KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
Work Logs Found: 296
Category Work Time: 582 Hours
 Date
Hours
Work Log Summary

Details

 09-11-2011
3.50
Match Drilling the Flap Upper Skins to the Ribs, S
Details
       

 09-11-2011
3.50
Drilling the Upper Flap Skin
Details
       

 09-10-2011
2.00
Fabricating the Wing Flaps
Details
       

 09-10-2011
2.00
Fabricating the Wing Flaps
Details
       

 09-10-2011
2.00
Fabricating the Wing Flaps
Details
       

 09-10-2011
2.00
Fabricating the Wing Flaps
Details
       

 09-05-2011
3.00
Wing Flap Fabrication and Assembly
Details
       

 09-05-2011
3.00
Fabricating Wing Flap Components
Details
       

 09-05-2011
2.00
Fabricating the Flaps
Details
       

 09-04-2011
3.00
Fabricating Wing Flap Components
Details
       

 09-04-2011
3.00
Fabricating Flap Cmponents
Details
       

 09-04-2011
1.50
Fabricating Wing Flap Components
Details
       

 09-03-2011
3.00
Deburring Aft Spar Components and Starting the Fla
Details
       

 08-21-2011
0.50
Match Drilling the Aileron Brackets
Details
       

 08-20-2011
4.00
Cutting the Mid-Spar Aileron Bracket Control Rod C
Details
       

 08-19-2011
3.50
Match Drilling the Left Aft Spar
Details
       

 08-19-2011
3.50
Match Drilling the Aft Spar
Details
       

 08-14-2011
2.50
Working on the Aft Spar
Details
       

 08-14-2011
2.50
Aft Spar Aileronn Doubler Match Drilling
Details
       

 08-13-2011
2.00
Working the Aft Spar
Details
       

 08-13-2011
2.00
Working the Aft Spar
Details
       

 08-13-2011
2.00
Working on the Aft Spar
Details
       

 08-07-2011
2.00
Working the Aft Spar
Details
       

 08-05-2011
2.00
Working the Aft Spar
Details
       

 07-31-2011
1.50
Working on the Aft Spar
Details
       

 07-31-2011
1.50
Working on the Aft Spar
Details
       

 07-16-2011
1.00
Preparing for Landing Lights
Details
       

 07-16-2011
1.00
Preparing for Landing Lights
Details
       

 06-25-2011
2.00
Preparing for Landing Lights
Details
       

 06-25-2011
2.00
Preparing for Landing Lights
Details
       

 06-25-2011
2.50
Preparing for Landing Lights
Details
       

 06-25-2011
1.50
Preparing for Landing Lights
Details
       

 06-12-2011
1.50
Preparing for Landing Lights
Details
       

 06-12-2011
1.50
Preparing for Landing Lights
Details
       

 05-29-2011
2.00
Preparing for Landing Lights
Details
       

 05-29-2011
2.00
Preparing for Landing Lights
       

 05-29-2011
2.00
Preparing for Landing Lights
Details
       

 05-29-2011
0.50
Preparing for Landing Lights
Details
       

 05-27-2011
2.00
Preparing for Landing Lights
Details
       

 05-27-2011
2.00
Preparing for Landing Lights
Details
       

 05-27-2011
2.00
Preparing for Landing Lights
Details
       

 05-22-2011
3.00
Preparing for Landing Lights
Details
       

 05-22-2011
3.00
Preparing for Landing Lights
Details
     

 05-21-2011
2.00
Preparing for Landing Lights
Details
       

 05-21-2011
2.00
Preparing for Landing Lights
Details
       

 05-21-2011
5.00
Preparing for Landing Lights
Details
     

 05-16-2011
1.00
Preparing for Landing Lights
Details
       

 05-16-2011
0.50
Preparing for Landing Lights
Details
     

 05-15-2011
2.00
Preparing for Landing Lights
Details
       

 05-15-2011
1.00
Preparing for Landing Lights
Details
       

 05-14-2011
4.00
Preparing for Landing Lights
Details
       

 05-14-2011
3.00
Preparing for Landing Lights
Details
       

 05-08-2011
2.00
Preparing for Landing Lights
Details
       

 05-08-2011
2.00
Preparing for Landing Lights
Details
       

 05-08-2011
1.00
Preparing for Landing Lights
Details
       

 05-08-2011
0.50
Preparing for Landing Lights
Details
       

 05-01-2011
3.00
Preparing for Landing Lights
Details
       

 05-01-2011
3.00
Preparing for Landing Lights
Details
       

 05-01-2011
1.50
Preparing for Landing Lights
Details
       

 04-30-2011
1.50
Preparing for Landing Lights
Details
       

 04-30-2011
1.00
Preparing for Landing Lights
Details
       

 04-28-2011
2.00
Preparing for Landing Lights
Details
       

 04-17-2011
2.00
Preparing for Landing Lights
Details
       

 04-17-2011
0.50
Preparing for Landing Lights
Details
       

 04-17-2011
2.00
Prearing for Landing Lights
Details
       

 04-15-2011
3.00
Preparing for Landing Lights
Details
       

 04-03-2011
2.00
Preparing for Landing Lights
Details
       

 04-03-2011
2.00
Preparing for Landing Lights
Details
       

 04-03-2011
1.00
Preparing for Landing Lights
Details
       

 04-02-2011
1.00
Preparing for Landing Lights
Details
       

 04-02-2011
0.50
Preparing for Landing Lights
Details
     

 03-12-2011
1.50
Preparing for Landing Lights
Details
       

 03-06-2011
2.00
Preparing for Landing Lights
Details
       

 03-04-2011
0.75
Preparing for Landing Lights
Details
       

 02-20-2011
2.00
Preparing for Landing Lights
Details
       

 02-20-2011
1.50
Preparing for Landing Lights
Details
       

 02-19-2011
4.00
Preparing for Landing Lights
Details
       

 02-18-2011
1.25
Preparing for Landing Lights
Details
       

 02-18-2011
1.25
Preparing for Landing Lights
Details
       

 02-13-2011
1.25
Preparing for Landing Lights
Details
       

 02-13-2011
1.25
Preparing for Landiing Lights
Details
       

 02-06-2011
2.50
Preparing for Landing Lights
Details
       

 02-06-2011
2.50
Preparing for Landing Lights
Details
       

 02-05-2011
2.50
Preparing for Landing Lights
Details
       

 02-05-2011
2.50
Preparing for Landing Lights
Details
       

 11-13-2010
4.50
Preparing for Landing Lights
Details
       

 10-30-2010
2.50
Preparing for Landing Lights
Details
       

 10-09-2010
2.00
Preparing for Landing Lights
Details
       

 10-09-2010
2.00
Preparing for Landing Lights
Details
       

 10-09-2010
2.00
Preparing for Landing Lights
Details
       

 10-03-2010
1.50
Preparing for Landing Lights
Details
       

 10-03-2010
1.50
Preparing for Landing Lights
Details
       

 10-02-2010
2.50
Preparing for Landing Lights
Details
       

 09-25-2010
4.00
Preparing for Landing Lights
Details
       

 09-19-2010
2.00
Preparing for Landing Lights
Details
       

 09-18-2010
1.00
Preparing for Landing Lights
Details
       

 09-12-2010
2.50
Preparing for Landing Lights
Details
       

 09-11-2010
1.00
Preparing for Landing Lights
Details
       

 09-10-2010
2.00
Preparing for Landing Lights
Details
       

 09-10-2010
2.00
Preparing for Landing Lights
Details
       

 09-10-2010
1.00
Preparing for Landing Lights
Details
       

 09-06-2010
1.50
Preparing for Landing Lights
Details
     

 09-05-2010
3.00
Preparing for Landing Lights
Details
       

 09-04-2010
2.00
Preparing for Landing Lights
Details
       

 09-04-2010
2.00
Preparing for Landing Lights
Details
       

 09-03-2010
4.00
Preparing for Landing Lights
Details
       

 08-29-2010
2.00
Preparing for Landing Lights
Details
       

 08-22-2010
3.00
Preparing for Landing Lights
Details
       

 08-22-2010
3.00
Preparing for Landing Lights
Details
       

 08-21-2010
2.00
Preparing for Landing Lights
Details
       

 08-20-2010
2.00
Preparing for Landing Lights
Details
       

 08-20-2010
2.00
Preparing for Landing Lights
Details
       

 08-15-2010
2.00
Preparing for Landing Lights
Details
       

 08-15-2010
1.00
Preparing for Landing Lights
Details
       

 08-15-2010
1.00
Preparing for Landing Lights
Details
       

 07-25-2010
3.00
Preparing for the Stall Warning Kit
Details
       

 07-25-2010
3.00
Preparing for the Stall Warning Kit
Details
       

 07-23-2010
1.00
Preparing for the Stall Warning Kit
Details
       

 07-23-2010
1.00
Preparing for the Stall Warning Kit
Details
       

 07-23-2010
1.00
Preparing for the Stall Warning Kit
Details
       

 07-23-2010
0.50
Preparing for the Stall Warning Kit
Details
       

 07-18-2010
1.00
Preparing for the Stall Warning Kit
Details
       

 07-18-2010
1.00
Preparing for the Stall Warning Kit
Details
       

 07-18-2010
0.50
Preparing for the Stall Warning Kit
Details
       

 06-29-2010
0.50
Preparing for the Stall Warning Kit
Details
       

 06-29-2010
0.50
Preparing for the Stall Warning Kit
Details
       

 06-27-2010
3.00
Preparing for the Stall Warning Kit
Details
       

 06-26-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 06-26-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-23-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-23-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-23-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-23-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-23-2010
1.50
Preparing for the Stall Warning Kit
Details
       

 05-22-2010
2.50
Preparing the Wing Leading Edges
Details
       

 05-22-2010
2.50
Preparing the Wing Leading Edges
Details
       

 05-15-2010
4.00
Building the Wing Leading Edges
Details
       

 04-16-2010
5.00
Straightening and Fluting the Wing Ribs
Details
       

 03-19-2010
2.00
Straightening and Fluting the Wing Ribs
Details
       

 03-14-2010
1.00
Straightening and Fluting the Wing Ribs
Details
       

 03-14-2010
1.00
Straightening and Fluting the Ribs
Details
       

 03-14-2010
1.00
Straightening and Fluting the Ribs
Details
     

 03-12-2010
3.00
Straightening and Fluting the Wing Ribs
Details
       

 03-12-2010
3.00
Deburring the Wing Ribs
Details
       

 03-07-2010
3.00
Deburring the Wing Ribs
Details
       

 02-06-2010
1.00
Deburring the Wing Ribs
Details
       

 01-10-2010
4.00
Deburring the Wing Ribs
Details
       

 01-06-2010
3.00
Deburring the Wing Ribs
Details
       

 01-06-2010
3.00
Deburring the Wing Ribs
Details
       

 01-03-2010
2.00
Preparing the Wing Ribs
Details
       

 01-03-2010
2.00
Preparing the Right Wing Spar Caps
Details
       

 01-03-2010
2.00
Deburring the Wing Ribs
Details
       

 01-02-2010
1.50
Preparing the Right Wing Spar Caps
Details
       

 01-02-2010
1.50
Preparing the Right Wing Spar Caps
Details
       

 01-01-2010
1.00
Preparing the Right Wing Spar Caps
Details
       

 01-01-2010
1.00
Preparing the Right Wing Spar Caps
Details
       

 01-01-2010
1.00
Preparing the Right Wing Spar Caps
Details
       

 01-01-2010
0.50
Preparing the Right Wing Spar Caps
Details
       

 12-18-2009
1.50
Preparing the Left Wing Spar Caps
Details
       

 12-18-2009
1.50
Preparing the Left Wing Spar Caps
Details
       

 09-27-2009
1.50
Preparing the Left Wing Spar Caps
Details
       

 09-27-2009
1.50
Preparing the Left Wing Spar Caps
Details
       

 09-27-2009
1.00
Preparing the Left Wing Spar Caps
Details
       

 09-19-2009
2.00
Preparing the Left Wing Spar Caps
Details
       

 08-21-2009
0.50
Preparing the Left Wing Spar Caps
Details
       

 08-21-2009
0.50
Preparing the Left Wing Spar Caps
Details
       

 07-23-2009
2.00
Building the Wings
Details
       

 06-26-2009
1.50
Assembling the Empenage
Details
       

 06-26-2009
2.50
Assembling the Elevators
Details
       

 06-26-2009
1.50
Assembling the Elevators
Details
       

 06-21-2009
2.50
Assembling the Elevators
Details
       

 06-21-2009
2.50
Assembling the Elevators
Details
       

 06-13-2009
1.00
Assembling the Empenage
Details
       

 06-13-2009
0.50
Assembling the Elevators
Details
     

 06-12-2009
2.00
Assembling the Elevator
Details
     

 06-07-2009
2.00
Assembling the Elvators
Details
       

 06-07-2009
2.00
Assembling the Elevators
Details
       

 06-07-2009
2.00
Assembling the Elevators
Details
       

 05-31-2009
1.00
Assembling the Elevators
Details
       

 05-31-2009
1.00
Assembling the Elevators
Details
       

 05-24-2009
1.00
Assembling the Elevators
Details
       

 05-24-2009
1.00
Assembling the Elevators
Details
       

 05-23-2009
0.50
Assembling the Elevators
Details
       

 05-23-2009
0.50
Assembling the Elevators
Details
       

 05-17-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
1.00
Assembling the Elevators
Details
       

 04-26-2009
2.50
Assembling the Elevators
Details
       

 04-19-2009
3.00
Assembling the Elevators
Details
       

 04-19-2009
3.00
Assembling the Elevators
Details
       

 04-18-2009
4.00
Preparing the Elvators
Details
       

 04-10-2009
2.50
Preparing the Elevators
Details
       

 04-10-2009
2.50
Preparing the Elevators
Details
       

 04-05-2009
4.00
Preparing the Elevators
Details
       

 04-04-2009
4.00
Preparing the Elevators
Details

 04-03-2009
1.00
Preparing the Right Elevator
Details
       

 04-01-2009
1.00
Preparing the Left Elevator
Details
       

 03-21-2009
2.00
Preparing the Left Elevator
Details
       

 03-21-2009
2.00
Preparing the Left Elevator
Details
       

 03-20-2009
3.00
Preparing the Left Elevator
Details
       

 03-15-2009
2.00
Preparing the Left Elevator
Details
       

 03-01-2009
2.00
Preparing the Left Elevator
Details
     

 02-28-2009
2.50
Preparing the Left Elevator
Details
       

 02-28-2009
2.00
Preparing the Left Elevator
Details
       

 02-08-2009
2.00
Preparing the Left Elevator
Details
     

 01-24-2009
1.00
Preparing the Left Elevator
Details
       

 01-24-2009
1.00
Preparing the Left Elevator
Details
     

 01-18-2009
1.00
Preparing the Left Elevator
Details
       

 01-11-2009
3.00
Preparing the Left Elevator
Details
       

 01-10-2009
2.00
Preparing the Left Elevator
Details
       

 01-10-2009
2.00
Preparing the Left Elevator
Details
       

 11-14-2008
1.50
Preparing the Left Elevator
Details
       

 11-14-2008
1.50
Preparing the Left Elevator
Details
       

 11-01-2008
1.00
Preparing the Right Elevator
Details
       

 10-31-2008
3.00
Preparing the Right Elevator
Details
       

 10-31-2008
2.00
Preparing the Right Elevator
Details
       

 10-25-2008
2.00
Preparing the Elevators
Details
       

 10-19-2008
1.00
Preparing the Elevators
Details
       

 10-17-2008
1.00
Preparing the Elevators
Details
       

 10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-05-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-05-2008
1.00
Riveting the Vertical Stabilizer
Details
       

 10-04-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 09-14-2008
0.50
Riveting the Rudder
Details
       

 09-14-2008
2.00
Riveting the Rudder
Details
       

 09-14-2008
1.00
Riveting the Rudder
Details
     

 09-13-2008
3.00
Riveting the Rudder
Details
       

 09-13-2008
2.00
Riveting the Rudder
Details
       

 09-13-2008
1.00
Riveting the Rudder
Details
       

 09-07-2008
3.00
Riveting the Rudder
Details
       

 09-07-2008
2.00
Riveting the Rudder
Details
       

 09-07-2008
2.00
Riveting the Rudder
Details
       

 09-06-2008
3.00
Riveting the Rudder
Details
       

 09-01-2008
3.00
Riveting the Horizontal Stabilizer
Details
       

 09-01-2008
2.00
Riveting the Horizontal Stabilizer
Details
       

 08-31-2008
1.00
Riveting the Horizontal Stabilizer
Details
       

 08-31-2008
4.00
Riveting the Horizontal Stabilizer
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 4
Details
       

 08-30-2008
5.00
Riveting the Horizontal Stabilizer 3
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 2
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 1
Details
       

 08-24-2008
3.00
Riveting the Empenage
Details
       

 08-23-2008
1.00
Riveting the Empenage
Details
       

 08-17-2008
1.50
Riveting the Empenage
Details
       

 08-10-2008
1.00
Riveting the Empenage
Details
     

 08-09-2008
2.00
Priming the Empenage
Details
       

 08-03-2008
2.50
Priming the Empenage, continued
Details
       

 08-03-2008
0.50
Priming the Empenage
Details
       

 08-02-2008
2.00
Painting the Empenage
Details
       

 07-28-2008
2.00
Priming the Empenage
Details
       

 07-27-2008
2.00
Priming the Empenage
Details
       

 07-17-2008
2.00
Building the Empenage
Details
       

 06-14-2008
2.00
Building the Rudder
Details
       

 06-14-2008
2.00
Building the Rudder
Details
       

 06-08-2008
2.00
Building the Rudder
Details
       

 06-07-2008
2.00
Building the Rudder
Details
       

 05-30-2008
2.00
Building the Rudder
Details
     

 04-29-2008
0.10
Quick Build Fuselage & Slow Build Wing kits Arrive
Details
       

 04-12-2008
1.00
Building the Empenage
Details
       

 04-12-2008
1.00
Building the Empenage
Details
       

 03-30-2008
1.00
Building the Empenage
Details
     

 03-22-2008
2.00
Building the Empenage
Details
       

 03-09-2008
3.00
Building the Rudder
Details
       

 02-24-2008
3.00
Building the Horizontal Stabilizer
Details
     

 02-18-2008
1.00
Building the Rudder
Details
       

 02-17-2008
1.00
Building the Rudder
Details
       

 02-11-2008
1.00
Building the Rudder
Details
       

 02-10-2008
3.00
Building the Rudder
Details
       

 02-10-2008
2.00
Building the Rudder
Details
       

 02-09-2008
2.00
Building the Rudder
Details
       

 02-08-2008
2.00
Building the Rudder
Details
       

 02-08-2008
2.00
Building the Rudder
Details
       

 02-03-2008
4.00
Building the Rudder
Details
       

 01-27-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 01-25-2008
1.00
Drilling the Vertical Stabilizer
Details
       

 01-20-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 01-01-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 12-16-2007
3.00
Drilling the Horizontal Stabilizer
Details
       

 12-15-2007
3.00
Drilling the Horizontal Stabilizer
Details
       

 12-08-2007
5.00
Drilling the Horizontal Stabilizer
Details
       

 12-02-2007
4.00
Drilling the Horizontal Stabilizer
Details
       

 12-01-2007
3.00
Preparing the Ribs
Details
     

 12-01-2007
3.50
Drilling the Horizontal Stabilizer
Details
       

 11-25-2007
1.00
Front Spar Assembly
Details
     

 11-10-2007
3.00
Replacement Parts Arrive
Details
     

 11-03-2007
2.00
Front Spar Assembly
Details
       

 11-03-2007
3.00
Front Spar Assembly
Details
       

 11-02-2007
2.00
Deburring parts and Front Spar Assembly
Details
       

 10-27-2007
3.00
Rear Spar Assembly
Details
       

 10-20-2007
2.00
Rear Spar Assembly
Details
       

 10-20-2007
3.00
Rear Spar Assembly
Details
       

 02-18-2007
1.00
Picked up 2nd Empenage Box and Inventoried parts
Details
       

 02-12-2007
1.00
Picked up 1st Box from FedEx
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.