
|
7.50
|
Initial fit of cowling.
|
Details
|
|
|
06-25-2019
|
1.50
|
After a couple of pics we start taking it apart.
|
Details
|
|
|
06-24-2019
|
5.25
|
Pulled the Canopy out of the box.
|
Details
|
|
|
06-24-2019
|
2.00
|
Finished installing the windscreen with clecoes.
|
Details
|
|
|
06-23-2019
|
4.00
|
Initial cut and final finish of the windscreen.
|
Details
|
|
|
06-14-2019
|
0.01
|
Load Sonex for trip to Jeff Logan's shop.
|
Details
|
|
|
06-02-2019
|
3.50
|
More polish on fuselage.
|
Details
|
|
|
05-29-2019
|
1.50
|
Another engine start to verify engine instruments.
|
Details
|
|
|
05-20-2019
|
1.75
|
Added a Ram mount for the Ipad mini on right instr
|
Details
|
|
|
05-15-2019
|
7.00
|
Polish fuselage.
|
Details
|
|
|
05-01-2019
|
2.25
|
Installed nut plates for the replacement coils.
|
Details
|
|
|
04-23-2019
|
1.00
|
Engine start.
|
Details
|
|
|
04-21-2019
|
1.50
|
Removed and cleaned spark plugs. Test run the engi
|
|
|
|
04-20-2019
|
1.25
|
Another engine start and run for about 30 seconds.
|
Details
|
|
|
04-19-2019
|
1.75
|
Performed the FAA required Fuel Flow test.
|
Details
|
|
|
04-09-2019
|
3.50
|
First engine start.
|
Details
|
|
|
04-04-2019
|
1.00
|
installed a light in the baggage area.
|
Details
|
|
|
04-02-2019
|
1.50
|
Adjusted the valves.
|
Details
|
|
|
03-18-2019
|
1.00
|
Installed the vent hose.
|
Details
|
|
|
03-14-2019
|
1.50
|
Installed position lights to the wingtips.
|
Details
|
|
|
03-13-2019
|
4.00
|
Installed an outside air tempature probe.
|
Details
|
|
|
03-13-2019
|
2.00
|
Installed a cockpit light.
|
Details
|
|
|
03-11-2019
|
2.50
|
Painted Nose wheel pant.
|
Details
|
|
|
03-07-2019
|
1.25
|
Replaced a broken landing light lens.
|
Details
|
|
|
03-07-2019
|
1.50
|
Opened up the leading edge inboard rib.
|
Details
|
|
|
03-06-2019
|
1.50
|
Sanded and primed main wheel pants.
|
Details
|
|
|
03-05-2019
|
3.50
|
Affixed a light weight fabric to the baggage compa
|
Details
|
|
|
03-04-2019
|
3.50
|
Made a back wall in the baggage compartment.
|
Details
|
|
|
03-02-2019
|
4.25
|
Cut out the fresh air vents.
|
Details
|
|
|
02-28-2019
|
1.75
|
Paint wing tips.
|
Details
|
|
|
02-27-2019
|
2.00
|
Installed a mount fior a tow bar on the nose gear.
|
Details
|
|
|
02-16-2019
|
3.00
|
Installed the windshield hoop.
|
Details
|
|
|
02-12-2019
|
3.50
|
Cut my Pattern for the gear leg fairings.
|
Details
|
|
|
02-07-2019
|
2.00
|
Sanded and Primed wingtips.
|
Details
|
|
|
02-07-2019
|
2.00
|
Bondo filler to smooth the edges of the pod to the
|
Details
|
|
|
02-04-2019
|
2.00
|
Bond position light pods to the wing tips.
|
Details
|
|
|
01-22-2019
|
1.50
|
Cut the Wingtip for the position light pods.
|
Details
|
|
|
01-21-2019
|
1.75
|
Prepared the position light pods and wing tips.
|
Details
|
|
|
01-09-2019
|
2.25
|
Prepared position lights.
|
Details
|
|
|
11-30-2018
|
0.01
|
3 month break after surgury.
|
Details
|
|
|
11-24-2018
|
1.25
|
Poster board cutout of gear leg fairing installed.
|
Details
|
|
|
11-23-2018
|
2.50
|
Cut Landing gear fairing from .025 sheet.
|
Details
|
|
|
11-20-2018
|
1.00
|
glazing compound to smooth out the seam of the whe
|
Details
|
|
|
11-16-2018
|
2.25
|
Install wheel pants.
|
Details
|
|
|
11-01-2018
|
2.00
|
Work on brakes.
|
Details
|
|
|
11-01-2018
|
2.25
|
Make wheel pants.
|
Details
|
|
|
10-11-2018
|
1.50
|
Install upholstery just for fun.
|
Details
|
|
|
08-24-2018
|
2.00
|
Fit the carb to the intake. make adjustments.
|
Details
|
|
|
08-23-2018
|
2.00
|
Install Exhaust springs to firewall.
|
Details
|
|
|
08-21-2018
|
3.00
|
Install ELT remote trigger.and test.
|
Details
|
|
|
08-20-2018
|
3.00
|
Install the ELT and the Antenna.
|
Details
|
|
|
06-05-2018
|
2.50
|
Installed the panel and panel cross support.
|
Details
|
|
|
06-04-2018
|
2.50
|
Bend and install the fuel tank vent tube.
|
Details
|
|
|
05-29-2018
|
1.00
|
Add fuel to the tank.
|
Details
|
|
|
05-28-2018
|
2.00
|
Fasten fuel tank straps. Install fuel fitting betw
|
Details
|
|
|
05-23-2018
|
2.50
|
Install the glareshield and fuel straps.
|
Details
|
|
|
04-27-2018
|
2.00
|
Cleaned and painted the new windshield bow.
|
Details
|
|
|
04-19-2018
|
1.50
|
Make the Canopy slide and lock.
|
Details
|
|
|
04-16-2018
|
2.00
|
Prepare windshield Bow.
|
Details
|
|
|
04-11-2018
|
2.00
|
Remove the Fuel tank 3/8 fitting. Install Oops fi
|
Details
|
|
|
04-10-2018
|
1.00
|
Removed all of the upper and lower panel.
|
Details
|
|
|
03-15-2018
|
5.00
|
Re-installed instruments and wiring.
|
Details
|
|
|
03-14-2018
|
1.25
|
Study the plans.
|
|
|
|
03-11-2018
|
1.00
|
Install the aluminum
|
Details
|
|
|
03-10-2018
|
0.25
|
Looking over the plans for the engine cowling.
|
Details
|
|
|
03-09-2018
|
2.50
|
Nose gear wheel pant.
|
Details
|
|
|
03-08-2018
|
1.00
|
Install gascolator again.
|
Details
|
|
|
03-07-2018
|
5.50
|
Instrument panel.
|
Details
|
|
|
02-19-2018
|
1.00
|
Shortened the fuel tank straps.
|
Details
|
|
|
02-18-2018
|
2.00
|
Josh Taylor fastens the glareshield, fuel straps a
|
Details
|
|
|
02-16-2018
|
2.25
|
Fuel tank pressure test.
|
Details
|
|
|
02-04-2018
|
2.50
|
Put together the braided fuel line and AN6 compres
|
Details
|
|
|
02-03-2018
|
1.00
|
Clecoed storage compartment into position.
|
Details
|
|
|
02-02-2018
|
3.50
|
Designed and built a storage compartment in the ba
|
Details
|
|
|
01-30-2018
|
4.00
|
Build a cover around the elevator Push Pull tube.
|
Details
|
|
|
01-23-2018
|
2.25
|
Install a shelf for the emergency transponder.
|
Details
|
|
|
01-18-2018
|
5.00
|
Work on various wiring of switches and breakers.
|
Details
|
|
|
01-15-2018
|
3.25
|
Install firewall pass-through
|
Details
|
|
|
01-14-2018
|
2.75
|
Prepare the fuel tank.
|
Details
|
|
|
01-12-2018
|
0.50
|
Cleaned fuel tank.
|
Details
|
|
|
01-11-2018
|
3.25
|
Install intake manifolds.
|
Details
|
|
|
01-09-2018
|
3.75
|
Fuel tank filler opening.
|
Details
|
|
|
01-02-2018
|
4.00
|
Installed the cable guide and brake cables.
|
Details
|
|
|
12-28-2017
|
3.00
|
Make fuselage interior panels.
|
Details
|
|
|
12-21-2017
|
2.25
|
Cut access holes in glareshield.
|
Details
|
|
|
12-17-2017
|
1.00
|
Finished painting and re-installed the panel compo
|
Details
|
|
|
12-16-2017
|
2.00
|
Remove panel switches, breakers, lights, EFIS, GPS
|
Details
|
|
|
12-05-2017
|
1.00
|
Solder the wires for the headset jacks.
|
Details
|
|
|
11-19-2017
|
6.50
|
Wiring, Crimping, Soldering.
|
Details
|
|
|
11-12-2017
|
5.50
|
Cutting and crimping terminals on wires for the in
|
Details
|
|
|
11-11-2017
|
1.00
|
Work on Panel. Other
|
Details
|
|
|
11-10-2017
|
4.00
|
Test fit the fuel tank and straps.
|
Details
|
|
|
11-09-2017
|
6.00
|
Installing the nose pant.
|
Details
|
|
|
11-08-2017
|
3.50
|
Remove engine. Make nose wheel pant.
|
Details
|
|
|
11-07-2017
|
4.00
|
Worked on AeroCarb.
|
Details
|
|
|
11-03-2017
|
2.00
|
Rocker arm push rods.
|
Details
|
|
|
11-02-2017
|
4.00
|
Rocker Arms
|
Details
|
|
|
10-29-2017
|
3.00
|
Installed Master Relay,and RDAC onto firewall.
|
Details
|
|
|
10-28-2017
|
2.25
|
Still working on Panel. Installed a 12 volt access
|
Details
|
|
|
10-27-2017
|
2.50
|
Still working on the Panel layout.
|
Details
|
|
|
10-25-2017
|
2.50
|
Still working on designing an Instrument panel.
|
Details
|
|
|
10-24-2017
|
2.50
|
Start on instrument panel.
|
Details
|
|
|
10-23-2017
|
2.25
|
Install Gascolator and fittings onto Firewall.
|
Details
|
|
|
10-06-2017
|
4.00
|
Installed the Throttle.
|
Details
|
|
|
10-04-2017
|
2.00
|
Installed Aerovee engine on airframe.
|
Details
|
|
|
09-27-2017
|
6.00
|
Installed studs in head.
|
Details
|
|
|
09-26-2017
|
6.00
|
Remove and clean oil screen and pump.
|
Details
|
|
|
09-25-2017
|
6.75
|
Install the new cylinders, pistons heads.
|
Details
|
|
|
09-21-2017
|
4.25
|
Prepare firewall.
|
Details
|
|
|
09-20-2017
|
5.50
|
Build and install battery box.
|
Details
|
|
|
09-18-2017
|
4.00
|
Prep and paint cylinders.
|
Details
|
|
|
09-13-2017
|
5.00
|
Removed the Left heads and cylinders.
|
Details
|
|
|
09-12-2017
|
3.00
|
Removed right cylinders, pistons, heads
|
Details
|
|
|
09-11-2017
|
3.00
|
Remove Right cylinder head and cylinder.
|
Details
|
|
|
08-24-2017
|
3.50
|
Check gear toe-in.
|
Details
|
|
|
08-24-2017
|
1.67
|
Bend battery box.
|
Details
|
|
|
08-23-2017
|
6.00
|
Paint and install nose gear.
|
Details
|
|
|
08-22-2017
|
6.00
|
Preparing and fitting nose gear assembly.
|
Details
|
|
|
08-21-2017
|
4.50
|
Prepare the front landing gear.
|
Details
|
|
|
08-21-2017
|
2.25
|
Install engine mount.
|
Details
|
|
|
08-17-2017
|
4.17
|
Install engine mount.
|
Details
|
|
|
08-16-2017
|
4.00
|
Fit the engine mount to the fuselage.
|
Details
|
|
|
08-15-2017
|
3.17
|
Test fit engine mount.
|
Details
|
|
|
08-14-2017
|
4.75
|
Installed drum brakes.
|
Details
|
|
|
08-11-2017
|
4.75
|
Toe-in and drill gear legs.
|
Details
|
|
|
08-10-2017
|
5.25
|
Re-make the steering rod boot.
|
Details
|
|
|
08-07-2017
|
4.00
|
Setting the main gear toe-in.
|
Details
|
|
|
08-04-2017
|
0.01
|
Setting the toe-in.
|
Details
|
|
|
07-12-2017
|
2.25
|
Positioning the landing gear axles.
|
Details
|
|
|
07-11-2017
|
2.50
|
Attached the elevator trim and cable.
|
Details
|
|
|
06-29-2017
|
5.00
|
Installed the tail horizontal tail tips.
|
Details
|
|
|
06-28-2017
|
5.75
|
Installed landing gear fuselage attachments.
|
Details
|
|
|
05-26-2017
|
3.75
|
Install Steering boot and elevator trim cable.
|
Details
|
|
|
05-25-2017
|
2.25
|
Remove broken bit and Drill gear leg .
|
Details
|
|
|
05-25-2017
|
1.50
|
Drill and fasten the elevator pushrod.
|
Details
|
|
|
05-17-2017
|
2.00
|
Drill hole in gear leg.
|
Details
|
|
|
05-15-2017
|
4.25
|
Installed the Aileron and Flaps controls
|
Details
|
|
|
05-14-2017
|
1.00
|
Attempt to drill drill landing gear leg.
|
Details
|
|
|
05-08-2017
|
2.25
|
Removed wings.
|
Details
|
|
|
05-06-2017
|
4.50
|
Installed the Control Stick.
|
Details
|
|
|
05-05-2017
|
4.00
|
Finished wing rigging
|
Details
|
|
|
04-24-2017
|
6.00
|
Working on forward lower fuselage.
|
Details
|
|
|
04-22-2017
|
4.25
|
Reinstall Spar tunnel.
|
Details
|
|
|
04-21-2017
|
2.50
|
Back drill aft fuselage attach angles.
|
Details
|
|
|
04-20-2017
|
4.50
|
Final up drill of wing attach blocks and angles.
|
Details
|
|
|
04-18-2017
|
3.75
|
Up drill spar blocks and angles.
|
Details
|
|
|
04-17-2017
|
5.00
|
Start rigging wing process.
|
Details
|
|
|
04-11-2017
|
3.50
|
Home from winter vacation.
|
Details
|
|
|
11-30-2016
|
1.25
|
Mounted engine on stand
|
Details
|
|
|
10-29-2016
|
0.01
|
Travel to pickup engine and propeller.
|
Details
|
|
|
10-18-2016
|
0.01
|
Prepare for the Engine.
|
Details
|
|
|
10-17-2016
|
4.00
|
Build cable adjusters. Install rudder cables.
|
Details
|
|
|
10-05-2016
|
1.00
|
Installed the rudder cables .
|
Details
|
|
|
10-04-2016
|
4.00
|
Finish drilling the attach Blocks.
|
Details
|
|
|
09-29-2016
|
6.00
|
Remove wings and drill out the forward fuselage an
|
Details
|
|
|
09-26-2016
|
1.00
|
Rigg, drill wing attach blocks, root and end attac
|
Details
|
|
|
09-24-2016
|
4.25
|
Make Steering Boot, Elevator pushrod.
|
Details
|
|
|
09-19-2016
|
3.00
|
Started the Heatbox.
|
Details
|
|
|
09-08-2016
|
3.25
|
Battery Box
|
Details
|
|
|
09-07-2016
|
5.25
|
Custom Instrument panel and extension below.
|
Details
|
|
|
09-01-2016
|
2.50
|
Build extension below the instrument panel.
|
Details
|
|
|
08-29-2016
|
2.00
|
Preparation to rigg wings.
|
Details
|
|
|
08-17-2016
|
1.00
|
Rivet aft tunnel.
|
Details
|
|
|
08-16-2016
|
1.50
|
Prepared wings for rigging.
|
Details
|
|
|
06-16-2016
|
4.50
|
Install fairlings and angles.
|
Details
|
|
|
06-14-2016
|
5.00
|
Install Vertical stabilizer.
|
Details
|
|
|
06-08-2016
|
0.75
|
Install tail skid
|
Details
|
|
|
12-24-2015
|
0.01
|
Clean shop.
|
Details
|
|
|
12-21-2015
|
2.00
|
Riveted the rear carrythrough assembly.
|
Details
|
|
|
12-16-2015
|
7.75
|
Rear spar carry through and wing rigging.
|
Details
|
|
|
12-10-2015
|
3.50
|
Rigging wings
|
Details
|
|
|
10-28-2015
|
1.00
|
Pin wings in fuselage.
|
Details
|
|
|
11-05-2014
|
1.00
|
Finished up the steering control boot.
|
Details
|
|
|
11-04-2014
|
3.00
|
Make Brake pulley link.
|
Details
|
|
|
11-04-2014
|
0.01
|
Building Pulley link.
|
Details
|
|
|
11-03-2014
|
1.25
|
Build Brake Cable guide
|
Details
|
|
|
10-30-2014
|
3.25
|
Gear Mounts and spacers.
|
Details
|
|
|
10-26-2014
|
1.50
|
Positioned Main gear legs and drilled.
|
Details
|
|
|
10-25-2014
|
1.75
|
Fabricate brake handle.
|
Details
|
|
|
10-20-2014
|
3.00
|
Drill firewall and make steering boot.
|
Details
|
|
|
10-19-2014
|
2.00
|
Cut an opening in the lower firewall.
|
Details
|
|
|
10-17-2014
|
1.00
|
Cut fiberglass for nose-gear steering linkage.
|
Details
|
|
|
10-15-2014
|
5.42
|
Glareshield, Panel, Crosstie, attach plates, clips
|
Details
|
|
|
10-14-2014
|
4.75
|
Fit glareshield, instrument panel, panel cross-tie
|
Details
|
|
|
10-13-2014
|
2.25
|
Fit the Glare-shield and located, drilled Fuel tan
|
Details
|
|
|
10-06-2014
|
2.75
|
Rudder cable adjuster fitting.
|
Details
|
|
|
10-05-2014
|
0.01
|
Review plans.
|
Details
|
|
|
11-03-2013
|
0.50
|
Position and drill Flap Handle.
|
Details
|
|
|
11-02-2013
|
1.00
|
Cut and clamp flap handle and cut flap position mo
|
Details
|
|
|
10-29-2013
|
1.75
|
Install lap Seat belts. Installed Idler and Elevat
|
Details
|
|
|
10-28-2013
|
2.25
|
Install rudder pivot blocks and pedals.
|
Details
|
|
|
09-23-2013
|
1.50
|
Build rudder pedal pivot blocks from Phenolic bloc
|
Details
|
|
|
09-22-2013
|
1.00
|
Build pushrod and cable adjusters.
|
Details
|
|
|
08-21-2013
|
4.00
|
Modify and cut instrument panel.
|
Details
|
|
|
08-20-2013
|
1.00
|
Modify and cut instrument panel.
|
Details
|
|
|
08-20-2013
|
2.00
|
Cut Glarshield.
|
Details
|
|
|
06-26-2013
|
1.00
|
Installed seat belts.
|
Details
|
|
|
06-26-2013
|
2.00
|
Build rear Spar carry through assembly.
|
Details
|
|
|
06-26-2013
|
4.00
|
Added an additional angle to the cabin side of the
|
Details
|
|
|
06-25-2013
|
6.50
|
Riveted the forward fuselage bottom skin.
|
Details
|
|
|
06-19-2013
|
2.00
|
Instrument panel cross tie and Fuel tank stop angl
|
Details
|
|
|
06-12-2013
|
3.00
|
Installed the flap drive pivot blocks and flap dri
|
Details
|
|
|
05-22-2013
|
2.25
|
Build dual control stick assembly.
|
Details
|
|
|
05-16-2013
|
2.50
|
Bend and install trim lever.
|
Details
|
|
|
05-09-2013
|
1.00
|
Bend Seat Pan.
|
Details
|
|
|
05-03-2013
|
2.50
|
Install nutplates for the hat cover.
|
Details
|
|
|
04-28-2013
|
2.25
|
Cut the Seat pan.
|
Details
|
|
|
04-11-2013
|
8.00
|
Updrill, deburr and rivet lower fuselage parts.
|
Details
|
|
|
04-09-2013
|
4.00
|
Pilot drill lower forward fuselage parts.
|
Details
|
|
|
03-23-2013
|
2.75
|
Seat Modification
|
Details
|
|
|
03-22-2013
|
2.00
|
Re-build parts for the lowered seat modification.
|
Details
|
|
|
03-20-2013
|
1.50
|
Start Seat Pan,
|
Details
|
|
|
01-06-2013
|
3.17
|
Rivet Firewall, forward tunnel and install motor m
|
Details
|
|
|
01-05-2013
|
2.50
|
Riveted the fwd fuselage to the aft fuselage and t
|
Details
|
|
|
12-22-2012
|
4.01
|
Clecoed all parts in F11.
|
Details
|
|
|
12-21-2012
|
6.00
|
Deburring and re-assembly of forward fuselage.
|
Details
|
|
|
12-20-2012
|
4.00
|
Deburr forward fuselage parts.
|
Details
|
|
|
12-19-2012
|
4.17
|
Updrill forward fuselage, tunnel zee. take apart.
|
Details
|
|
|
11-16-2012
|
3.50
|
Build various F10 pars from stock channel.
|
Details
|
|
|
11-14-2012
|
3.25
|
Build various F10 parts.
|
Details
|
|
|
11-12-2012
|
2.00
|
Build the idler assembly.
|
Details
|
|
|
11-08-2012
|
7.17
|
Contine forward fuselage.
|
Details
|
|
|
11-07-2012
|
6.75
|
Position and pilot drill Tunnel Zee.
|
Details
|
|
|
11-05-2012
|
1.50
|
Flip fuselage to work on Tunnel Zee.
|
Details
|
|
|
10-31-2012
|
7.50
|
Fit and drill forward fuselage sides, firewall and
|
Details
|
|
|
10-25-2012
|
2.00
|
Attach the forward and aft fuselage.
|
Details
|
|
|
10-20-2012
|
7.00
|
Remove clecos from Right forward fuselage, deburr
|
Details
|
|
|
10-19-2012
|
8.25
|
fit, pilot and updrill all left forward fuselage.
|
Details
|
|
|
09-27-2012
|
0.83
|
Updrill right forward fuselage.
|
Details
|
|
|
09-27-2012
|
1.17
|
Cutout hole in right upper longeron.
|
Details
|
|
|
09-09-2012
|
3.17
|
Pilot drilled Wing, Gear and Seatbelt attach angle
|
Details
|
|
|
08-28-2012
|
2.50
|
Fwd fuselage angles, R upper and lower engine moun
|
Details
|
|
|
06-21-2012
|
0.50
|
Complete Firewall attach angle assembly.
|
Details
|
|
|
05-23-2012
|
1.00
|
Drill forward side skin and cleco longeron.
|
Details
|
|
|
05-23-2012
|
3.00
|
Canapy latch strike plate. right fwd longersons.
|
Details
|
|
|
05-22-2012
|
0.01
|
New used microstop with 120 degree cutter.
|
Details
|
|
|
05-22-2012
|
2.00
|
Dimple and countersink aft tunnel assembly.
|
Details
|
|
|
05-17-2012
|
1.00
|
R & L Cowling attach hinge and angle assemblies.
|
Details
|
|
|
05-17-2012
|
1.00
|
Make the cockpit canapy latch strike plate.
|
Details
|
|
|
05-15-2012
|
1.75
|
Make several clips, firewall brackets.
|
Details
|
|
|
05-14-2012
|
0.92
|
Rudder pedal mount assembly.
|
Details
|
|
|
05-14-2012
|
3.00
|
Make several F14 parts.
|
Details
|
|
|
05-13-2012
|
3.45
|
Build F15 parts.
|
Details
|
|
|
05-12-2012
|
2.17
|
Aft web tunnell assembly.
|
Details
|
|
|
05-11-2012
|
2.50
|
Deburr and rivet upper firewall, box and strap.
|
Details
|
|
|
05-08-2012
|
3.00
|
Fit and drill the upper firewall.
|
Details
|
|
|
05-07-2012
|
2.00
|
Upper Firewall and filler box.
|
Details
|
|
|
05-05-2012
|
5.00
|
Make Aft tunnel web and Fwd tunnel zee.
|
Details
|
|
|
05-02-2012
|
2.00
|
Made clips and gussets from F17.
|
Details
|
|
|
04-28-2012
|
3.34
|
Riveted formers, turtledeck skin.
|
Details
|
|
|
04-27-2012
|
3.00
|
Installed turtledeck skin.
|
Details
|
|
|
04-25-2012
|
2.25
|
Rivet the tail cone assembly.
|
Details
|
|
|
04-24-2012
|
7.25
|
Final deburring and start re-assembly.
|
Details
|
|
|
04-23-2012
|
6.00
|
Finish drilling formers, clips and splice plates.
|
Details
|
|
|
04-19-2012
|
2.50
|
Position drill and cleco turtledeck formers.
|
Details
|
|
|
04-18-2012
|
3.00
|
Attach splice plates to #1 formers.
|
Details
|
|
|
04-17-2012
|
2.00
|
Position, pilot drill and cleco #1 former.
|
Details
|
|
|
04-16-2012
|
3.00
|
Pilot drill and cleco #5 former and install rear f
|
Details
|
|
|
04-15-2012
|
3.50
|
Position and pilot drill turtledeck to aft fuselag
|
Details
|
|
|
04-13-2012
|
3.17
|
Updrill, deburr and rivet Turtledeck.
|
Details
|
|
|
04-11-2012
|
2.25
|
Build the turtledeck splice assembly and attach cl
|
Details
|
|
|
04-08-2012
|
3.25
|
Flip aft fuselage to work on tail cone.
|
Details
|
|
|
04-04-2012
|
4.00
|
Aft Fuselage, Tail Cone
|
Details
|
|
|
02-24-2012
|
3.00
|
F20 parts for the turtledeck assembly.
|
Details
|
|
|
02-21-2012
|
1.00
|
Position, drill and cleco shoulder harness web bra
|
Details
|
|
|
02-18-2012
|
4.67
|
Pilot drill upper and lower cross ties. Aft shear
|
Details
|
|
|
02-15-2012
|
4.00
|
Continue to level and square aft fuselage.
|
Details
|
|
|
02-12-2012
|
2.00
|
Study plans and attach floor skin to aft fuselage
|
Details
|
|
|
02-11-2012
|
1.50
|
F22.
|
Details
|
|
|
02-10-2012
|
0.01
|
Lower my build table.
|
Details
|
|
|
02-09-2012
|
0.50
|
Starting to position and clamp fuselage parts toge
|
Details
|
|
|
02-09-2012
|
1.50
|
Make aft bulkhead from .032 al plate.
|
Details
|
|
|
02-09-2012
|
0.01
|
Finished aft fuselage rear bulkhead.
|
Details
|
|
|
02-07-2012
|
2.00
|
Finished more F23 aft fuselage parts.
|
Details
|
|
|
02-06-2012
|
2.00
|
Build more aft fuselage parts.
|
Details
|
|
|
02-04-2012
|
2.00
|
Bulid Cross Tie Box
|
Details
|
|
|
02-02-2012
|
2.50
|
Make cross ties for aft fuselage.
|
Details
|
|
|
02-01-2012
|
1.00
|
Start cross ties and cross tie box.
|
Details
|
|
|
02-01-2012
|
2.25
|
Attached fairleads to vertical channel.
|
Details
|
|
|
01-31-2012
|
2.25
|
Install rudder stop plates. Rivet aft fuselage ski
|
Details
|
|
|
01-28-2012
|
1.00
|
Setup rack to position work on aft skins.
|
Details
|
|
|
01-28-2012
|
2.50
|
Drill right aft fuselage skin vertical zees.
|
Details
|
|
|
01-27-2012
|
1.00
|
Drilled and clecoed left and right uper and lower
|
Details
|
|
|
01-22-2012
|
0.83
|
Fix position of Horizontal and Vertical splice pla
|
Details
|
|
|
01-21-2012
|
2.00
|
Drill holes, install nut plates for access hole.
|
Details
|
|
|
01-18-2012
|
1.17
|
Cut access hole in left fuselage.
|
Details
|
|
|
01-18-2012
|
1.17
|
Clamped and drilled, clecoed left upper and lower
|
Details
|
|
|
01-18-2012
|
1.67
|
Build the reinforcement ring for the access covers
|
Details
|
|
|
01-17-2012
|
1.75
|
Clamped and drilled longeron to right side skin.
|
Details
|
|
|
01-17-2012
|
0.75
|
Aft Fuselage longeron and skin.
|
Details
|
|
|
01-15-2012
|
2.00
|
Made the fairlead blocks and drilled holes.
|
Details
|
|
|
01-15-2012
|
1.00
|
Cut the rudder cable holes in left and right aft f
|
Details
|
|
|
01-13-2012
|
3.00
|
Step drilled the 5/16, 3/4, and 1 inch holes in th
|
Details
|
|
|
01-13-2012
|
3.25
|
Bend the aft fuselage splice plates per plans.
|
Details
|
|
|
01-11-2012
|
3.00
|
Finished F26 extruded al splice plates.
|
Details
|
|
|
01-09-2012
|
1.00
|
Cut top and bottom longerons for rear fuselage.
|
Details
|
|
|
01-07-2012
|
3.25
|
Build more vertical channel.
|
Details
|
|
|
01-03-2012
|
1.25
|
Build SNX F27-01 right and left vertical channel.
|
Details
|
|
|
01-01-2012
|
1.00
|
Rivet Flap hinge to rear spar.
|
Details
|
|
|
12-30-2011
|
1.25
|
Trimmed the left fiberglass wing tip.
|
Details
|
|
|
12-27-2011
|
1.33
|
Flip wing and rivet top LE skin.
|
Details
|
|
|
12-26-2011
|
6.25
|
Finish Bottom LE skin, Landing Light, and Lens.
|
Details
|
|
|
12-23-2011
|
3.17
|
Finsih landing light cutout.
|
Details
|
|
|
12-22-2011
|
2.33
|
Clecoed leading edge skin into position.
|
Details
|
|
|
12-20-2011
|
1.67
|
Dimpled and final debur of the leading edge skin.
|
Details
|
|
|
12-19-2011
|
3.00
|
Flipped wing again. Dimpled lower forward ribs. Fa
|
Details
|
|
|
12-18-2011
|
2.50
|
Cleco and rivet Botom Skin
|
Details
|
|
|
12-15-2011
|
2.25
|
Cleco and rivet top skin and aileron hinge half.
|
Details
|
|
|
12-14-2011
|
2.00
|
Installed aileron pushrod assembly to bellcrank.
|
Details
|
|
|
12-13-2011
|
2.25
|
Installed the reinforcement ring onto the bottom s
|
Details
|
|
|
12-10-2011
|
2.00
|
Deburr ribs and aft spar.
|
Details
|
|
|
12-05-2011
|
1.25
|
Deburr the main top left wing skin.
|
Details
|
|
|
12-01-2011
|
1.50
|
Deburr leading edge.
|
Details
|
|
|
11-19-2011
|
2.50
|
Pilot drill top left wing skin to aft ribs.
|
Details
|
|
|
11-17-2011
|
1.50
|
Flipped left wing, drill top skin.
|
Details
|
|
|
11-14-2011
|
4.25
|
Position forward skin and drill forward ribs.
|
Details
|
|
|
11-13-2011
|
3.00
|
Flip wing, fit bottom skin and forward skin.
|
Details
|
|
|
11-12-2011
|
3.75
|
Make left flap hinge and install on flap.
|
Details
|
|
|
11-10-2011
|
4.50
|
Pilot drilled top skin,
|
Details
|
|
|
11-01-2011
|
4.00
|
Top Skin, Ribs pilot drilled.
|
Details
|
|
|
10-23-2011
|
0.75
|
Cut materiel from nose of forward rib..
|
Details
|
|
|
10-21-2011
|
0.01
|
Build Wing stand.
|
Details
|
|
|
09-19-2011
|
5.25
|
Cleco and rivet top skin. Cut wing tip. Wire landi
|
Details
|
|
|
09-12-2011
|
3.25
|
Final inspection and deburr of bottom leading edge
|
Details
|
|
|
09-11-2011
|
2.00
|
Cut and shape landing light lens.
|
Details
|
|
|
09-09-2011
|
2.00
|
Cut and install top lens mounting bracket.
|
Details
|
|
|
09-07-2011
|
2.00
|
Final deburr and inspection of top leading edge.
|
Details
|
|
|
09-06-2011
|
3.00
|
Cut pieces for the landing light lens bracket.
|
Details
|
|
|
08-25-2011
|
3.00
|
Layout pilot hole locations.
|
Details
|
|
|
08-24-2011
|
1.25
|
Cut Left Flap Skin.
|
Details
|
|
|
08-23-2011
|
2.50
|
Dimpled forward ribs and leading edge.
|
Details
|
|
|
08-22-2011
|
4.00
|
Cut Landing light hole. Cut pitot hole and bracket
|
Details
|
|
|
08-18-2011
|
3.50
|
Deburr, cleco, rivet all right flap parts.
|
Details
|
|
|
08-17-2011
|
3.75
|
Fit, drill right Flap Hinge.
|
Details
|
|
|
08-16-2011
|
3.25
|
Pilot drilled flap ribs and updrilled all to #30.
|
Details
|
|
|
08-15-2011
|
4.00
|
Make flap ribs and cut Flap Skin.
|
Details
|
|
|
08-08-2011
|
1.50
|
Complete Aileron Push/Pull rod and install.
|
Details
|
|
|
08-04-2011
|
2.50
|
Debur bottom skin, fit, cleco, rivet.
|
Details
|
|
|
06-29-2011
|
2.17
|
Deburr, fit and cleco bottom Skin for riveting.
|
Details
|
|
|
06-23-2011
|
1.50
|
Drilled, Deburred, Dimpled, and Riveted nut plates
|
Details
|
|
|
06-23-2011
|
1.42
|
Continue deburr of Main Spar and Skin.
|
Details
|
|
|
06-21-2011
|
1.50
|
Updrill and Deburr Bottom Main Spar and Skin.
|
Details
|
|
|
06-20-2011
|
2.50
|
Deburred Top Skin, Root Doubler, Aft ribs and top
|
Details
|
|
|
06-20-2011
|
1.75
|
Bottom Rear Spar, Bottom Skin, and Flap Hinge updr
|
Details
|
|
|
06-19-2011
|
1.50
|
Deburred Leading Edge and Forward Ribs
|
Details
|
|
|
06-09-2011
|
2.25
|
Inspection plate ring. Deburr top LE edge ribs.
|
Details
|
|
|
05-25-2011
|
1.75
|
Updrill Top Right Wing Skin and cleco Hinges.
|
Details
|
|
|
05-21-2011
|
0.50
|
Flipped wing.
|
Details
|
|
|
05-17-2011
|
1.00
|
Cleco Bottom Forward Skin.
|
Details
|
|
|
05-16-2011
|
3.00
|
Clecoed Forward Skin to Top Main Spar of right win
|
Details
|
|
|
05-02-2011
|
0.01
|
Travel to Sonex to pick-up parts.
|
Details
|
|
|
04-18-2011
|
0.01
|
Placed on-line order with Sonex for the Leading Ed
|
Details
|
|
|
04-16-2011
|
1.00
|
Build new Forward Rib.
|
Details
|
|
|
04-15-2011
|
1.00
|
A bad accident with the right wing.
|
Details
|
|
|
04-14-2011
|
0.75
|
Placed Ratchet Straps to pull Leading Edge into po
|
Details
|
|
|
04-07-2011
|
1.25
|
Fit and pilot drill Right Wing Leading Edge .
|
Details
|
|
|
04-05-2011
|
1.25
|
Remove Fwd Root Rib. Bend Attach Angle.
|
Details
|
|
|
04-04-2011
|
0.50
|
Removed right Forward Root Rib.
|
Details
|
|
|
04-01-2011
|
1.17
|
Fit Leading Edge Skin and clecoed to Main Spar.
|
Details
|
|
|
03-31-2011
|
1.00
|
Remake Elevator Trim.
|
Details
|
|
|
03-30-2011
|
1.17
|
Pilot drilled bottom skin to the main spar extrusi
|
Details
|
|
|
03-29-2011
|
3.00
|
Fit and drill bottom skin on right wing.
|
Details
|
|
|
03-24-2011
|
3.33
|
Pilot drilled and clecoed top wing skin, ribs.
|
Details
|
|
|
03-23-2011
|
1.67
|
Level wings to eliminate twist.
|
Details
|
|
|
01-19-2011
|
3.00
|
Ream holes in forward ribs for tubing.
|
Details
|
|
|
01-12-2011
|
4.50
|
Riveted bottom aileron skin.
|
Details
|
|
|
01-11-2011
|
2.75
|
Updrill and deburr left Aileron pieces.
|
Details
|
|
|
01-10-2011
|
2.50
|
Pilot drill and cleco left Aileron.
|
Details
|
|
|
01-09-2011
|
2.25
|
Finish cutting left Aileron skin.
|
Details
|
|
|
01-08-2011
|
1.17
|
Installed nylon tubes for recognition / nivigation
|
Details
|
|
|
01-02-2011
|
4.00
|
Clecoed and riveted left wing ribs.
|
Details
|
|
|
01-01-2011
|
1.50
|
Start cutting left Aileron Skin.
|
Details
|
|
|
01-01-2011
|
2.50
|
Cleco and rivet right Aileron assembly.
|
Details
|
|
|
12-31-2010
|
2.00
|
Deburr right Aileron.
|
Details
|
|
|
12-28-2010
|
2.00
|
Updrill Right Aileron
|
Details
|
|
|
12-28-2010
|
2.00
|
Pilot and updrill right Aileron.
|
Details
|
|
|
12-25-2010
|
1.00
|
Pilot drilled Hinge to aileron.
|
Details
|
|
|
12-24-2010
|
1.50
|
Rivet Aileron Counterbalance Assembly.
|
Details
|
|
|
12-23-2010
|
1.50
|
Rebuild Flap Rib and Aileron Channel.
|
Details
|
|
|
12-23-2010
|
3.25
|
Build left Aileron Counterbalance.
|
Details
|
|
|
12-22-2010
|
4.00
|
Build Aileron Counterbalance assembly.
|
Details
|
|
|
12-21-2010
|
2.50
|
Cut Aileron Skin.
|
Details
|
|
|
12-20-2010
|
3.00
|
Build channel and cut right Aileron Skin.
|
Details
|
|
|
12-17-2010
|
2.25
|
Cleaning and smoothing the welded holes in flaps.
|
Details
|
|
|
12-15-2010
|
3.25
|
Build Aileron Drive Ribs.
|
Details
|
|
|
12-14-2010
|
1.75
|
Drill pilot holes in Flap Skins.
|
Details
|
|
|
12-13-2010
|
1.75
|
Rivet Flap Drive Ribs, Other Ribs
|
Details
|
|
|
12-13-2010
|
0.01
|
Cut Flap Skins
|
Details
|
|
|
12-09-2010
|
1.25
|
Start the riveting of the ribs to the main spar.
|
Details
|
|
|
12-09-2010
|
3.25
|
Install the Aft and Forward Root Ribs.
|
Details
|
|
|
12-07-2010
|
8.00
|
Cleco #30 Left Wing Ribs, Spacers, Rear Spar.
|
Details
|
|
|
12-06-2010
|
2.50
|
Start the Left Wing. Pilot holes in spacers,Spar.
|
Details
|
|
|
12-06-2010
|
2.50
|
Attach Forward Root Rib.
|
Details
|
|
|
12-05-2010
|
5.50
|
Attach Right Aft Root Rib.
|
Details
|
|
|
12-03-2010
|
3.50
|
Riveted spacers and Ribs to Main Spar.
|
Details
|
|
|
12-01-2010
|
5.25
|
Deburred all Right Wing parts.
|
Details
|
|
|
11-30-2010
|
3.25
|
Updrill Spacers, main spar.
|
Details
|
|
|
11-28-2010
|
5.50
|
Wing Ribs
|
Details
|
|
|
11-21-2010
|
3.50
|
Aileron Bellcrank and box.
|
Details
|
|
|
11-20-2010
|
5.00
|
Aileron Bellcrank Assemblies
|
Details
|
|
|
11-19-2010
|
2.50
|
Took my Wing Spars to Ben Grabers shop.
|
Details
|
|
|
11-19-2010
|
2.00
|
Deburred and cleaned both spars.
|
Details
|
|
|
11-18-2010
|
1.25
|
Rebuild Angle for the Root Wing Attach Assembly.
|
Details
|
|
|
11-15-2010
|
3.75
|
Attach Assemblies to the Left Main Wing Spar>
|
Details
|
|
|
11-12-2010
|
5.75
|
Attach Assemblies to the Right Main Wing Spar.
|
Details
|
|
|
11-05-2010
|
3.00
|
Completed Wing Attachment Assemblies.
|
Details
|
|
|
11-04-2010
|
2.25
|
Build new attach Angle.
|
Details
|
|
|
10-27-2010
|
3.25
|
Wing Attach Assemblies.
|
Details
|
|
|
10-26-2010
|
4.00
|
Construct Attachment Assemblies
|
Details
|
|
|
10-25-2010
|
4.50
|
Debur Gussets and Aft Ribs
|
Details
|
|
|
10-24-2010
|
5.25
|
Continue work on Aft Rib assemblies 1-5
|
Details
|
|
|
10-21-2010
|
3.00
|
Cut W16-06 Aft Ribs and bend 07-08 Gussets.
|
Details
|
|
|
10-20-2010
|
1.25
|
Trim 8 Forward Ribs.
|
Details
|
|
|
10-20-2010
|
2.75
|
Drill and rivet 16 gussets.
|
Details
|
|
|
10-19-2010
|
3.00
|
Bent Flanges on gussets. Made template for the 05
|
Details
|
|
|
10-17-2010
|
2.00
|
Final Rivet of right and left rear spar.
|
Details
|
|
|
10-16-2010
|
0.75
|
Primed parts for right rear wing spar.
|
Details
|
|
|
10-12-2010
|
1.50
|
Updrill Left Rear Wing Spar
|
Details
|
|
|
09-30-2010
|
0.00
|
10 Days at Hoosier National Forest
|
Details
|
|
|
09-25-2010
|
3.50
|
Up-drill Right Rear Spar.
|
Details
|
|
|
09-23-2010
|
4.00
|
Finish Rear Spar parts and cleco all..
|
Details
|
|
|
09-22-2010
|
0.75
|
Continued work on rear spars.
|
Details
|
|
|
09-21-2010
|
3.00
|
Pilot drill Rear Spars. Build rear spar ends.
|
Details
|
|
|
09-19-2010
|
2.50
|
Cut rear spar channel and fabricate spar parts.
|
Details
|
|
|
08-05-2010
|
0.00
|
Moving Mom back to Indiana.
|
Details
|
|
|
07-14-2010
|
1.00
|
Flap hinges and flap drive rib assembly.
|
Details
|
|
|
06-23-2010
|
0.00
|
Stop Construction to finish workshop.
|
Details
|
|
|
06-22-2010
|
5.00
|
Repair fiberglass tail tip.
|
Details
|
|
|
06-21-2010
|
3.00
|
Cut and install fiberglassTail Tips.
|
Details
|
|
|
06-17-2010
|
5.00
|
Cleaned and deburred all Horizontal Stab parts.Cle
|
Details
|
|
|
06-09-2010
|
3.00
|
Updrill Horizontal Stab & hindges
|
Details
|
|
|
06-08-2010
|
3.00
|
Pilot drill Ribs from Pilot Holes in skin.
|
Details
|
|
|
06-04-2010
|
3.00
|
Pilot Drilled,Clecoed and Riveted Forward and Main
|
Details
|
|
|
05-24-2010
|
1.00
|
Primed forward and Main Horizontal spar.
|
Details
|
|
|
05-19-2010
|
3.00
|
Position ribs with main and fwd spars.
|
Details
|
|
|
05-18-2010
|
5.00
|
Made 12 Horozontal Stab Ribs
|
Details
|
|
|
05-13-2010
|
5.00
|
Deburred Main Spar and started FWD Spar.
|
Details
|
|
|
05-12-2010
|
4.00
|
Cut the Horozontal Main Spar and clecoed.
|
Details
|
|
|
04-25-2010
|
6.00
|
Clecoed Elevator fixed and riveted.
|
Details
|
|
|
04-24-2010
|
2.00
|
Final fit Elevator Skins and Ribs.
|
Details
|
|
|
04-22-2010
|
2.00
|
Cut both Elevator Skins.
|
Details
|
|
|
04-15-2010
|
1.50
|
Prime Rudder Parts and Cleco, rivet.
|
Details
|
|
|
04-15-2010
|
1.00
|
Pilot drilled Elevator Horn.
|
Details
|
|
|
04-14-2010
|
4.00
|
Cut Elevator Skins. Made ribs and deburred fwd spa
|
Details
|
|
|
04-13-2010
|
2.00
|
Build Trim Tab Assembly
|
Details
|
|
|
03-26-2010
|
2.00
|
Rivet Vertical Stab Skin.
|
Details
|
|
|
03-24-2010
|
2.00
|
Rudder Horn Assembly
|
Details
|
|
|
03-23-2010
|
1.50
|
Cut fiberglass verti stab tip.
|
Details
|
|
|
03-20-2010
|
3.00
|
Attached vert stab skin.
|
Details
|
|
|
03-19-2010
|
3.00
|
Assemble painted Vertical tail parts.
|
Details
|
|
|
03-18-2010
|
2.00
|
Prime all vertical Stab parts.
|
Details
|
|
|
03-17-2010
|
2.00
|
Fixed and Finished Vertical Tail parts.
|
Details
|
|
|
03-16-2010
|
4.50
|
Do-Over on Forward Tail Spar.
|
Details
|
|
|
03-12-2010
|
2.50
|
Main vertical spar
|
Details
|
|
|
03-10-2010
|
5.00
|
Waiting on material. Worked on rudder.
|
Details
|
|
|
03-07-2010
|
5.50
|
Build main vertical spar parts.
|
Details
|
|
|
03-06-2010
|
1.00
|
Return from Texas and Open shop.
|
Details
|
|
|
12-14-2009
|
3.00
|
Fwd, Upper and Lower spar channel T12-08, 04, 03
|
Details
|
|
|
12-11-2009
|
1.50
|
Deburr Vertical Stab Ribs
|
Details
|
|
|
12-10-2009
|
3.00
|
Ribs for Vertical StabT10-01, 02, 03
|
Details
|
|
|
12-08-2009
|
0.00
|
Unloading and inspection of Damaged parts.
|
Details
|
|
|
12-08-2009
|
8.00
|
Sonex Kit inventory and construction of build tabl
|
Details
|
|
|
12-07-2009
|
0.01
|
Why I choose Sonex.
|
Details
|
|
|
12-06-2009
|
0.01
|
Oshkosh 2009
|
Details
|
|