DAVID'S WEB SITE
Work Logs Found: 305
Category Work Time: 1106 Hours
 Date
Hours
Work Log Summary

Details

 02-18-2015
0.00
Annual
Details

 01-24-2015
2.50
Annual Inspection Prep
Details

 01-18-2015
1.50
Longer Engine Run
Details

 01-16-2015
2.50
Initial Engine Run
Details

 01-10-2015
3.00
More Punch List Work
Details

 01-01-2015
3.50
Working on my Last Punch List
Details

 12-31-2014
1.50
Working at Moving Hardware Inventory
Details
       

 12-29-2014
3.00
Tool Cabinet Finish Up
Details
     

 12-24-2014
2.50
Christmas Time
Details

 12-14-2014
1.50
Miscellaneous Items Work
Details
       

 12-08-2014
2.50
Miscellaneous Items
Details

 12-03-2014
3.00
Wing Strut Fairing Work
Details
       

 11-25-2014
2.50
Punch List Work
Details

 11-13-2014
3.50
Aileron Hook-Up
Details

 11-09-2014
3.50
More Misc Completions
Details

 11-03-2014
3.00
Tying up Loose Ends
Details
       

 10-28-2014
2.00
Wing Root Fairing Work
Details
       

 10-25-2014
3.00
Detail work Everywhere
Details
       

 10-20-2014
4.50
Wing Detail Work
Details

 10-19-2014
3.00
Wings Hardware Installation
Details
       

 10-06-2014
3.00
Hooking Up the Wings
Details

 10-05-2014
4.00
Mounting Wings
Details
       

 10-02-2014
3.50
Wing Hanging Prep
Details
       

 10-01-2014
2.50
Finish up details
Details

 09-30-2014
3.00
Fitting Inspection Covers
Details
     

 09-28-2014
3.00
Wing Hardware Inventory
Details
       

 09-27-2014
6.00
Prepping Wings for Moutning
Details
       

 09-20-2014
8.50
Firewall Rework
Details
     

 09-12-2014
2.00
Cowl Fitting and Installation
Details
       

 09-04-2014
4.50
Scooty Rogers Inspection
Details

 08-31-2014
2.50
Working around the engine
Details
     

 08-27-2014
2.50
Cowling Work
Details
     

 08-20-2014
2.50
Bungee Cord Installation
Details
       

 08-12-2014
1.50
Windshield Clean up
Details
       

 08-11-2014
8.50
Control Surface Mounting
Details
       

 08-02-2014
3.50
More Firewall Work
Details
       

 08-01-2014
6.50
Firewall Forward Work
Details
       

 07-26-2014
1.50
Engine hook up work
Details
       

 07-21-2014
3.00
Engine Hook Ups
Details
     

 07-19-2014
3.00
Hanging Engine
Details
     

 07-15-2014
3.50
Firewall Install
Details
       

 07-10-2014
3.00
Firewall and panel prep
Details
     

 07-05-2014
2.00
Left Side Window Finish Up
Details
     

 07-04-2014
3.00
Misc Parts Painting
Details
     

 07-03-2014
6.00
Door Seal Work
Details
       

 06-28-2014
2.50
Parts Inventory
Details

 06-22-2014
3.50
Firewall Work
Details

 06-21-2014
2.50
Interior Finish Up
Details
       

 06-17-2014
2.50
Firewall Prep
Details

 06-16-2014
2.50
Interior and Firewall Work
Details
       

 06-15-2014
3.00
Finish up on Left Cabin Wall Piece
Details
       

 06-06-2014
3.00
Work on Left Wall Interior
Details
       

 05-26-2014
3.00
More Interior Work
Details

 05-25-2014
3.50
Fitting of Interior Pieces
Details
     

 05-23-2014
5.00
Hitting the Laundry List
Details
       

 05-18-2014
4.50
Paint Booth And Tail Feather Work
Details
       

 05-12-2014
6.00
Paint Finish-Up
Details
     

 05-06-2014
3.00
Masking Cowling and FinishingTail Feathers
Details

 05-05-2014
2.50
Mounting of Boot Cowl and Cowling
Details
       

 05-04-2014
2.50
Paint Tail Feathers
Details
     

 05-03-2014
1.40
Moving Fuselage
Details

 04-25-2014
3.00
Installation of Gear Legs
Details

 04-13-2014
3.00
Mask Painting of Door and Rudder
Details

 04-12-2014
3.00
Engine Baffle And Gear Assembly Work
Details
       

 04-11-2014
2.00
Paint Gear Legs
Details
       

 04-07-2014
1.50
Masking Door & Cleaning up Paint Booth
Details

 04-03-2014
4.00
Fuselage Trim Painting
Details
       

 04-01-2014
4.50
Masking Fuselage
Details

 03-29-2014
3.30
Trim Masking for Fuselage
Details
       

 03-22-2014
7.00
Fuselage Paint
Details
       

 03-21-2014
4.00
Fuselage Masking
Details
     

 02-24-2014
2.20
Install Baffling on new Engine
Details

 02-23-2014
2.50
Engine Baffling Work
Details
       

 02-20-2014
3.50
Engine Swap
Details
       

 02-16-2014
2.50
Fuselage Mounting on Rotiserie
Details
       

 02-09-2014
2.50
Paint Booth Additional Mods
Details
       

 02-05-2014
4.00
Rebuild Paint Booth
Details
     

 02-04-2014
3.50
Wing/Fuselage Booth Swap
Details
       

 01-13-2014
1.50
Tail Light Refurb
Details
     

 01-12-2014
3.50
Work on Fairings and Tank Fittings
Details
       

 01-08-2014
2.50
Fuel Tank Work
Details
       

 01-01-2014
3.00
Install Left Wing Tank
Details
       

 12-28-2013
2.50
Door Assembly
Details
     

 12-18-2013
3.00
Right Wing Touch Up
Details

 12-12-2013
1.50
Pax Door Assembly
Details

 11-15-2013
1.50
Right Wing Paint Touch Up
Details

 11-13-2013
2.50
Right Wing Finish
Details
       

 11-12-2013
3.00
Right Wing Painiting
Details

 11-08-2013
1.50
Wing Swap Out
Details

 10-31-2013
3.00
Right Wing Finish Up
Details
       

 10-30-2013
3.50
Wing Painting
Details
     

 10-28-2013
1.50
Wing Washing
Details
       

 10-23-2013
2.50
Wings and Fuselage Moving
Details
     

 10-22-2013
2.50
Paint Booth Mods
Details

 10-19-2013
3.50
Paint Booth Extension
Details
       

 10-17-2013
1.00
Paint Booth Clean up
Details

 10-14-2013
1.00
Strut Paint Finish
Details

 10-12-2013
1.50
Strut Painting
Details

 10-11-2013
2.50
Wing Strut
Details

 10-05-2013
3.00
Aileron Paint Finishing
Details

 10-03-2013
2.50
Aileron and Cabin Door Painting
Details
       

 09-30-2013
3.00
Aileron Paint Prep
Details

 09-21-2013
2.50
Tail Feathers Painting
Details
       

 09-17-2013
1.75
Fabric Painting
Details
       

 09-16-2013
1.00
Inspection Plate Painting
Details
     

 09-15-2013
0.75
Paint Decisions
Details
     

 09-14-2013
3.50
Parts Cleaning
Details

 09-07-2013
4.00
Boot cowl painting
Details
       

 09-06-2013
4.00
More Metal Parts Painting
Details
       

 08-26-2013
4.50
Metal Parts Painting
Details
       

 08-21-2013
2.50
Clean Parts for Painting
Details

 08-18-2013
3.00
Finish up paint booth
Details
     

 08-11-2013
2.50
Paint Booth Work
Details

 07-26-2013
2.50
Clean and Sand Parts
Details

 07-05-2013
4.00
Assemble Paint Booth
Details

 06-03-2013
6.00
Parts Priming
Details
       

 05-14-2013
0.90
Priming Session
Details
     

 05-13-2013
2.50
Clean Parts for Priming
Details

 05-09-2013
1.50
Parts Priming
Details

 05-08-2013
1.50
More Parts Priming
Details

 05-05-2013
2.50
Parts Cleaning and Priming
Details
       

 04-30-2013
3.50
Fabricate Wing Root Fairings
Details

 04-28-2013
3.00
Paint Prep
Details

 04-21-2013
2.50
Nose Bowl Cleaning
Details
     

 04-13-2013
4.50
Wash and Prime Metal Parts
Details
     

 03-10-2013
3.50
Cowling Work
Details
       

 03-09-2013
3.00
Bottom Cowl Work
Details
     

 03-03-2013
3.00
Cowling Work
Details

 02-02-2013
1.50
Side Cowling Pieces Mounting
Details
       

 01-28-2013
3.00
Nose Bowl Debacle
Details

 01-23-2013
1.50
Engine Cowl Work
Details
       

 01-21-2013
4.50
Boot Cowl and Engine Work
Details

 01-21-2013
4.50
Boot Cowl and Engine Work
Details

 01-20-2013
2.00
Boot Cowl Work
Details
     

 01-12-2013
2.50
Boot Cowl Work
Details
       

 01-07-2013
1.50
Boot Cowl Work
Details
     

 01-04-2013
3.00
Wing Storage
Details
       

 01-02-2013
2.50
Generator Clean-up
Details

 12-26-2012
2.00
Boot Cowl Repair
Details
       

 12-24-2012
2.50
Boot Cowl and Carb Air Box Work
Details
       

 12-21-2012
5.00
Boot Cowl Stripping
Details
       

 12-16-2012
1.50
Game Plan Formulation
Details

 12-15-2012
2.00
Cabane Strut Cleaning and Generator Work
Details

 12-13-2012
2.00
Cabane Strut Cleaning
Details

 12-08-2012
2.00
Wing Sanding
Details

 12-04-2012
2.20
EkoFill Wings Finished
Details
       

 11-29-2012
2.00
Generator Clean-Up
Details

 11-29-2012
2.50
Generator Clean-up
Details

 11-29-2012
2.00
Generator Clean-up

 11-29-2012
2.50
Generator Clean-up

 11-28-2012
3.00
Boot Cowl and Carb Air Box Repair
Details

 11-25-2012
1.50
Wing Sanding and Cleaning
Details

 11-23-2012
2.50
Next Cross Coat Sprayed
Details

 11-21-2012
3.00
Wing Sanding
Details

 11-11-2012
2.50
Ironing and Sanding Wings
Details

 11-10-2012
3.00
Spray EkoFill Cross Coats
Details

 10-28-2012
2.50
Wings Clean-up
Details

 10-27-2012
2.50
Wings Clean-Up
Details

 10-26-2012
2.00
Ekofill Brush Coats Finish
Details

 10-24-2012
2.50
EkoFill Brush Coats
Details

 10-23-2012
2.50
Wing EkoFil Application
Details
       

 10-15-2012
2.00
Wings Clean-up
Details

 10-14-2012
2.50
Edge Tape Finish Up
Details
       

 10-09-2012
4.00
Rib Taping Finish
Details
       

 09-30-2012
3.00
Rib Taping
Details

 09-29-2012
3.00
Left Wing Taping
Details
       

 09-28-2012
2.00
Right Wing Taping
Details
       

 09-25-2012
2.70
Rib Stitch Finish
Details
       

 09-24-2012
2.50
Rib Stitching
Details

 09-19-2012
2.50
Just Five Ribs to Go
Details
       

 09-18-2012
2.70
Rib Stitching
Details

 09-16-2012
2.80
Rib Stitching
Details

 09-11-2012
3.20
Right Wing Clean-Up& Left Wing Start
Details
       

 09-10-2012
2.00
Finish Rib Taping - Right Wing
Details
       

 09-07-2012
2.50
More Rib Taping
Details
       

 09-06-2012
2.00
Rib Taping
Details
     

 09-05-2012
4.50
Right Wing Stitching Finish-Up
Details

 09-01-2012
2.50
Right Wing Rib Stitching
Details

 08-26-2012
3.00
Rib Stitching
Details

 08-21-2012
2.00
Rib Stitching - Hitting my Stride
Details
       

 08-20-2012
2.50
New Era of Rib Stitching
Details

 08-19-2012
2.00
Rib Stitching Cure
Details

 08-18-2012
4.00
Rib Stitching
Details
       

 08-16-2012
3.50
Rib Stitching
Details

 08-13-2012
2.50
Right Wing Stitching
Details

 08-12-2012
2.50
Wing Fabric Shrinks
Details
     

 08-06-2012
1.00
Wing Rotisserie Attachment
Details
       

 08-04-2012
2.00
Inspection Ring Finish
Details

 08-03-2012
3.50
RightWing Inspection Plates
Details
       

 07-28-2012
3.20
Right Wing Closing
Details

 07-26-2012
2.50
Right Wing Bottom Fabric
Details
       

 07-25-2012
2.00
Right Wing Bottom Fabric Work
Details
       

 07-12-2012
2.80
Inspection Ring Work
Details

 07-09-2012
3.00
Installing Inspection Rings
Details
       

 07-07-2012
2.00
Cutting Inspection Ring Covers
Details

 07-04-2012
2.20
Left Wing Bottom Shrink
Details
       

 07-03-2012
2.00
Left Wing Glue Work
Details
     

 07-02-2012
2.00
Work Begins on the Left Wing Bottom
Details
     

 06-30-2012
0.50
Wings Flipped Over
Details
       

 06-27-2012
1.50
Wing Root Fabric Work
Details
       

 06-26-2012
4.50
Right Wing Tank Area Work
Details

 06-13-2012
2.00
Right wing top fabric glue finish up
Details
       

 06-10-2012
2.00
Right Wing Glueing
Details
     

 06-09-2012
2.70
Wing Covering Work
Details
       

 05-25-2012
3.00
Wing Fabric Work
Details
       

 05-19-2012
1.00
Covering detail work
Details
       

 05-13-2012
3.00
Start of Wing Covering
Details

 05-12-2012
3.50
Final Prep For Covering
Details

 05-10-2012
2.00
Covering Approval
Details

 05-06-2012
1.50
Boot Cowl Paint Stripping
Details
     

 04-29-2012
1.50
Rib Bracing Tape Installation
Details
     

 04-27-2012
4.50
Paint Stripping
Details
     

 04-19-2012
1.70
Leading Edge Skin Completion
Details

 04-18-2012
2.00
Leading Edge Progress
Details
       

 04-17-2012
2.50
Leading Edge Work
Details
       

 04-15-2012
3.50
Leading Edge Work
Details

 04-05-2012
2.00
Install Leading Edge Supports
Details
       

 04-01-2012
2.50
Aileron Cables and LE Skins
Details
       

 03-30-2012
2.00
Right Wing Tip Bow Work
Details
       

 03-29-2012
3.00
Right Wing Tip Bow Work
Details
     

 03-25-2012
4.00
Left Wing Clean-up Finishing Touches
Details
       

 03-21-2012
2.00
Left Wing Parts Finish Up
Details

 03-20-2012
2.50
Left Wing Structure Finish Up
Details

 03-19-2012
2.00
Fairlead Installation
Details

 03-18-2012
4.00
Left Wing Cleaning and Assembly
Details
       

 03-11-2012
2.00
Install Left Wing "N" Compression Strut
Details
     

 03-09-2012
3.50
Left Wing Work
Details
       

 03-07-2012
3.00
Cleaning and Painting Parts
Details
       

 03-06-2012
2.00
Left Wing Dis-Assembly
Details
       

 03-05-2012
2.00
Left Wing Work
Details
       

 03-04-2012
2.00
Left Wing Work
Details
       

 03-02-2012
4.00
Right Wing Finish Up Work
Details
     

 03-01-2012
2.00
Right wing aileron mount work
Details
     

 03-01-2012
2.00
Right wing aileron mount work
Details
     

 02-29-2012
2.20
Drag/Anti-Drag Wire Work
Details
     

 02-23-2012
1.30
Compression Strut and Tip Bow Work
Details

 02-22-2012
2.00
Finish Compression Strut Work
Details
       

 02-21-2012
4.00
Wing Parts Clean-up and Wing Tip Work.
Details
       

 02-16-2012
2.50
Wing Tip and Paint Work
Details

 02-15-2012
4.00
Strut Attach Compression Strut Work
Details
     

 02-11-2012
2.50
Wing Tip & Parts Clean-up
Details

 02-10-2012
3.00
Rib Repairs and Compression Strut Work
Details
       

 02-08-2012
2.50
Rib Repair Work
Details
       

 02-07-2012
4.30
Wing Repair and Clean-up
Details
       

 02-05-2012
3.20
Wing Assembly Work
Details
       

 02-04-2012
4.00
Wing Clean-up and Repair
Details
     

 01-29-2012
3.00
Right Wing Damage Assesment
Details
       

 01-28-2012
3.00
Wing Cover Removal
Details
       

 01-27-2012
1.50
Wing Teardown
Details
       

 01-26-2012
2.00
Starting Wing Work
Details
       

 01-21-2012
3.00
Moving Fuselage & Cleaning Hangar
Details
     

 01-20-2012
4.00
Wheel and Cockpit Work
Details
       

 01-12-2012
2.50
Nutplate Installation
Details
       

 01-10-2012
3.50
Inspection Panel Nutplates
Details

 01-08-2012
2.50
Attaching Landing Gear to Fuselage
Details
       

 01-07-2012
3.50
Fuselage Priming
Details
       

 01-02-2012
2.00
Inspection Hole Covers
Details

 01-01-2012
2.30
Fuselage Fabric Work
Details
     

 12-31-2011
3.00
More Primer Work
Details

 12-30-2011
4.00
EkoFill Application
Details

 12-23-2011
4.00
Fuselage EkoFill Prep Work
Details
       

 12-21-2011
1.50
Landing Gear Work
Details
     

 12-19-2011
2.00
Fuselage details
Details
     

 12-13-2011
2.50
Odds & Ends Finish Up
Details
       

 12-11-2011
2.00
Left Aileron Finish-Up
Details

 12-10-2011
3.00
Aileron & Brake Work
Details

 12-07-2011
1.20
Aileron Tape Work
Details
     

 12-05-2011
1.50
Left Aileron Work
Details
     

 12-04-2011
2.00
Left Aileron Work
Details
     

 12-03-2011
2.70
Left Aileron Covering
Details
       

 11-29-2011
1.50
Right Aileron and Landing Gear Work
Details

 11-27-2011
3.20
Aileron & Cabin Door Work
Details
       

 11-26-2011
2.20
Aileron and Landing Gear Work
Details
       

 11-25-2011
2.70
Aileron and Gear Leg Work
Details
     

 11-23-2011
3.50
Aileron Taping
Details
       

 11-22-2011
3.70
Right Aileron Work
Details
       

 11-21-2011
2.00
Aileron Covering
Details
     

 11-19-2011
3.00
Cabin Door & Aileron Work
Details
     

 11-18-2011
1.50
Aileron Clean-up and Priming
Details
     

 11-17-2011
2.50
Aileron Clean-up
Details
       

 11-16-2011
2.50
Aileron Clean-up
Details
       

 11-15-2011
2.50
EkoFill Brushing Finish Up
Details

 11-13-2011
2.50
Ekofill Application
Details
     

 11-12-2011
1.00
EkoFill Work
Details

 11-11-2011
3.50
Stab stitching and EkoFil work
Details
       

 11-10-2011
3.00
Finishing Fuselage Tapes
Details
       

 11-09-2011
1.50
Tape Work
Details

 11-05-2011
2.50
Tape and Inspection Ring Work
Details
       

 11-04-2011
2.20
Tape & Inspection Plates
Details

 11-03-2011
3.20
Tape and Inspection Frame Work
Details
       

 11-01-2011
2.50
Tape Application Work
Details
       

 10-31-2011
2.20
Fuselage Tape Installation
Details

 10-30-2011
4.20
Fabric Tape Installation
Details
       

 10-27-2011
3.00
Top Cabin Covering
Details
       

 10-21-2011
2.20
Fabric Shrinking
Details
       

 10-18-2011
3.50
Left Side Fabric Work
Details
       

 10-17-2011
4.00
Fuselage Fabric Work
Details
       

 10-15-2011
1.40
Parking Brake Work
Details
     

 10-14-2011
3.00
Cockpit Brake Work
Details
       

 10-13-2011
2.50
Fuselage Covering Work
Details
     

 10-11-2011
2.00
Fabric Shrinking
Details
       

 10-07-2011
2.00
Continued Work on Right Side Covering
Details

 10-04-2011
2.50
Side Panel Covering
Details
       

 10-02-2011
2.50
Covering Side Panels
Details
     

 10-01-2011
269.50
Initial work to Project
Details