Powered By Kitlog Pro v2.0
Ky Bearhawk Construction site
Bearhawk
All
Work Logs Found:
232
Category Work Time:
465 Hours
Date
Hours
Work Log Summary
Details
03-16-2015
2.00
Riveted Fairleads, Wiring Conduit in place
Details
11-30-2014
1.50
Cable Routing
Details
11-29-2014
1.50
Fairlead installation
Details
09-21-2014
1.00
Aileron Cable routing
Details
09-18-2014
0.50
Second coat and the metal arrives
Details
09-17-2014
1.00
Fairlead guides
Details
09-16-2014
1.00
Aileron bellcranks and outer hinges
Details
09-15-2014
1.50
Pulley brackets and Flap push rods
Details
09-14-2014
2.00
Mounted Flap drives
Details
09-13-2014
2.00
A little painting and aileron bell crank calculati
Details
09-12-2014
2.00
Pulley mount at mid spar
Details
09-11-2014
1.00
Cable retainers and more welding
Details
09-10-2014
1.00
Reweld grease fitting nut
Details
09-09-2014
1.00
Right False Spar
Details
09-08-2014
1.00
Right False spar
Details
09-06-2014
5.00
False Spar / Flap drive nose rib installations
Details
09-02-2014
1.00
Mounted hinges, Installed some rivets
Details
08-31-2014
1.00
Final coat
Details
08-19-2014
0.25
Second Coat steel parts
Details
08-18-2014
1.00
Steel parts painting
Details
08-16-2014
3.00
Priming aluminum again
Details
08-14-2014
1.50
Wing Assembly Details
Details
08-13-2014
1.50
Aileron Pocket Ribs and False Spars
Details
08-11-2014
1.50
Aileron Drive
Details
08-02-2014
4.00
False Spar tank mounts and flap supports
Details
07-31-2014
2.00
Right wing flap support tube
Details
07-30-2014
2.00
Flap Torque tube root support
Details
07-29-2014
2.00
Root flap torqe tube support construction
Details
07-28-2014
2.00
Figuring out the bolts and nuts
Details
07-09-2014
1.50
False Spars and Pocket ribs
Details
07-08-2014
1.50
False Spars and Pocket Ribs
Details
07-07-2014
2.00
False Spars
Details
07-05-2014
1.50
Rear ribs and False Spar
Details
07-04-2014
6.00
Nose rib installation
Details
07-03-2014
2.50
Nose Rib attach angles for flap drive connection
Details
06-30-2014
1.50
More nose ribs
Details
06-29-2014
0.50
Nose Rib install
Details
06-28-2014
1.00
Nose Rib Installation
Details
06-26-2014
1.00
Installing Nose Ribs
Details
06-23-2014
2.00
Aligning Nose Ribs
Details
06-15-2014
3.00
Center Rib installation
Details
06-14-2014
6.00
Rivet Center Ribs in
Details
08-18-2013
2.00
Right wing alignment and center rib install
Details
08-17-2013
4.00
Installing Center Ribs Left Wing
Details
08-15-2013
2.00
Wing Alignment
Details
08-14-2013
1.50
Aligning the spars
Details
08-06-2013
1.50
S;par placement on jig
Details
08-05-2013
1.50
Cross Supports
Details
08-04-2013
2.00
Post 2 mounted
Details
08-03-2013
1.00
1st post done
Details
08-02-2013
1.00
Putting the wing assembly jig together
Details
09-09-2012
2.00
Back to work
Details
01-07-2012
2.00
Gussetts for the flaps
Details
12-31-2011
1.00
Corner Reinforcements
Details
12-30-2011
4.00
Nose Skins
Details
12-25-2011
1.00
Priming of steel
Details
12-18-2011
2.00
Priming the wing steel
Details
12-17-2011
2.00
Right flap built and ready to skin
Details
12-15-2011
2.00
Left Flap Buildup
Details
12-12-2011
1.00
New Pneumatic Squeezer setup
Details
12-05-2011
2.00
Starting Flap rib alignment
Details
12-04-2011
4.00
Doublers and assembly of ailerons
Details
12-03-2011
2.00
Priming of Aileron and Flap Spars
Details
12-02-2011
1.00
Debur and prime prep
Details
12-01-2011
2.00
Attach angles match drilling
Details
11-29-2011
1.50
Attach Angles
Details
11-28-2011
1.50
Attach Angles
Details
11-27-2011
1.00
Layout of second flap spar and attach angle creati
Details
11-25-2011
1.00
Layout of flap spar
Details
11-20-2011
1.00
Aileron Construction
Details
11-19-2011
6.00
Aileron Construction
Details
11-14-2011
1.50
Aileron Construction
Details
11-13-2011
3.00
Began Contrustion of wing control surfaces
Details
11-08-2011
2.00
Aileron Bell Cranks
Details
11-07-2011
1.00
Bell Cranks
Details
11-05-2011
1.00
Hinge completion
Details
10-29-2011
3.00
Hinges and Push Rods
Details
10-27-2011
2.00
Finished up aileron drive mount
Details
10-23-2011
2.00
Welding this and that
Details
10-17-2011
1.00
Get back starting
Details
09-18-2011
3.00
Aileron Hinges
Details
09-17-2011
3.00
This and that
Details
09-16-2011
1.00
Flap Hinges
Details
09-15-2011
1.00
Hinge Work
Details
09-14-2011
2.00
Fixing the oops
Details
09-07-2011
1.50
Fix the two left problem
Details
09-06-2011
1.50
Welding up Aileron Drive stuff
Details
09-05-2011
7.00
Flap mechanism all welded
Details
09-04-2011
5.00
Flap Drive
Details
08-30-2011
2.00
1st hinge welding
Details
08-29-2011
2.50
Hinges
Details
08-28-2011
2.00
Odds and ends of wing steel
Details
08-27-2011
2.00
Let the welding begin
Details
08-25-2011
2.00
Match Drilling Hinges
Details
08-24-2011
2.00
Hinges
Details
08-23-2011
2.00
Hinges
Details
08-22-2011
2.50
Flap Drive Components
Details
08-21-2011
2.50
Flap Drive Components
08-20-2011
3.00
Flap Drive
Details
08-18-2011
2.00
Flap and Aileron drive mounts
Details
08-17-2011
2.50
Aileron and Flap drive components
Details
08-16-2011
0.50
Wing steel inventory
Details
08-15-2011
2.00
Spar construction complete
Details
08-14-2011
6.00
Attach angles on rear spars
Details
08-12-2011
1.00
Attach angle setback
Details
08-11-2011
1.00
Attach Angles
Details
08-10-2011
4.00
Attaching Attach Angles
Details
08-08-2011
2.00
Attach Angles
Details
08-07-2011
1.50
Attach Angles
Details
06-03-2011
1.00
Attaching attach angles
Details
06-02-2011
1.00
More Priming
Details
06-01-2011
1.00
More priming
Details
05-31-2011
1.50
90% Done with the spars, 90% to go on the spars
Details
05-26-2011
1.00
Main spar #1 detail work
Details
05-25-2011
1.50
Spar attach angle spacers
Details
05-23-2011
1.00
Rear spar attach angles
Details
05-21-2011
3.00
Rear Spar Construction
Details
05-19-2011
0.50
Rear Spar
Details
05-18-2011
1.50
Rib Attach Angles Main Spar
Details
05-17-2011
2.00
Attach angle creation
Details
05-16-2011
1.50
Started on Rear spars
Details
05-16-2011
1.00
Finished up the stiffener angles
Details
05-15-2011
1.00
Riveting of main spar
Details
05-14-2011
5.00
Riveting 2nd main spar and fixing mistakes
Details
05-13-2011
2.00
Riveting my first spar
Details
05-11-2011
2.00
All Spar material primed
Details
05-09-2011
2.00
Main Spar assembly
Details
05-01-2011
5.00
Center Ribs and Tip rib stiffeners
Details
04-30-2011
4.00
Nose Rib Stiffeners Completed
Details
04-24-2011
1.00
Started attaching stiffeners to ribs
Details
04-23-2011
3.00
More priming
Details
04-22-2011
1.00
Priming the ribs
Details
04-20-2011
2.50
Cut ribs to correct length for location
Details
04-19-2011
1.50
Etching complete
Details
04-18-2011
1.00
Etching
Details
04-17-2011
1.50
Etching
Details
04-14-2011
1.00
Finally priming
Details
04-08-2011
5.00
Ugh... Priming
Details
03-18-2011
2.00
Priming Prep
Details
03-17-2011
1.00
Priming table
Details
03-12-2011
1.00
Priming parts holder
Details
03-12-2011
1.00
Finished the Deburring
Details
03-04-2011
0.50
Deburring
Details
03-03-2011
1.00
More deburring
Details
03-02-2011
1.00
Debur
Details
02-27-2011
1.00
Deburring
Details
02-26-2011
5.00
More deburring
Details
02-23-2011
1.50
Deburring Time
Details
02-21-2011
2.00
Finishing up spar number 1
Details
02-20-2011
2.50
Finalizing Main Spars for priming
Details
02-19-2011
3.00
Wing Attach fittings
Details
02-16-2011
0.00
Spar damage control follow up
Details
02-12-2011
2.50
Wing attach fittings
Details
02-12-2011
0.50
Spar damage control
Details
02-06-2011
0.50
Wing attach fittings
Details
01-30-2011
0.50
Wing Attach fittings
Details
01-29-2011
7.00
Finalizing rear spars
Details
01-08-2011
2.50
Rear Spar number 2
Details
01-06-2011
2.50
2nd Rear spar construction and attach fittings
Details
01-05-2011
0.50
Strut Attach fittings
Details
01-05-2011
0.00
Harbor Freight Bandsaw
Details
01-03-2011
2.50
Spar number 2 construction
Details
01-02-2011
3.00
Right Rear Spar construction
Details
01-01-2011
0.50
Match Drilling cap strips
Details
12-31-2010
5.00
Spar construction
Details
12-24-2010
0.50
Spar splice plate repair
Details
12-22-2010
0.50
Spar splice plate repair
Details
12-21-2010
2.00
2nd spar rib spacers
Details
12-20-2010
4.00
Spar 2 construction
Details
12-19-2010
3.00
Layout of main spar number 2
Details
12-11-2010
3.00
Spar spacers
Details
12-10-2010
6.00
Spar work
Details
12-09-2010
1.00
Laid out spars and clamped
Details
12-08-2010
2.00
Spar webs and capstrips
Details
12-05-2010
2.50
Spar Layout
Details
12-03-2010
2.50
Finished cutting out spar plates
Details
11-30-2010
3.00
Spars all bent
Details
11-30-2010
0.00
Metal Brake end results
Details
11-30-2010
0.00
Follow up on the end results
Details
11-29-2010
2.00
Cutting and bending spars
Details
11-28-2010
3.00
Finish Main spars Start Rear spars
Details
11-27-2010
0.00
Spar cutting and bending (more pics)
Details
11-27-2010
2.00
Spar cutting and bending
Details
11-26-2010
1.00
Spar cutting expirements
Details
11-25-2010
1.50
Measurement and marking
Details
11-24-2010
0.50
Inventory of material
Details
11-22-2010
2.00
Almost done with the metal brake
Details
11-21-2010
1.00
8' Sheet Brake
Details
11-20-2010
1.00
8ft Brake Construction
Details
11-19-2010
2.50
8ft metal brake
Details
11-13-2010
4.00
Wrapping up the ribs
Details
11-13-2010
0.00
More pictures for today
Details
11-12-2010
1.50
Flap Nose Ribs, Aileron Pocket Ribs
Details
11-11-2010
3.50
Small Ribs Redo
Details
11-10-2010
2.50
Jig Day
Details
11-08-2010
2.00
Failures never stop
Details
11-07-2010
2.00
Failure 2
Details
11-04-2010
2.00
Aileron Nose Ribs
Details
11-03-2010
2.00
Aileron Nose Ribs
Details
11-01-2010
1.50
And More stiffener angles
Details
10-31-2010
3.00
More stiffener angles
Details
10-30-2010
4.00
Stiffening Angles
Details
10-28-2010
2.00
.032 Center ribs and stiffener angle prep
Details
10-27-2010
2.00
False ribs
Details
10-26-2010
2.00
Oblong Hole flanging,Tip Ribs
Details
10-25-2010
2.00
Center rib Lightening hole flanging
Details
10-24-2010
5.00
Center and Tip Ribs Completion
Details
10-23-2010
3.00
Aileron Ribs and Center Ribs
Details
10-23-2010
3.00
Aileron Ribs
Details
10-21-2010
3.00
Flap Ribs Completed
Details
10-21-2010
0.00
Flap ribs completed
Details
10-20-2010
0.50
Flap Flanging Jig
Details
10-19-2010
2.50
Flap Ribs
Details
10-18-2010
0.00
Router Laminate Bit
Details
10-18-2010
2.50
Back Rib failure replacement
Details
10-17-2010
2.00
Failure #1
Details
10-16-2010
1.50
Rear Ribs
Details
10-16-2010
2.00
Rear Ribs
Details
10-14-2010
1.00
Tip Ribs
Details
10-14-2010
2.00
Tip Ribs
Details
10-13-2010
2.00
Center Ribs
Details
10-11-2010
3.00
Fluting
Details
10-10-2010
2.00
Lightening hole flanging
Details
10-09-2010
4.00
Lightening hole flanging
Details
10-09-2010
2.50
Bending flanges
Details
10-08-2010
2.00
Nose rib flange jig
Details
10-07-2010
3.00
Lightening Holes
Details
10-06-2010
3.00
Remainer of Nose Blanks
Details
10-05-2010
2.00
Rib Blanks
Details
10-04-2010
1.00
Router
Details
10-04-2010
1.00
Rib blanks
Details
10-01-2010
2.00
Jigs
Details
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
232
464
Aileron/Flap
19
40
Metal Brake
6
6
Priming
19
31
Spars
63
128
Tools
5
3
Wing Assembly
43
84
Wing Ribs
45
104
Wing Steel
32
68
Copyright © 2001-2024 Matronics. All Rights Reserved.