Date
|
Hours
|
Work Log Summary
|
Details
|
10-08-2023
|
3.00
|
finished camlock installs, raised tailwheel to lev
|
Details
|
|
|
10-07-2023
|
3.00
|
started on the first few camlock fasteners
|
Details
|
|
|
10-05-2023
|
3.00
|
reassemble cowling on airframe, evaluate hole move
|
Details
|
|
|
10-04-2023
|
4.00
|
moving the fourth inlet hole farther out to starbo
|
Details
|
|
|
10-03-2023
|
3.00
|
move port side inlet hole on bottom cowling
|
Details
|
|
|
10-01-2023
|
3.00
|
move port side air inlet hole
|
Details
|
|
|
09-30-2023
|
2.00
|
evaluate starboard hole move, plan port move
|
Details
|
|
|
09-27-2023
|
5.00
|
revising the cowl to move inlet holes outboard
|
Details
|
|
|
09-24-2023
|
4.00
|
details of cowl and baffles interface
|
Details
|
|
|
09-23-2023
|
4.00
|
planning for alternator cooling
|
Details
|
|
|
09-22-2023
|
4.00
|
input air flow ramp design
|
Details
|
|
|
09-21-2023
|
4.00
|
attached starboard side aluminum bulkhead
|
Details
|
|
|
09-19-2023
|
4.00
|
making templates for aft bulkhead
|
Details
|
|
|
09-18-2023
|
3.00
|
templates for patch pieces
|
Details
|
|
|
09-17-2023
|
3.00
|
filling in gaps in aft bulkhead
|
Details
|
|
|
09-16-2023
|
4.00
|
aft bulkhead, pressure plenum
|
Details
|
|
|
09-13-2023
|
5.00
|
more work on cylinder baffling
|
Details
|
|
|
09-12-2023
|
4.00
|
more work on cylinder baffling
|
Details
|
|
|
09-11-2023
|
3.00
|
more work on cylinder baffling
|
Details
|
|
|
09-09-2023
|
3.00
|
more work on cylinder baffling
|
Details
|
|
|
09-08-2023
|
3.00
|
cut first aluminum for aft bulkhead of plenum
|
Details
|
|
|
09-05-2023
|
4.00
|
continuing work on engine baffles
|
Details
|
|
|
09-04-2023
|
4.00
|
continue cylinder baffle work
|
Details
|
|
|
09-02-2023
|
2.00
|
rig up lights to illuminate underside of engine
|
Details
|
|
|
09-02-2023
|
2.00
|
building another bracket for securing CH baffle
|
Details
|
|
|
09-01-2023
|
4.00
|
finally got all four of the main C/H baffles set i
|
Details
|
|
|
08-31-2023
|
3.00
|
fitted baffles around port side cylinder head
|
Details
|
|
|
08-30-2023
|
3.00
|
more fitting and bracket making for cylinder heads
|
Details
|
|
|
08-28-2023
|
4.00
|
continuing bracket development for baffles
|
Details
|
|
|
08-26-2023
|
3.00
|
details of attaching baffles to the engine
|
Details
|
|
|
08-24-2023
|
4.00
|
continuing work on cylinder baffling
|
Details
|
|
|
08-23-2023
|
4.00
|
continued work on cylinder baffling
|
Details
|
|
|
08-21-2023
|
4.00
|
flow divider for cylinder head airflow
|
Details
|
|
|
08-20-2023
|
4.00
|
pre--forming cylinder barrell baffles
|
Details
|
|
|
08-19-2023
|
4.00
|
making patterns for baffles
|
Details
|
|
|
08-14-2023
|
3.00
|
finally got 50 PSI indication on oil pressure gaug
|
Details
|
|
|
08-12-2023
|
4.00
|
attempting powerplant resurrection
|
Details
|
|
|
08-11-2023
|
4.00
|
evaluation and planning next steps on cowling
|
Details
|
|
|
08-10-2023
|
3.00
|
worked cowl out of mold
|
Details
|
|
|
08-10-2023
|
2.00
|
cutting openings for exhaust stacks in cowl
|
Details
|
|
|
08-09-2023
|
4.00
|
full three-ply layup of bottom cowl
|
Details
|
|
|
08-08-2023
|
7.00
|
applied mold release agents, laid out tools & clot
|
Details
|
|
|
08-07-2023
|
8.00
|
finalized the shape of mold, cut out cloth for lay
|
Details
|
|
|
08-06-2023
|
6.00
|
continuing to refine shape of mold
|
Details
|
|
|
08-05-2023
|
4.00
|
shaped spray foam, added microballoons
|
Details
|
|
|
08-04-2023
|
4.00
|
adjustments to foam filling
|
Details
|
|
|
08-03-2023
|
3.00
|
applying mods to the mold
|
Details
|
|
|
08-02-2023
|
4.00
|
planning mold modifications
|
Details
|
|
|
08-01-2023
|
4.00
|
evaluating bottom cowl mold
|
Details
|
|
|
07-31-2023
|
4.00
|
planning for bottom cowling
|
Details
|
|
|
07-29-2023
|
100.00
|
catching up on neglected paperwork
|
Details
|
|
|
07-28-2023
|
3.00
|
removing cowl from mold
|
Details
|
|
|
07-27-2023
|
4.00
|
full 3-ply lay-up of top cowl
|
Details
|
|
|
07-26-2023
|
7.00
|
prepped mold with release wax and PVA
|
Details
|
|
|
07-25-2023
|
3.00
|
screwed mold into cradle and faired over screwhead
|
Details
|
|
|
07-24-2023
|
4.00
|
applied hi-build primer to interior of mold
|
Details
|
|
|
07-23-2023
|
4.00
|
rehearsing the movement of pre-pregged plies
|
Details
|
|
|
07-22-2023
|
3.00
|
detailed planning for cutting fiberglass cloth pli
|
Details
|
|
|
07-18-2023
|
4.00
|
continued refinement of top cowl mold
|
Details
|
|
|
07-17-2023
|
2.00
|
sanding more defects, microballooning more area
|
Details
|
|
|
07-16-2023
|
3.00
|
more filling and fairing on mold using microballoo
|
Details
|
|
|
07-11-2023
|
4.00
|
add microballoons around air inlet openings
|
Details
|
|
|
07-10-2023
|
2.00
|
reinforce mold openings with more fiberglass
|
Details
|
|
|
07-10-2023
|
2.00
|
completed first layup of three plies in one sessio
|
Details
|
|
|
07-09-2023
|
8.00
|
reinforce air inlets and crankshaft opening in mol
|
Details
|
|
|
07-08-2023
|
5.00
|
more detailing on the mold for top cowl
|
Details
|
|
|
07-07-2023
|
4.00
|
continuing mold preparation for top cowl
|
Details
|
|
|
07-06-2023
|
2.00
|
sanding the microballoons, planning next steps
|
Details
|
|
|
07-06-2023
|
2.00
|
cut out plywood for mold cradle, planned for reinf
|
Details
|
|
|
07-05-2023
|
4.00
|
evaluate microballoon application from yesterday
|
Details
|
|
|
07-04-2023
|
3.00
|
begin filling and fairing defects in top cowling
|
Details
|
|
|
07-03-2023
|
3.00
|
review fit of cowl/model over engine, plan next st
|
Details
|
|
|
07-02-2023
|
4.00
|
removal of cowl plug shaping material from engine
|
Details
|
|
|
07-01-2023
|
5.00
|
Removal of the cowl/mold from the plug
|
Details
|
|
|
06-30-2023
|
4.00
|
applied third layer of fiberglass to mold
|
Details
|
|
|
06-27-2023
|
3.00
|
applied second layer of fiberglass to mold
|
Details
|
|
|
06-26-2023
|
3.00
|
make preparations for second layer of mold
|
Details
|
|
|
06-25-2023
|
2.00
|
review & evaluate first layer of fiberglass
|
Details
|
|
|
06-24-2023
|
5.00
|
first layer of fiberglass applied to plug mold
|
Details
|
|
|
06-23-2023
|
6.00
|
cutting fabric and applying PVA to waxed plug mold
|
|
|
|
06-22-2023
|
6.00
|
covered the gorilla tape with clear packaging tape
|
|
|
|
06-21-2023
|
7.00
|
fabric fitting, fiberglass test, plug mold taping
|
|
|
|
06-20-2023
|
8.00
|
fitting the bias cut layers of template fabric
|
|
|
|
06-19-2023
|
5.00
|
cutting the first three pieces of fiberglass fabri
|
|
|
|
06-17-2023
|
5.00
|
draping fabric pieces
|
|
|
|
06-16-2023
|
5.00
|
planning fabric sizing and shaping
|
|
|
|
06-15-2023
|
5.00
|
detailing spots on plug mold
|
|
|
|
06-14-2023
|
5.00
|
more shaping and refining of the plug mold
|
|
|
|
06-13-2023
|
5.00
|
experimenting with fillers
|
|
|
|
06-12-2023
|
5.00
|
continue shaping the plug mold.
|
|
|
|
06-11-2023
|
5.00
|
back to shaping the plug mold
|
|
|
|
06-10-2023
|
5.00
|
setting up for a test patch of fiberglass
|
|
|
|
06-09-2023
|
5.00
|
previewing cowl shape with car cover fabric
|
|
|
|
06-08-2023
|
5.00
|
refining the shape of spray foam
|
|
|
|
06-07-2023
|
5.00
|
more spray foam application
|
|
|
|
05-30-2023
|
5.00
|
continuing with spray foam application
|
|
|
|
05-29-2023
|
5.00
|
applying the spray foam to the hardware cloth
|
|
|
|
05-28-2023
|
5.00
|
adding spray foam to hardware cloth
|
|
|
|
05-27-2023
|
5.00
|
filling out mold shape with spray foam
|
|
|
|
05-26-2023
|
5.00
|
applying duct tape over hardware cloth
|
|
|
|
05-25-2023
|
5.00
|
shaping hardware cloth around plywood cheeks
|
|
|
|
05-24-2023
|
5.00
|
beginning the hardware cloth shaping
|
|
|
|
05-23-2023
|
5.00
|
visualizing cowl shape
|
|
|
|
05-22-2023
|
3.00
|
wrapped the engine in some test fabric to see outl
|
Details
|
|
|
05-22-2023
|
3.00
|
adding more support to hardware cloth
|
Details
|
|
|
05-21-2023
|
3.00
|
working on skirt for aft landing area of cowl
|
Details
|
|
|
05-21-2023
|
3.00
|
firming up skirt around upper edge of firewall
|
Details
|
|
|
05-20-2023
|
5.00
|
made new forward plywood front for cowl plug
|
Details
|
|
|
05-14-2023
|
4.00
|
induction air filter box
|
Details
|
|
|
05-13-2023
|
8.00
|
research and study on fiberglassing technique
|
Details
|
|
|
05-11-2023
|
4.00
|
transition to plywood for openings template
|
Details
|
|
|
05-10-2023
|
4.00
|
fine tuning template for cowl openings
|
Details
|
|
|
05-09-2023
|
4.00
|
made poster board template of cowl openings
|
Details
|
|
|
05-08-2023
|
4.00
|
remove plenum top, add firewall skirt
|
Details
|
|
|
05-07-2023
|
4.00
|
installed prop and skullcap spinner
|
Details
|
|
|
05-04-2023
|
4.00
|
first began thinking and planning about cowling
|
Details
|
|
|
04-25-2023
|
5.00
|
completed fuel line fabrication
|
Details
|
|
|
04-24-2023
|
2.00
|
attempt fabrication of fuel line gascolator to car
|
Details
|
|
|
04-22-2023
|
4.00
|
clean up workbench and hardware storage
|
Details
|
|
|
04-17-2023
|
4.00
|
battery shelf trim and remount
|
Details
|
|
|
04-01-2023
|
8.00
|
mounting engine on firewall
|
Details
|
|
|
03-28-2023
|
3.00
|
motor mount and battery shelf
|
Details
|
|
|
03-26-2023
|
6.00
|
stress testing motor mount
|
Details
|
|
|
03-24-2023
|
6.00
|
finished welding on motor mount
|
Details
|
|
|
03-23-2023
|
5.00
|
continuing welding on engine mount
|
Details
|
|
|
03-22-2023
|
5.00
|
second test fitting of the motor mount
|
Details
|
|
|
03-21-2023
|
6.00
|
second round of distributed intermittent welds
|
Details
|
|
|
03-18-2023
|
6.00
|
test fit motor mount
|
Details
|
|
|
03-17-2023
|
8.00
|
Tack welding on the motor mount
|
Details
|
|
|
03-16-2023
|
6.00
|
setting up engine mount feet in welding fixture
|
Details
|
|
|
03-15-2023
|
4.00
|
engine mount welding
|
Details
|
|
|
03-14-2023
|
2.00
|
worked on setting up the welding fixture
|
Details
|
|
|
03-14-2023
|
3.00
|
elevator tip rib prep, battery box mounting prep
|
Details
|
|
|
03-13-2023
|
4.00
|
gascolator finally mounted
|
Details
|
|
|
03-12-2023
|
4.00
|
preparing for mounting the gascolator
|
Details
|
|
|
03-11-2023
|
4.00
|
right wing tip and fuel system
|
Details
|
|
|
03-05-2023
|
5.00
|
finished left wingtip
|
Details
|
|
|
03-04-2023
|
4.00
|
nut plates at wing tip, cutting 4130 for engine mo
|
Details
|
|
|
03-03-2023
|
5.00
|
eyebolt cotter pins, fuel tank supports, level att
|
Details
|
|
|
03-02-2023
|
5.00
|
eyebolts, motor mount welding fixture
|
Details
|
|
|
03-01-2023
|
4.00
|
first pass at empty weight center of gravity
|
Details
|
|
|
02-28-2023
|
4.00
|
test fit engine to fuselage
|
Details
|
|
|
02-27-2023
|
3.00
|
right wingtip final rivetting
|
Details
|
|
|
02-25-2023
|
10.00
|
left wing tip final rivetting
|
Details
|
|
|
02-24-2023
|
9.00
|
left wingtip finishing touches
|
Details
|
|
|
02-23-2023
|
5.00
|
fuel tank fiddling, left wingtip planning, cleanup
|
Details
|
|
|
02-22-2023
|
9.00
|
right wingtip nearly done
|
Details
|
|
|
02-21-2023
|
6.00
|
right wing tip
|
Details
|
|
|
02-20-2023
|
6.00
|
tech counsellor visit, wingtip disassembly, fuel s
|
Details
|
|
|
02-18-2023
|
8.00
|
finally got all four aileron control rods cut into
|
Details
|
|
|
02-17-2023
|
4.00
|
cutting metal for aileron control rods
|
Details
|
|
|
02-15-2023
|
6.00
|
continued baby steps on aileron controls
|
Details
|
|
|
02-14-2023
|
7.00
|
aileron belcranks in final form
|
Details
|
|
|
02-13-2023
|
6.00
|
moving forward with aileron controls
|
Details
|
|
|
02-12-2023
|
4.00
|
left side aileron
|
Details
|
|
|
02-10-2023
|
6.00
|
aileron control rods
|
Details
|
|
|
02-04-2023
|
6.00
|
more struggles with aileron pushrods
|
Details
|
|
|
02-03-2023
|
6.00
|
mockup of aileron control pushrods in wooden dowel
|
Details
|
|
|
02-02-2023
|
6.00
|
aileron controls and fuel tank fitting
|
Details
|
|
|
02-01-2023
|
8.00
|
multiple miscellaneous small tasks
|
Details
|
|
|
01-27-2023
|
4.00
|
hangar arrangement and wingtip fittings
|
Details
|
|
|
01-26-2023
|
4.00
|
continued rearrangement of hangar
|
Details
|
|
|
01-25-2023
|
8.00
|
mounted wings fuselage
|
Details
|
|
|
01-24-2023
|
7.00
|
rudder pedal subassembly rivetted, cables connecte
|
Details
|
|
|
01-23-2023
|
7.00
|
pedals clecoed into place
|
Details
|
|
|
01-22-2023
|
4.00
|
fine tuning the attachment of master cylinder
|
Details
|
|
|
01-21-2023
|
6.00
|
modelling multiple approaces to rudder/brake insta
|
Details
|
|
|
01-20-2023
|
3.00
|
rudder pedal / brake pedal inventory
|
Details
|
|
|
01-17-2023
|
1.00
|
attach eyebolts and chains for tailwheel steering
|
Details
|
|
|
01-16-2023
|
6.00
|
vertical fin disassembly, deburring, fairing prep
|
Details
|
|
|
01-16-2023
|
6.00
|
complete vertical fin rivetting
|
Details
|
|
|
01-15-2023
|
3.00
|
rudder reassembly and final rivetting
|
Details
|
|
|
01-15-2023
|
3.00
|
rudder horn and disassembly for deburring
|
Details
|
|
|
01-14-2023
|
2.00
|
more drilling and clecoing on the rudder
|
Details
|
|
|
01-14-2023
|
3.00
|
connecting rudder cable to rudder horn
|
Details
|
|
|
01-10-2023
|
4.00
|
drilled and clecoed top rib of vertical fin
|
Details
|
|
|
01-08-2023
|
4.00
|
working on top of vertical fin
|
Details
|
|
|
01-07-2023
|
3.00
|
finalize shape and position of bottom rib of fin
|
Details
|
|
|
01-07-2023
|
4.00
|
drill and cleco vertical fin skin
|
Details
|
|
|
01-06-2023
|
6.00
|
adjustments to fin skin fitting
|
Details
|
|
|
01-04-2023
|
4.00
|
final shaping, drilling and clecoing rudder skins
|
Details
|
|
|
01-04-2023
|
4.00
|
final shaping and bending of rudder ribs
|
Details
|
|
|
01-03-2023
|
6.00
|
continuing rudder fabrication
|
Details
|
|
|
01-02-2023
|
5.00
|
Rudder fabrication
|
Details
|
|
|
01-01-2023
|
8.00
|
comparing skin fit on fin to skin fit on rudder
|
Details
|
|
|
12-31-2022
|
8.00
|
rudder spar fabrication
|
Details
|
|
|
12-30-2022
|
8.00
|
mounting horizonal stabilizer and closing tailcone
|
Details
|
|
|
12-29-2022
|
8.00
|
finalize solution to control hangup on elevator
|
Details
|
|
|
12-12-2022
|
3.00
|
trim ends and plan fitting of fiberglass tips
|
Details
|
|
|
12-12-2022
|
3.00
|
fabricate counterweight ribs
|
Details
|
|
|
12-04-2022
|
4.00
|
working on attachment of fin spars to bulkhead F10
|
Details
|
|
|
12-01-2022
|
7.00
|
rivetting elevators to horizontal stabilizer
|
Details
|
|
|
11-30-2022
|
3.00
|
side plates for elevator horn
|
Details
|
|
|
11-30-2022
|
10.00
|
finish rivetting the horizontal stabilizer
|
Details
|
|
|
11-28-2022
|
7.00
|
tailcone access panel
|
Details
|
|
|
11-27-2022
|
8.00
|
horizonal stabilizer skinned and drilled
|
Details
|
|
|
11-26-2022
|
6.00
|
horizontal stabilizer skin fitting
|
Details
|
|
|
11-25-2022
|
5.00
|
more elevator work
|
Details
|
|
|
11-24-2022
|
4.00
|
continuing work on elevators
|
Details
|
|
|
11-23-2022
|
4.00
|
more working to eliminate elevator twist
|
Details
|
|
|
11-22-2022
|
4.00
|
working on elevator twist
|
Details
|
|
|
11-19-2022
|
5.00
|
started third bend and clecoed elevator skins
|
Details
|
|
|
11-19-2022
|
5.00
|
cut out elevator skins and made first two bends
|
Details
|
|
|
11-18-2022
|
5.00
|
working on ribs for elevators
|
Details
|
|
|
11-17-2022
|
2.00
|
preparing plates for elevator horn
|
Details
|
|
|
11-17-2022
|
5.00
|
make upper rib and assemble to fin spar
|
Details
|
|
|
11-16-2022
|
5.00
|
fabricate spar for vertical fin
|
Details
|
|
|
11-14-2022
|
7.00
|
continued work on empennage components
|
Details
|
|
|
11-06-2022
|
6.00
|
forward spar of horizontal stabilizer
|
Details
|
|
|
11-05-2022
|
8.00
|
forward spar of horizontal stabilizer
|
Details
|
|
|
11-02-2022
|
1.00
|
working on control system
|
Details
|
|
|
05-31-2020
|
5.00
|
working on elevator pushrod and rudder cables
|
Details
|
|
|
05-30-2020
|
9.00
|
front spar of vertical fin fitted to fuselage
|
Details
|
|
|
05-29-2020
|
8.00
|
working control system
|
Details
|
|
|
05-28-2020
|
7.00
|
side skins by tail wheel
|
Details
|
|
|
05-27-2020
|
8.00
|
side skins above tailwheel
|
Details
|
|
|
05-22-2020
|
7.00
|
clecoed F12 and test fit tail wheel
|
Details
|
|
|
05-21-2020
|
8.00
|
drilled and clecoed new F10 bulkhead
|
Details
|
|
|
05-20-2020
|
8.00
|
left side brake cable installed
|
Details
|
|
|
05-19-2020
|
4.00
|
debur left side fuse skin and trim to final size
|
Details
|
|
|
05-18-2020
|
5.00
|
fabricate tail spring pivot
|
Details
|
|
|
05-17-2020
|
7.00
|
made form block for F10 and formed F10
|
Details
|
|
|
05-16-2020
|
7.00
|
up drilled left side skin rivet holes plus new F10
|
Details
|
|
|
05-14-2020
|
6.00
|
trimming fuselage skin and longerons
|
Details
|
|
|
05-12-2020
|
6.00
|
work on fuselage skin and bulkheads
|
Details
|
|
|
05-11-2020
|
4.00
|
planning F 11 and F 12 installation
|
Details
|
|
|
05-04-2020
|
4.00
|
worked on cooling air scoop and cylinder baffles
|
Details
|
|
|
05-02-2020
|
4.00
|
worked on cooling air scoop and cylinder baffles
|
Details
|
|
|
04-30-2020
|
4.00
|
spun up new engine to oil cylinder walls.
|
Details
|
|
|
04-29-2020
|
6.00
|
completed pull tests on Motor Mount 3.0
|
Details
|
|
|
04-27-2020
|
6.00
|
adapted server rack as pull test fixture
|
Details
|
|
|
04-19-2020
|
3.00
|
continued work on control stick and rudder pedals
|
Details
|
|
|
04-19-2020
|
3.00
|
continued study of Baby Ace engine for hints
|
Details
|
|
|
04-18-2020
|
6.00
|
finish welding on Motor Mount 3.0
|
Details
|
|
|
04-17-2020
|
5.00
|
Welding on Motor Mount 3.0
|
Details
|
|
|
04-13-2020
|
6.00
|
continued work on brake pedals and MM 3.0
|
Details
|
|
|
04-12-2020
|
3.00
|
studying Baby Ace engine installation for hints
|
Details
|
|
|
04-10-2020
|
6.00
|
cutting out brake pedal toe brakes
|
Details
|
|
|
04-09-2020
|
6.00
|
Welding on rudder pedals and control stick belcran
|
Details
|
|
|
04-06-2020
|
4.00
|
Welding on rudder pedals and belcrank
|
Details
|
|
|
04-05-2020
|
6.00
|
finished welding on Motor Mount 2.0
|
Details
|
|
|
04-04-2020
|
6.00
|
continued welding on motor mount 2.0
|
Details
|
|
|
04-03-2020
|
8.00
|
modified assembly jig and continued welding MM2.0
|
Details
|
|
|
04-01-2020
|
12.00
|
continued struggles with motor mount welding
|
Details
|
|
|
03-31-2020
|
5.00
|
still struggling with motor mount welding
|
Details
|
|
|
03-30-2020
|
6.00
|
developing confined space weld techniques
|
Details
|
|
|
03-29-2020
|
8.00
|
tack welding motor mount members
|
Details
|
|
|
03-28-2020
|
4.00
|
Placed standoffs into assembly jig and aligned it
|
Details
|
|
|
03-28-2020
|
6.00
|
fabricated standoffs for motor mount 2.0
|
Details
|
|
|
03-27-2020
|
6.00
|
prep for motor mount 2.0
|
Details
|
|
|
03-26-2020
|
4.00
|
tried motor mount on firewall
|
Details
|
|
|
03-25-2020
|
8.00
|
took motor mount out of assembly jig and tried on
|
Details
|
|
|
03-24-2020
|
4.00
|
Inspect new engine, fit propeller
|
Details
|
|
|
03-23-2020
|
14.00
|
picked up engine
|
Details
|
|
|
03-21-2020
|
6.00
|
tacking on the motor mount
|
Details
|
|
|
03-18-2020
|
10.00
|
finishing and installing axels
|
Details
|
|
|
03-17-2020
|
8.00
|
fabricating axels
|
Details
|
|
|
03-16-2020
|
6.00
|
brake caliper fitting to mounting brackets
|
Details
|
|
|
03-15-2020
|
8.00
|
Assembled wheels, brake discs, tires & tubes
|
Details
|
|
|
03-14-2020
|
6.00
|
Wheels and axels
|
Details
|
|
|
03-13-2020
|
10.00
|
finish fitting aft left side fuselage skins
|
Details
|
|
|
03-12-2020
|
10.00
|
left side aft skin on fuselage
|
Details
|
|
|
03-10-2020
|
10.00
|
right side aft fuselage skins
|
Details
|
|
|
03-09-2020
|
6.00
|
continue fuselage skin fitting
|
Details
|
|
|
03-08-2020
|
8.00
|
continuing to fit aft fuselage skins
|
Details
|
|
|
03-04-2020
|
10.00
|
deburred and rivetted top skin of aft fuselage
|
Details
|
|
|
03-01-2020
|
10.00
|
deburred and riveted bottom skin
|
Details
|
|
|
02-29-2020
|
10.00
|
rebuild bulkhead F 9
|
Details
|
|
|
02-23-2020
|
5.00
|
continuing fitting skin of aft fuselage
|
Details
|
|
|
02-22-2020
|
9.00
|
mounted main landing gear on fuselage
|
Details
|
|
|
02-12-2020
|
8.00
|
bottom skin forming
|
Details
|
|
|
02-11-2020
|
10.00
|
finished fitting top skin, cut out bottom skin
|
Details
|
|
|
02-10-2020
|
8.00
|
continue forming top skin to bulkheads
|
Details
|
|
|
02-09-2020
|
8.00
|
top skin of aft fuselage
|
Details
|
|
|
02-08-2020
|
8.00
|
set up aft bulkheads
|
Details
|
|
|
02-02-2020
|
8.00
|
forward fuselage to end of table, controls work
|
Details
|
|
|
01-31-2020
|
4.00
|
cleaning and orgainzing
|
Details
|
|
|
01-29-2020
|
6.00
|
Drilled and rivetted F3 to vertical angle
|
Details
|
|
|
01-27-2020
|
8.00
|
torqued gusset bolts, installed F3 bulkhead
|
Details
|
|
|
01-25-2020
|
7.00
|
seat back rivetting, gusset bolting, machine screw
|
Details
|
|
|
01-17-2020
|
9.00
|
completed installation of F5 bulkheads
|
Details
|
|
|
01-16-2020
|
4.00
|
checking and fine-tuning alignment and levelling
|
Details
|
|
|
12-24-2019
|
8.00
|
bolt upper longerons to firewall, install angle at
|
Details
|
|
|
12-21-2019
|
6.00
|
attachment and bracing of forward longerons
|
Details
|
|
|
12-18-2019
|
6.00
|
fabricate upper forward longerons
|
Details
|
|
|
12-17-2019
|
9.00
|
lower longerons attached
|
Details
|
|
|
12-14-2019
|
8.00
|
stiffened firewall, fabricated lower longerons
|
Details
|
|
|
12-09-2019
|
4.00
|
welding on control stick
|
Details
|
|
|
12-08-2019
|
4.00
|
beginning bulkhead setup
|
Details
|
|
|
12-02-2019
|
4.00
|
cleared assembly table and set up tailcone jig
|
Details
|
|
|
11-30-2019
|
4.00
|
formed firewall, pulled wings off
|
Details
|
|
|
11-29-2019
|
4.00
|
Bulkheads F3 and F4
|
Details
|
|
|
11-27-2019
|
5.00
|
Final rivet F9, form F11 and F12
|
Details
|
|
|
11-25-2019
|
6.00
|
forming and assembly of bulkhead F9
|
Details
|
|
|
11-22-2019
|
8.00
|
cut out aluminum blanks for bulkhead components
|
Details
|
|
|
11-21-2019
|
6.00
|
fabricate bulkhead F10
|
Details
|
|
|
11-18-2019
|
8.00
|
Fuselage bulkheads f2 and f8
|
Details
|
|
|
11-10-2019
|
6.00
|
bulkhead F2 and control stick
|
Details
|
|
|
11-09-2019
|
4.00
|
cutting slot in control stick
|
Details
|
|
|
11-08-2019
|
8.00
|
forming and fabricating bulkhead F6
|
Details
|
|
|
11-06-2019
|
6.00
|
formed forward floor supports and cut out aluminum
|
Details
|
|
|
11-05-2019
|
5.00
|
preparing practice pieces and maybe one real piece
|
Details
|
|
|
11-03-2019
|
8.00
|
final test of fitting wings to center section befo
|
Details
|
|
|
11-01-2019
|
4.00
|
more welding practice
|
Details
|
|
|
10-31-2019
|
4.00
|
welding practice
|
Details
|
|
|
10-29-2019
|
8.00
|
welding motor mount standoffs
|
Details
|
|
|
10-28-2019
|
8.00
|
preparation and practice for welding
|
Details
|
|
|
10-27-2019
|
8.00
|
motor mount fixture
|
Details
|
|
|
10-26-2019
|
8.00
|
starting a fixture for making the motor mount
|
Details
|
|
|
10-25-2019
|
6.00
|
motor mount standoffs welding practice
|
Details
|
|
|
10-24-2019
|
6.00
|
steel for control system
|
Details
|
|
|
10-10-2019
|
10.00
|
finished cutting out bulkhead blanks, added rib to
|
Details
|
|
|
10-09-2019
|
6.00
|
cut out aluminum blanks for B/H 2 4 9 10
|
Details
|
|
|
10-07-2019
|
6.00
|
verified correct nuts on wing mounts, fab B/H #7
|
Details
|
|
|
10-06-2019
|
5.00
|
fabricated remaining ribs for center section
|
Details
|
|
|
10-05-2019
|
5.00
|
reassembled wings to center section
|
Details
|
|
|
10-04-2019
|
8.00
|
rearranged work space
|
Details
|
|
|
09-30-2019
|
8.00
|
cut out fuselage bulkhead blanks and top and botto
|
Details
|
|
|
09-29-2019
|
10.00
|
continuing work on form blocks and aluminum blanks
|
Details
|
|
|
09-28-2019
|
2.00
|
bought a bandsaw for form block shaping
|
Details
|
|
|
09-27-2019
|
8.00
|
cut out MDF for fuselage bulkhead blocks
|
Details
|
|
|
09-25-2019
|
10.00
|
left wingtip coming along well
|
Details
|
|
|
09-24-2019
|
3.00
|
preparing skins for left wing tip
|
Details
|
|
|
09-24-2019
|
3.00
|
continuing good progress on left wingtip
|
Details
|
|
|
09-23-2019
|
8.00
|
good progress on right wingtip
|
Details
|
|
|
09-19-2019
|
5.00
|
top and bottom skins, trailing edge temporarily in
|
Details
|
|
|
09-18-2019
|
10.00
|
fitting wingtip skins, leading edge and trailing e
|
Details
|
|
|
09-17-2019
|
8.00
|
riveted right wingtip spar to right main spar
|
Details
|
|
|
09-16-2019
|
8.00
|
forming ribs and spars
|
Details
|
|
|
09-15-2019
|
5.00
|
finished initial work on center section, setting u
|
Details
|
|
|
09-13-2019
|
4.00
|
left aileron completed and hung on wing
|
Details
|
|
|
09-12-2019
|
5.00
|
right aileron completed and hung on wing
|
Details
|
|
|
09-11-2019
|
5.00
|
bottom skin of center section riveted on
|
Details
|
|
|
09-09-2019
|
6.00
|
center section bottom skin
|
Details
|
|
|
09-08-2019
|
6.00
|
seat pan finally riveted
|
Details
|
|
|
09-07-2019
|
6.00
|
substructure under seat pan
|
Details
|
|
|
09-06-2019
|
7.00
|
continued test fitting and refinement of seat ribs
|
Details
|
|
|
09-05-2019
|
6.00
|
forming and test fitting seat ribs
|
Details
|
|
|
09-03-2019
|
5.00
|
cut out blanks for center section seat ribs
|
Details
|
|
|
09-02-2019
|
5.00
|
seat rib fabrication
|
Details
|
|
|
09-01-2019
|
3.00
|
installed aft spar carry-through
|
Details
|
|
|
09-01-2019
|
3.00
|
aileron belcrank stops
|
Details
|
|
|
08-31-2019
|
1.00
|
set up a nice level table for center section build
|
Details
|
|
|
08-31-2019
|
3.00
|
hung right aileron on right wing
|
Details
|
|
|
08-28-2019
|
4.00
|
attached left aileron to left wing
|
Details
|
|
|
08-27-2019
|
5.00
|
good progress on the ailerons
|
Details
|
|
|
08-26-2019
|
6.00
|
final riveting on right wing
|
Details
|
|
|
08-25-2019
|
4.00
|
positioning aileron horns on right aileron
|
Details
|
|
|
08-22-2019
|
4.00
|
aileron hinge preparation and aileron horn blank c
|
Details
|
|
|
08-21-2019
|
4.00
|
riveting right wing
|
Details
|
|
|
08-20-2019
|
4.00
|
install aileron control belcrank for right wing
|
Details
|
|
|
08-19-2019
|
9.00
|
right wing final drilling and deburring
|
Details
|
|
|
08-13-2019
|
4.00
|
cut out the firewall
|
Details
|
|
|
08-10-2019
|
4.00
|
Tech Counselor visit plus organizing
|
Details
|
|
|
08-08-2019
|
4.00
|
located and reviewed plans and templates
|
Details
|
|
|
08-07-2019
|
2.00
|
received fiberglass wing tips and elevator tips
|
Details
|
|
|
08-06-2019
|
2.00
|
ailerons
|
Details
|
|
|
08-04-2019
|
4.00
|
workspace organization and aluminum inventory
|
Details
|
|
|
08-03-2019
|
16.00
|
restarting project after years in limbo
|
Details
|
|
|
09-10-2013
|
5.00
|
aileron fabrication
|
Details
|
|
|
09-08-2013
|
5.00
|
aileron fabrication
|
Details
|
|
|
09-03-2013
|
3.00
|
workspace organizing and parts ordering
|
Details
|
|
|
09-02-2013
|
6.00
|
buildt an assembly table for the hangar at the air
|
Details
|
|
|
08-24-2013
|
3.00
|
first bends on aileron skins
|
Details
|
|
|
08-21-2013
|
2.00
|
ailerons preparation
|
Details
|
|
|
08-19-2013
|
1.00
|
document review
|
Details
|
|
|
04-26-2013
|
1.00
|
restartr
|
Details
|
|
|
02-09-2013
|
1.00
|
review and restart project
|
|
|
|
05-03-2012
|
1.00
|
review and restart project
|
Details
|
|
|
05-10-2011
|
2.00
|
reassembled and inverted wing
|
Details
|
|
|
05-08-2011
|
6.00
|
drilling and clecoing along top spar line
|
Details
|
|
|
04-21-2011
|
2.00
|
more rivets into the bottom skins
|
Details
|
|
|
04-20-2011
|
8.00
|
started assembling right wing
|
Details
|
|
|
04-19-2011
|
2.00
|
cutting some steel to make a bending brake.
|
Details
|
|
|
04-18-2011
|
1.00
|
marking bend lines on bottom skins of right wing
|
Details
|
|
|
04-16-2011
|
4.00
|
cutting out aluminum for fuselage and fin
|
Details
|
|
|
04-15-2011
|
8.00
|
riveting spar line and fabricating tip spar
|
Details
|
|
|
04-12-2011
|
2.00
|
making a template for the curves on top of the fin
|
Details
|
|
|
04-11-2011
|
2.00
|
laying out fin for cutting from aluminum sheet
|
Details
|
|
|
04-03-2011
|
6.00
|
cutting 0.020 sheet metal for wing tips and other
|
Details
|
|
|
03-31-2011
|
4.00
|
drilling and riveting remaining spar rivets
|
Details
|
|
|
03-30-2011
|
4.00
|
riveting left wing top skins
|
Details
|
|
|
03-29-2011
|
4.00
|
wing skin deburring
|
Details
|
|
|
03-28-2011
|
4.00
|
wing skin drilling
|
Details
|
|
|
03-27-2011
|
8.00
|
top left wing skins
|
Details
|
|
|
03-22-2011
|
4.00
|
bought 0.020 sheets and angle
|
Details
|
|
|
03-21-2011
|
6.00
|
rivet bottom skins to ribs
|
Details
|
|
|
03-20-2011
|
4.00
|
up drilled rivet holes to # 30
|
Details
|
|
|
03-19-2011
|
8.00
|
stiffener channel for pitot static tubes
|
Details
|
|
|
03-16-2011
|
2.00
|
wing skin bending
|
Details
|
|
|
03-12-2011
|
4.00
|
installed second tie-down ring anchor nut
|
Details
|
|
|
03-11-2011
|
4.00
|
tie down ring anchor nut
|
Details
|
|
|
02-01-2011
|
3.00
|
shaping wing root rib and aileron belcrank mount
|
Details
|
|
|
01-30-2011
|
6.00
|
0.020 main ribs attached to left wing
|
Details
|
|
|
01-22-2011
|
2.00
|
riveting leading edge skin left wing
|
Details
|
|
|
01-21-2011
|
4.00
|
up-drill holes in skin and ribs
|
Details
|
|
|
01-19-2011
|
9.00
|
ribs on spar, skin on ribs
|
Details
|
|
|
01-18-2011
|
1.00
|
drawing stripes on ribs
|
Details
|
|
|
01-17-2011
|
2.00
|
riveting on leading edge skins
|
Details
|
|
|
01-15-2011
|
2.00
|
indentations in aft wing ribs
|
Details
|
|
|
01-11-2011
|
8.00
|
Enlarge rivet holes and begin riveting
|
Details
|
|
|
01-09-2011
|
8.00
|
problems fitting leadindg edge
|
Details
|
|
|
01-08-2011
|
6.00
|
Drilled and clecoed upper surface LE
|
Details
|
|
|
01-07-2011
|
8.00
|
drilled and clecoed end ribs
|
Details
|
|
|
01-06-2011
|
4.00
|
Trial fitting of leading edge skin to ribs
|
Details
|
|
|
01-05-2011
|
6.00
|
attach nose ribs to right spar
|
Details
|
|
|
01-04-2011
|
4.00
|
Aileron control bellcranks
|
Details
|
|
|
01-03-2011
|
1.00
|
Vacuum forming preparations
|
Details
|
|
|
01-03-2011
|
1.00
|
Vacuum forming complete
|
Details
|
|
|
01-03-2011
|
3.00
|
Polish wing leading edge
|
Details
|
|
|
01-03-2011
|
3.00
|
Leading Edge Polish
|
Details
|
|
|
01-01-2011
|
3.00
|
vacuum forming the wing leading edge
|
Details
|
|
|
01-01-2011
|
4.00
|
polishing wing leading edges
|
Details
|
|
|
01-01-2011
|
4.00
|
polishing leading edges
|
Details
|
|
|
12-29-2010
|
8.00
|
final shaping of wing attach fittings
|
Details
|
|
|
12-27-2010
|
2.00
|
material procurement
|
Details
|
|
|
12-26-2010
|
8.00
|
aileron belcranks
|
Details
|
|
|
12-19-2010
|
1.00
|
leading edge skin bending prep
|
Details
|
|
|
12-18-2010
|
8.00
|
step drill wing attach bolt holes
|
Details
|
|
|
12-16-2010
|
3.00
|
aileron belcranks
|
Details
|
|
|
12-15-2010
|
4.00
|
drilled out one of the half-inch holes in wing mou
|
Details
|
|
|
12-14-2010
|
1.00
|
material procurement
|
Details
|
|
|
12-08-2010
|
8.00
|
rib forming
|
Details
|
|
|
12-06-2010
|
4.00
|
rib forming
|
Details
|
|
|
12-04-2010
|
6.00
|
recovered from the drill bit snapped in the hole
|
Details
|
|
|
12-04-2010
|
3.00
|
cut out wing rib blanks
|
Details
|
|
|
12-03-2010
|
6.00
|
snapped a drill bit in center spar
|
Details
|
|
|
12-03-2010
|
3.00
|
hand forming nose ribs to final shape
|
Details
|
|
|
11-29-2010
|
3.00
|
nose rib fine tuning
|
Details
|
|
|
11-29-2010
|
6.00
|
finished spar trim and set dihedral right wing
|
Details
|
|
|
11-28-2010
|
4.00
|
trimming and shaping right wing root
|
Details
|
|
|
11-28-2010
|
4.00
|
cut out leading edge skins and trace ribs
|
Details
|
|
|
11-27-2010
|
3.00
|
flange lightening holes in 9 nose ribs
|
Details
|
|
|
11-26-2010
|
3.00
|
cut the lightening holes in the nose ribs
|
Details
|
|
|
11-23-2010
|
6.00
|
hammer edge flanges into nose rib blanks
|
Details
|
|
|
11-22-2010
|
4.00
|
final shaping of nose rib blanks
|
Details
|
|
|
11-09-2010
|
2.00
|
cutting out nose rib blanks
|
Details
|
|
|
11-07-2010
|
8.00
|
left wing dihedral setting
|
Details
|
|
|
11-06-2010
|
8.00
|
clearance adjust at wing root
|
Details
|
|
|
11-05-2010
|
4.00
|
finish drilling and replacing mis-set rivets
|
Details
|
|
|
11-05-2010
|
4.00
|
dihedral setting
|
Details
|
|
|
11-04-2010
|
3.00
|
riveting spars
|
Details
|
|
|
11-03-2010
|
3.00
|
spar riveting
|
|
|
|
11-02-2010
|
3.00
|
spar riveting
|
|
|
|
11-01-2010
|
2.00
|
spar riveting
|
|
|
|
10-30-2010
|
8.00
|
spar riveting revision to method
|
Details
|
|
|
10-29-2010
|
8.00
|
riveting on spars
|
|
|
|
10-26-2010
|
4.00
|
riveting on spars
|
|
|
|
10-25-2010
|
4.00
|
riveting on spars
|
|
|
|
10-24-2010
|
10.00
|
riveting on spars
|
Details
|
|
|
10-23-2010
|
8.00
|
began riveting on center section spar
|
Details
|
|
|
10-22-2010
|
4.00
|
final preparations for riveting spars
|
Details
|
|
|
10-18-2010
|
4.00
|
mounting and using the arbor press
|
Details
|
|
|
10-17-2010
|
8.00
|
consultations and form block borrowing
|
Details
|
|
|
10-16-2010
|
6.00
|
rivet practice & bucking bar manufacturing
|
Details
|
|
|
10-15-2010
|
2.00
|
inspection
|
Details
|
|
|
10-15-2010
|
4.00
|
cleaning up spars for inspection
|
Details
|
|
|
10-14-2010
|
3.00
|
details on center section
|
Details
|
|
|
10-13-2010
|
4.00
|
steel work on center section
|
Details
|
|
|
10-13-2010
|
3.00
|
making my third riveting practice piece
|
Details
|
|
|
10-12-2010
|
3.00
|
steel work on center section
|
Details
|
|
|
10-11-2010
|
5.00
|
steel work on center section
|
Details
|
|
|
10-11-2010
|
4.00
|
material procurement
|
Details
|
|
|
10-11-2010
|
2.00
|
finish steel work on left spar
|
Details
|
|
|
10-10-2010
|
3.00
|
drive the rivets into practice piece
|
Details
|
|
|
10-09-2010
|
8.00
|
working on left wing spar
|
Details
|
|
|
10-09-2010
|
2.00
|
practice piece for solid rivets in spars
|
Details
|
|
|
10-08-2010
|
8.00
|
tape rivets in spar caps for inspection
|
Details
|
|
|
10-07-2010
|
4.00
|
debur and reassemble right spar
|
Details
|
|
|
10-06-2010
|
3.00
|
finish steel work on right spar
|
Details
|
|
|
10-05-2010
|
8.00
|
add 4130 plates to wing root spar caps
|
Details
|
|
|
10-04-2010
|
8.00
|
a better fixture for rib angle attachment
|
Details
|
|
|
10-03-2010
|
8.00
|
add rib attach angles to spar
|
Details
|
|
|
10-02-2010
|
4.00
|
match drill rib attach angles for center spar
|
Details
|
|
|
10-02-2010
|
4.00
|
debur right spar
|
Details
|
|
|
10-01-2010
|
4.00
|
rivet bucking practice
|
Details
|
|
|
09-30-2010
|
5.00
|
drilled rivet holes in right spar
|
Details
|
|
|
09-29-2010
|
4.00
|
second spar clamped for drilling
|
Details
|
|
|
09-27-2010
|
2.00
|
still polishing out the big bad scratch
|
Details
|
|
|
09-27-2010
|
7.00
|
layout and predrill rivet holes in right spar caps
|
Details
|
|
|
09-26-2010
|
3.00
|
finish drilling and clecoing rivet holes in left s
|
Details
|
|
|
09-26-2010
|
4.00
|
debur & polish spar web
|
Details
|
|
|
09-26-2010
|
1.00
|
bad mistake due to rushing
|
Details
|
|
|
09-25-2010
|
12.00
|
spar assembly
|
Details
|
|
|
09-25-2010
|
1.00
|
setup for drilling rivet holes
|
Details
|
|
|
09-24-2010
|
4.00
|
spar cap finishing
|
Details
|
|
|
09-24-2010
|
6.00
|
more spar cap finishing
|
Details
|
|
|
09-23-2010
|
4.00
|
prepare center section for riveting
|
Details
|
|
|
09-22-2010
|
8.00
|
priming 4130 reinforcing plates
|
Details
|
|
|
09-20-2010
|
8.00
|
center section spar carrythrough
|
Details
|
|
|
09-19-2010
|
6.00
|
center section spar carry-through
|
Details
|
|
|
09-18-2010
|
4.00
|
rivet cutting
|
Details
|
|
|
09-17-2010
|
2.00
|
test section spar simulator
|
Details
|
|
|
09-17-2010
|
2.00
|
practicing with the rivet squeezer
|
Details
|
|
|
09-14-2010
|
2.00
|
polished components of center section
|
Details
|
|
|
09-12-2010
|
4.00
|
wing rib attachment angles cutout
|
Details
|
|
|
09-12-2010
|
4.00
|
spar caps intermediate shaping
|
Details
|
|
|
09-10-2010
|
5.00
|
rough cutout of last 4130 plate, sixth taper cut s
|
Details
|
|
|
09-09-2010
|
4.00
|
another 4130 reinforcing plate and 12 angles
|
Details
|
|
|
09-06-2010
|
3.00
|
reinforcing plates of 4130 steel
|
Details
|
|
|
09-05-2010
|
3.00
|
tracing and cutting out bulkhead patterns
|
|
|
|
09-04-2010
|
4.00
|
tracing and cutting out patterns
|
Details
|
|
|
09-04-2010
|
8.00
|
debur and polish edges of spar webs
|
Details
|
|
|
09-03-2010
|
4.00
|
cut out spar webs
|
Details
|
|
|
09-03-2010
|
4.00
|
cut out patterns for bulkhead parts
|
Details
|
|
|
09-02-2010
|
2.00
|
bring home 0.040 sheet
|
Details
|
|
|
09-01-2010
|
2.00
|
fifth taper cut on spar cap
|
Details
|
|
|
09-01-2010
|
3.00
|
bringing home aluminimum sheet
|
Details
|
|
|
08-30-2010
|
2.00
|
nose rib blank forms
|
Details
|
|
|
08-28-2010
|
3.00
|
4130 steel for wing attach fittings
|
Details
|
|
|
08-27-2010
|
2.00
|
cut out rib forms and trace onto plywood
|
|
|
|
08-22-2010
|
3.00
|
fourth taper cut on spar cap plus spacers
|
Details
|
|
|
08-21-2010
|
3.00
|
third taper cut on spar cap plus spacer cutout
|
Details
|
|
|
08-20-2010
|
2.00
|
second taper cut on spar cap
|
Details
|
|
|
08-19-2010
|
2.00
|
first taper cut on spar cap
|
Details
|
|
|
08-18-2010
|
1.50
|
Material procurement
|
Details
|
|
|
08-18-2010
|
1.00
|
cut to size spar bar
|
Details
|
|
|
08-13-2010
|
4.00
|
spar assembly jig
|
Details
|
|