N2724G RV9 Build Log
RV-9A
All
Work Logs Found:
524
Category Work Time:
2142 Hours
Date
Hours
Work Log Summary
Details
01-30-2010
13.00
Fairing Alignment
Details
01-28-2010
3.00
Nose Gear Fairing
Details
01-27-2010
7.75
Wheel Pants
Details
01-25-2010
4.00
Wheel Pants
Details
01-23-2010
9.00
Right Wheel Pant
Details
01-22-2010
2.00
Wheel Pants
Details
01-17-2010
10.00
Panel Work
Details
01-16-2010
10.00
Fiberglass
Details
01-15-2010
3.00
Leg Fairings
Details
01-13-2010
3.00
Leg Fairings
Details
01-11-2010
3.00
Glass Work
Details
01-10-2010
4.00
Side LEDs
Details
01-09-2010
20.00
Avionics & Panel
Details
12-29-2009
10.00
Misc
Details
12-27-2009
8.00
Wiring
Details
12-24-2009
3.00
Misc
Details
12-23-2009
2.00
Panel Connections
Details
12-22-2009
5.00
Side Vents in Panel
Details
12-20-2009
6.00
Tip Lenses
Details
12-19-2009
10.00
Wing Tips
Details
12-14-2009
1.50
Engine Work
Details
12-13-2009
3.00
Wing Tips
Details
12-08-2009
16.00
Wing Tips
Details
12-02-2009
4.00
Landing Light
Details
11-23-2009
11.00
Right Wing
Details
11-22-2009
12.00
Riveted Lower Skins
Details
11-21-2009
12.00
Bottom Wing Skins
Details
11-19-2009
4.00
Bottom Wing Skins
Details
11-18-2009
5.00
Right Wing Cutout
Details
11-17-2009
6.00
Left Wing Landing Light
Details
11-11-2009
1.50
Wing Tips
Details
11-10-2009
1.50
Wiring
Details
11-08-2009
3.00
Auto Pilot
Details
11-07-2009
10.00
Pitot Mast
Details
10-31-2009
3.00
Wing Wiring
Details
10-29-2009
12.00
MIsc ENgine Work
Details
10-27-2009
4.00
Avionics Wiring
Details
10-26-2009
5.00
Throttle Cable
Details
10-25-2009
5.00
Wiring
Details
10-24-2009
6.00
Cowl Work
Details
10-22-2009
6.00
Lower Cowl
Details
10-19-2009
2.00
Cowl Inlet
Details
10-18-2009
5.00
EGT Sensors
Details
10-17-2009
4.00
FAB
Details
10-16-2009
7.00
Oil Cooler
Details
10-13-2009
1.00
FAB
Details
10-11-2009
5.00
Filtered Airbox
Details
10-07-2009
3.00
Baffles
Details
10-06-2009
6.00
Baffle Completion
Details
10-04-2009
8.00
Baffle Seals
Details
10-02-2009
2.50
Upper Cowl Fiberglass
Details
09-30-2009
4.00
Cowl Work
Details
09-29-2009
8.00
Baffle Riveting
Details
09-28-2009
4.00
Baffles
Details
09-26-2009
10.00
Baffles
Details
09-25-2009
4.00
Baffles
Details
09-24-2009
2.00
Cowl Ramps
Details
09-23-2009
5.00
Baffles
Details
09-22-2009
4.00
Baffles
Details
09-21-2009
3.00
Baffling
Details
09-20-2009
12.00
Baffling Oil Cooler??
Details
09-19-2009
12.00
Cowl to Fuselage
Details
09-18-2009
12.00
Cowl Work
Details
09-17-2009
3.00
Cowl Hinges
Details
09-16-2009
4.00
Cowl Hinges
Details
09-15-2009
3.00
Cowl Hinges
Details
09-13-2009
8.00
Cowl Hinges
Details
09-11-2009
5.00
Cowling
Details
09-10-2009
5.00
Cowl Fitting
Details
09-02-2009
21.00
Misc Finish Work
Details
09-01-2009
2.00
Engine Review
Details
08-30-2009
8.00
Fiberglass
Details
08-27-2009
2.00
Seats Fitting
Details
08-23-2009
8.00
Wheel Pants & Wiring
Details
08-22-2009
8.00
Baffling Wheel Pants?
Details
08-19-2009
2.50
Baffling
Details
08-18-2009
4.00
Engine Baffling
Details
08-17-2009
1.50
Engine Baffling
Details
08-16-2009
6.00
Panel Testing
Details
08-15-2009
8.00
Panel Work
Details
08-14-2009
10.00
Panel Work
Details
08-13-2009
8.00
Panel Work
Details
08-12-2009
10.00
Panel Work
Details
08-10-2009
6.00
Panel Work
Details
08-09-2009
6.00
Panel Work
Details
08-05-2009
5.00
Panel Work
Details
07-19-2009
2.50
Fit Panel
Details
07-16-2009
3.75
Antennas
Details
07-15-2009
4.50
Panel
Details
07-12-2009
10.00
Panel
Details
07-11-2009
8.00
Fiberglass
Details
07-05-2009
5.00
Panel Prep
Details
07-05-2009
10.00
Fiberglass Prep
Details
07-04-2009
5.00
Wiring
Details
07-03-2009
6.00
Flap Sensor
Details
07-02-2009
2.50
Throttle Subpanel
Details
07-01-2009
4.50
Firewall Forward Stuff
Details
06-30-2009
3.50
Panel
Details
06-28-2009
4.00
More Cowl Work
Details
06-27-2009
14.00
Panel & Wiring
Details
06-27-2009
8.00
More Fiberglass Prep
Details
06-22-2009
3.00
Wiring
Details
06-21-2009
9.00
Another Multi-Tasking Day
Details
06-16-2009
1.50
Wired CHT Sensors
Details
06-15-2009
2.00
Pressure Switches
Details
06-14-2009
10.00
Engine Work
Details
06-08-2009
3.00
Superfill
Details
06-07-2009
12.00
Panel Work
Details
06-06-2009
7.00
Panel Work
Details
06-05-2009
6.00
Exhaust System Install
Details
06-04-2009
5.00
Panel Work
Details
06-02-2009
3.50
Cowl Prep
Details
05-31-2009
7.00
Details
05-30-2009
3.00
Avionics
Details
05-29-2009
6.00
Fuel Lines
Details
05-28-2009
4.00
Panel Work
Details
05-27-2009
2.50
Avionics
Details
05-26-2009
5.00
Panel work
Details
05-25-2009
8.00
Multi-Tasking
Details
05-24-2009
4.00
Panel / Engine
Details
05-23-2009
4.00
Panel Work
Details
05-23-2009
5.00
Mounted engine
Details
05-22-2009
3.00
Engine Prep
Details
05-21-2009
3.00
Panel Work
Details
05-20-2009
1.00
Panel
Details
05-19-2009
2.50
Panel
Details
05-17-2009
6.00
Panel Work
Details
05-16-2009
5.00
Gear
Details
05-15-2009
4.00
Tires & Brakes
Details
05-12-2009
2.50
Brakes
Details
05-11-2009
5.00
Gear Legs
Details
05-08-2009
2.00
Skirt
Details
05-07-2009
5.00
Canopy Skirt
Details
05-06-2009
2.00
Skirt/Panel
Details
05-05-2009
2.50
Skirt Work
Details
05-03-2009
6.00
Skirt & Panel
Details
05-02-2009
4.50
Reglassed Aft Skirt
Details
05-01-2009
2.00
Panel Holes
Details
04-29-2009
2.00
Aft Skirt
Details
04-13-2009
2.00
Skirt / Tire
Details
04-11-2009
5.00
Motor Mount
Details
04-10-2009
3.00
Skirt
Details
04-09-2009
2.00
Skirt
Details
04-08-2009
1.50
Started Panel
Details
04-07-2009
2.00
Canopy Skirt
Details
04-06-2009
1.50
Hoses
Details
04-05-2009
5.00
Skirt work and Firewall
Details
04-05-2009
5.00
Firewall
Details
04-04-2009
3.50
Glassed Aft Skirt
Details
04-03-2009
4.00
Aft Skirt
Details
03-31-2009
5.00
Canopy Skirts
Details
03-30-2009
4.00
Side Canopy Skirts
Details
03-29-2009
3.50
Canopy Skirts
Details
03-28-2009
9.00
Canopy
Details
03-27-2009
6.00
Canopy Latch
Details
03-25-2009
4.00
Slide Track
Details
03-24-2009
2.00
Canopy
Details
03-22-2009
5.00
Canopy Drilling
Details
03-21-2009
3.00
Canopy
Details
03-19-2009
5.00
Canopy Holes
Details
03-18-2009
3.00
Canopy
Details
03-17-2009
4.00
Canopy
Details
03-16-2009
2.00
Canopy
Details
03-15-2009
8.00
Canopy
Details
03-14-2009
4.00
Canopy
Details
03-12-2009
1.50
Wiring
Details
03-11-2009
2.50
Firewall
Details
03-10-2009
2.00
Canopy Frame
Details
03-07-2009
4.00
Panel Supports
Details
03-06-2009
2.00
Vents & Strobes
Details
03-05-2009
4.00
Bent Canopy Frame
Details
03-01-2009
8.00
Aft Top Skin & Frame
Details
02-27-2009
2.00
Canopy Rail
Details
02-24-2009
3.00
Canopy Railes
Details
02-23-2009
3.00
Roll Bar
Details
02-22-2009
5.00
Rollbar
Details
02-21-2009
5.00
Aft Skin
Details
02-18-2009
4.00
Subpanel
Details
02-17-2009
2.00
Primed
Details
02-16-2009
2.00
Primer Prep
Details
02-15-2009
5.00
Top Skins
Details
02-11-2009
4.00
A/P and tubing
Details
02-10-2009
1.50
Auto Pilot
Details
02-08-2009
3.00
Paint interior
Details
02-07-2009
8.00
Inspection Hatch Platenuts
Details
02-06-2009
2.50
Disassembled Tail Section
Details
02-05-2009
2.00
Taking down Empennage
Details
02-04-2009
2.00
Empennage fairing
Details
02-01-2009
3.50
Fiberglass
Details
01-31-2009
2.00
Inspection
Details
01-29-2009
1.50
Fiberglass
Details
01-27-2009
1.00
Fiberglass
Details
01-26-2009
1.50
Fiberglass
Details
01-24-2009
1.50
Fiberglass
Details
01-23-2009
3.50
Details
01-22-2009
2.00
Fiberglass
Details
01-19-2009
1.75
Misc Fiberglass
Details
01-18-2009
3.50
Fiberglass
Details
01-17-2009
2.00
Emp Tips
Details
01-16-2009
2.00
Glass Tips
Details
01-15-2009
2.25
Emp Tips
Details
01-14-2009
2.00
HS Tips
Details
01-14-2009
4.00
Brake Lines
Details
01-13-2009
1.00
Rudder Stops
Details
01-12-2009
3.00
Rudder
Details
01-12-2009
1.00
Fuel Pump
Details
01-11-2009
8.00
Emp Stuff
Details
01-10-2009
2.50
Trim & VS
Details
01-09-2009
2.00
HS & Ele
Details
01-07-2009
2.00
HS
Details
01-06-2009
4.00
Elevator
Details
01-04-2009
1.50
Rudder / VS
Details
01-03-2009
2.00
Emp Layout
Details
01-02-2009
4.50
Wings
Details
01-01-2009
7.25
Fuel Supply Lines & MIsc
Details
12-31-2008
1.50
Tank Attach Brackets
Details
12-29-2008
3.50
Left Flap
Details
12-28-2008
4.00
Fuel Vents / Flaps
Details
12-27-2008
5.00
Left Wing
Details
12-27-2008
5.00
Ailerons
Details
12-26-2008
4.00
Right Wing
Details
12-24-2008
1.00
Fuel Pump Work
Details
12-23-2008
2.50
Servo Wires
Details
12-22-2008
2.00
Fuel Pump Part Primer Prep
Details
12-21-2008
2.75
Fuel Pump
Details
12-16-2008
3.50
Tank Attach Brackets
Details
12-15-2008
1.50
Static Ports
Details
12-14-2008
4.00
Flaps
Details
12-13-2008
4.50
Primed
Details
12-12-2008
1.50
Primer Prep
Details
12-11-2008
3.50
Aileron Trim
Details
12-10-2008
1.50
Flap Pushrods
Details
12-09-2008
3.50
Inventoried Finish Kit
Details
12-09-2008
2.50
Crotch Brackets
Details
12-07-2008
3.75
Control Stick
Details
12-06-2008
4.50
Fuel Tank Vents & Brake Lines
Details
12-05-2008
1.00
Fuel Vent Lines
Details
12-04-2008
3.00
Forward Section
Details
12-03-2008
1.50
Forward Section
Details
12-02-2008
1.50
Forward Assembly
Details
12-01-2008
3.00
Forward Panel Supports
Details
11-30-2008
3.50
Gear Mounts
Details
11-23-2008
6.75
Flaps & Gear Mount
Details
11-22-2008
3.00
Seats
Details
11-22-2008
4.50
First RV Grin!
Details
11-21-2008
1.00
Seat Floors
Details
11-20-2008
2.50
Primed
Details
11-19-2008
2.50
Primer Prep
Details
11-18-2008
3.00
Primer Prep
Details
11-17-2008
1.50
Crotch Brackets
Details
11-16-2008
6.50
Seat Fabrication
Details
11-15-2008
6.00
Tunnel Supports
Details
11-15-2008
4.00
Baggage Floors
Details
11-14-2008
6.00
Steps & Seats
Details
11-09-2008
6.25
Primed
Details
11-08-2008
2.50
Baggage Floor Mod
Details
11-04-2008
1.00
Left Floor Panel
Details
11-03-2008
4.00
Baggage Floor Mod
Details
11-02-2008
7.75
Baggage Bukhead
Details
11-01-2008
0.00
Helped Webb
Details
10-31-2008
0.00
Halloween
Details
10-30-2008
4.00
Baggage Bulkhead
Details
10-29-2008
2.50
Steps
Details
10-28-2008
3.25
Top Skins
Details
10-27-2008
3.75
Armrest & J-Stringers
Details
10-19-2008
4.00
Riveted Canopy Decks
Details
10-16-2008
2.00
Riveted Floor Ribs
Details
10-15-2008
5.00
Riveted Aft Skins and Stuff
Details
10-14-2008
2.00
Bellcrank & Gussets
Details
10-13-2008
2.00
Riveted Brake Parts
Details
10-12-2008
3.00
Primer Prep
Details
10-08-2008
2.50
Bellcrank Parts & Top Skin
Details
10-07-2008
1.75
Forward Gussets
Details
10-06-2008
2.25
Gussets & Side Rails
Details
10-02-2008
4.00
ROLLED THE CANOE!
Details
10-01-2008
4.00
Riveting Skins
Details
09-29-2008
4.00
Side Skins
Details
09-28-2008
7.50
More Skin Riveting
Details
09-27-2008
4.25
Riveted Side Skins
Details
09-26-2008
8.00
Riveted Left Side & More
Details
09-24-2008
4.50
Riveted Right Side Gussets
Details
09-22-2008
3.50
Re-attached skins
Details
09-17-2008
3.50
Center Section Re-assembly
Details
09-10-2008
6.00
Primed
Details
09-08-2008
1.50
Dimpled Skins
Details
09-08-2008
2.50
Bellcrank Parts
Details
09-02-2008
1.00
Deburred / Scuffed Longerons
Details
09-01-2008
1.00
Dimpled Parts
Details
08-31-2008
2.50
Dimpled Parts
Details
08-30-2008
1.50
More Primer Prep
Details
08-27-2008
4.00
More Primer Prep
Details
08-26-2008
3.00
Primer Prep
Details
08-24-2008
6.00
Primer Prep
Details
08-23-2008
8.00
Primer Prep
Details
08-23-2008
1.00
Deburred
Details
08-22-2008
4.00
Started Primer Prep
Details
08-21-2008
5.00
Baggage Area
Details
08-20-2008
3.25
Floor Stiffeners
08-10-2008
2.00
Rudder Brackets
Details
08-09-2008
6.00
Rudder Brakes
Details
08-08-2008
4.00
Skins to Longerons
Details
08-07-2008
1.25
Fabricated 996B & C
Details
07-21-2008
3.00
Finished Gussets
Details
07-20-2008
0.50
Worked on 684 Gussets
Details
07-19-2008
1.75
Lower Longerons
Details
07-14-2008
2.50
Skin Stiffeners
Details
07-12-2008
2.00
Drilled Aux Longerons
Details
07-10-2008
3.00
Misc Center Section
Details
07-08-2008
4.00
Drilled All Skins to Longerons
Details
07-06-2008
4.00
Removed Skins & Bent Lower Aft End
Details
07-05-2008
6.00
Connected Center Section
Details
07-05-2008
3.00
Attached Forward Skins
Details
07-04-2008
4.00
Riveted Rremainder of Bottom Skin
Details
07-03-2008
6.00
Riveted Ribs & Clecoed Bottom Skins
Details
07-01-2008
5.00
Began Final Assembly of Center Section
Details
06-30-2008
3.50
Primed
Details
06-29-2008
4.00
More Primer Prep
Details
06-28-2008
4.00
More Primer Prep
Details
06-27-2008
4.50
Primer Prep
Details
06-26-2008
3.00
Side Doublers & Step Flanges
Details
06-24-2008
4.00
Drilled Seat & Baggage Ribs
Details
06-23-2008
6.00
Baggage Ribs & Bottom Skin
Details
06-22-2008
2.00
Started Center Section
Details
06-17-2008
3.00
Finishing Riveting Skins
Details
06-16-2008
6.00
Riveting Bottom & Sides
Details
06-14-2008
5.00
Re-Assembled Adt Fuselage
Details
06-13-2008
1.75
Primed
Details
06-12-2008
4.00
Primer Prep
Details
06-11-2008
1.00
Beth Deburred
Details
06-10-2008
5.50
Primer Prep
Details
06-07-2008
5.00
J Stringers
Details
06-06-2008
4.00
Finished Longerons
Details
06-01-2008
6.00
Longeron Bending
Details
05-31-2008
9.00
Bulkhead Riveting
Details
05-30-2008
2.50
Primer Shooting
Details
05-29-2008
4.75
Primer Prep
Details
05-27-2008
2.50
Seat Anchors & Seat Back Attach
Details
05-26-2008
5.00
Stab Attach Bars
Details
05-25-2008
3.00
Aft Bulkhead Prep
Details
05-22-2008
2.00
Bulkhead Work
Details
05-21-2008
1.00
Fluted Bulkhead Parts
Details
05-20-2008
3.50
705 Bulkhead
Details
05-19-2008
4.00
904 Bulkhead Assembly
Details
05-18-2008
2.00
Riveted Fuel Pump Doubles
Details
05-18-2008
5.00
Finished Firewall
Details
05-17-2008
5.00
Primed
Details
05-17-2008
1.50
Cover Support Ribs
Details
05-15-2008
6.00
Finished Primer Prep of Firewall Parts
Details
05-12-2008
6.00
Prepped Firewall Parts for primer
Details
05-11-2008
2.00
Firewall Parts
Details
05-10-2008
1.00
Started Working on Firewall Angles
Details
05-10-2008
7.50
Finished with Wings for now!
Details
05-09-2008
4.00
Aileron Pushrods & Bellcranks
Details
05-08-2008
4.00
Finished Flaps!
Details
05-06-2008
3.50
Left Flap Bottom Skin
Details
05-05-2008
4.00
Right Top Flap Skin
Details
05-04-2008
4.00
Left Flap Top Skin
Details
05-01-2008
5.50
Flap Final Assembly
Details
04-29-2008
2.00
Flap Riveting
Details
04-28-2008
4.50
Primer Prep / Prime
Details
04-27-2008
1.00
Firewall Layout
Details
04-27-2008
2.50
Finished Primer Prep
Details
04-21-2008
2.50
Dimpled Flap Skins
Details
04-20-2008
6.50
Flap Part Primer Prep
Details
04-19-2008
8.00
Flap Prep
Details
04-18-2008
4.00
Drilled Left Flap
Details
04-17-2008
7.00
Inventory Fuselage
Details
04-16-2008
2.25
More Flap Skins
Details
04-16-2008
2.00
Gap Fairings
Details
04-14-2008
1.50
Flap Skins
Details
04-01-2008
3.50
Aileron Hinge Points & Gap Fairings
Details
03-31-2008
2.00
Aileron Trailing Edges
Details
03-30-2008
6.00
Skins on Left Aileron
Details
03-29-2008
4.75
Riveted Aileron Skins
Details
03-29-2008
3.50
Aileron Riveting
Details
03-27-2008
1.00
Flap Nose Ribs
Details
03-25-2008
2.50
Primed Aileron Parts
Details
03-24-2008
1.50
Riveted Aileron Gap Fairings
Details
03-23-2008
4.00
Aileron Primer Prep
Details
03-22-2008
4.50
Aileron Primer Prep
Details
03-21-2008
3.00
Built Up Right Ailreron
Details
03-20-2008
5.00
Built Flat Table
Details
03-19-2008
5.50
More Aileron & Fairing Work
Details
03-18-2008
2.25
Aileron Skin Stiffeners
Details
03-17-2008
3.75
Aileron Skin Priming
Details
03-16-2008
1.00
Riveted on Flap Hinge Brackets
Details
03-16-2008
5.00
Aileron Assembly
Details
03-15-2008
4.00
Primer Time Again
Details
03-15-2008
2.00
Misc Flap & Rear Spar Work
Details
03-10-2008
2.00
Flap Hinges & Fairings
Details
03-09-2008
7.75
Flap Brackets & Fairings
Details
03-08-2008
0.50
Removed Fuel Tank
Details
03-08-2008
5.50
Moved Wings
Details
03-07-2008
4.00
Finished Right Wing SKin
Details
03-05-2008
2.50
More Skin Riveting
Details
03-04-2008
3.50
Right Wing Skin
Details
03-03-2008
1.00
Attached Tank to Wing
Details
03-02-2008
10.50
Tank Baffle
Details
02-25-2008
2.40
Tank Testing
Details
02-21-2008
0.50
Skins to Frame
Details
02-20-2008
6.00
Fixed Compressor & Primed Skins
Details
02-19-2008
3.25
Started Prepping Top Skins for Primer
Details
02-18-2008
2.25
More Tank Prep & Primer Prep
Details
02-16-2008
9.00
End Ribs and Access Plate
Details
02-15-2008
4.60
Prosealed 2 More Ribs & Tube Firrings
Details
02-12-2008
6.50
More Proseal
Details
02-11-2008
3.25
Misc Tank Prep
Details
02-10-2008
0.50
Clecoed the Tank Ribs and Skin in Place
Details
02-09-2008
7.00
EAA TC Inspection & More Proseal
Details
02-09-2008
0.75
Clecoed Aileron Hinge Brackets
Details
02-08-2008
6.00
Right Tank Prep
Details
02-07-2008
4.50
Fixed the Rest of the CherryMax Rivets
Details
02-06-2008
2.50
Put on Right Wing Leading Edge
Details
02-05-2008
2.00
Rebuilt AEX Tiedown
Details
02-04-2008
3.00
Built Wing Cradle
Details
02-03-2008
8.00
Finished Riveting the Top of Skins
Details
02-02-2008
2.50
Rivet More Top Skins
Details
01-31-2008
4.00
Started Riveting Top Skins
01-30-2008
3.25
Attached Tank to Left Frame
Details
01-29-2008
9.50
Proseal Tank Baffle
Details
01-28-2008
2.50
Tank Leak Check
Details
01-27-2008
2.10
Primed Skins
Details
01-26-2008
4.00
Soldered Off Blue Plastic & Deburred Skins
Details
01-26-2008
5.25
Misc Wing Skin Prep
Details
01-25-2008
4.50
Inboard Fuel Tank Rib
Details
01-24-2008
5.00
Outboard Rib & stiffener
Details
01-23-2008
2.60
Capacitive Plate & Fuel Pickup
Details
01-22-2008
2.00
Dimpled Left Wing Ribs
Details
01-22-2008
2.50
Capacitive Sender & Vent Tube Install
Details
01-19-2008
6.00
3 More Ribs
Details
01-18-2008
6.50
Prosealed 2 Left Tank Ribs
Details
01-17-2008
8.00
PROSEAL - YUK!
Details
01-15-2008
3.30
Getting Left Tank Ready for ProSeal
Details
01-15-2008
3.00
Deburring Wing Ribs & Tank Ribs
Details
01-14-2008
2.00
Leading Edge Attach & Tank Prep
Details
01-13-2008
5.20
Riveted Left LE to Spar
Details
01-12-2008
5.60
Riveted LE Skin
Details
01-12-2008
2.50
Misc Wing Prep
Details
01-12-2008
1.10
Countersunk Rear Spar and Primer
Details
01-11-2008
2.60
Right Wing Frame & Misc Tank Work
Details
01-11-2008
1.20
Beth Worked on Counterinking Wing
Details
01-10-2008
1.80
More Frame Prep
Details
01-10-2008
3.30
Left L.E. and Tank Work
Details
01-09-2008
5.00
Riveted Right Wing Leading Edge
Details
01-08-2008
3.50
Misc Leading Edge & Tank Prep
Details
01-08-2008
2.20
Beth Worked on Wing Frame
Details
01-07-2008
1.00
Shop Cleanup / Primer Takedown
Details
01-06-2008
1.50
Primer Prep
Details
01-06-2008
2.30
Primed Leading Edge & Tank Parts
Details
01-06-2008
2.00
Prepared Both Wing/Tank Splice Plates
Details
01-06-2008
2.00
J-Stringer Prep
Details
01-05-2008
5.00
Misc Tank & Leading Edge Work
Details
01-05-2008
4.50
Leading Edge and Tank Prep
Details
01-04-2008
4.50
Right Wing Leading Edge Prep
Details
01-04-2008
3.00
Right Wing Fuel Tank
Details
01-04-2008
3.00
Fabricated Tank Attach Brackets & Nose Doublers
Details
01-03-2008
2.00
Leading Edge - Right Wing
Details
01-02-2008
3.00
More Tank Stuff
Details
01-02-2008
2.00
Clecoed Bottom Skin on Right Wing
Details
01-01-2008
1.00
Right Wing J Stringers
Details
01-01-2008
3.50
More Tank Prep
Details
01-01-2008
2.50
Drilled / Reamed Right Wing Top Skins
Details
12-31-2007
3.50
Wing Stuff
Details
12-30-2007
4.00
Mounted Right Wing
Details
12-30-2007
1.50
More Tank Work
Details
12-29-2007
4.00
Riveted Right Wing Skeleton
Details
12-28-2007
2.00
Primed Right Wing
Details
12-27-2007
4.00
Right Wing Skeleton Assembly
Details
12-26-2007
1.50
Tank Baffle
Details
12-23-2007
1.20
Tank Baffle Prep
Details
12-23-2007
3.50
Leading Edge Fit & Tank Prep
Details
12-22-2007
2.50
Left Leading Edge
Details
12-22-2007
3.50
Bottom Skins
Details
12-21-2007
1.50
J Stringer
Details
12-20-2007
4.50
Top Skins!
Details
12-20-2007
3.50
Riveted Wing Skeleton
Details
12-19-2007
2.50
Primed
Details
12-18-2007
3.00
Finished Scuffing & Wing Stand
Details
12-15-2007
3.20
Match Drilled Ribs and Brokedown Frame
Details
12-15-2007
1.10
Finished Preping Ribs with Scotch Brite Wheel
Details
12-14-2007
2.00
Constructed Right Tiedown
Details
12-12-2007
1.50
Clecoed Wing Frame
Details
12-11-2007
3.00
Inspection Plate and Platenuts
Details
12-10-2007
3.00
Rear Spar Assembly
Details
12-09-2007
3.50
Tie Down Build and Deburring Ribs
Details
12-09-2007
3.00
Rear Spar Primer Prep
Details
12-09-2007
2.00
Primed Rear Spar Components
Details
12-09-2007
2.00
Deburred Ribs
Details
12-08-2007
1.00
Rib Prep
Details
12-08-2007
5.00
Rear Spar Prep
Details
12-07-2007
5.00
Main Spar Prep
Details
12-05-2007
1.50
Started Prepping Ribs
Details
12-05-2007
3.50
Main Spar Tank Platenuts
Details
12-04-2007
1.50
Main Spar Platenut Prep
Details
12-04-2007
4.00
Inventory
Details
11-18-2007
1.00
Remove Blue Plastic and Store
Details
11-17-2007
2.50
Finished Vertical Stabilizer
Details
11-16-2007
2.00
Vertical Stab - Finish Frame, Cleco to Skin
Details
11-15-2007
0.40
VS Frame Assembly
Details
11-15-2007
0.25
Installed Rod End Bearings
Details
11-15-2007
0.75
Fabricated & Installed Counterweights on Left Elev
Details
11-14-2007
0.20
Rod End Bearings - Right Elevator
Details
11-14-2007
1.00
Elevator Counterweight - Right
Details
11-09-2007
3.00
Trim Tab Install on Left Elevator
Details
11-09-2007
3.00
Rudder Final Assembly
Details
11-09-2007
2.50
Right Elevator Final Assembly
Details
11-09-2007
2.50
Left Elevator Final Assembly
Details
11-09-2007
57.00
Beths Time at Alexanders
11-08-2007
2.00
HS - Final Frame Assembly
Details
11-08-2007
3.00
HS - Completion
Details
11-08-2007
6.00
HS - Attaching Skin
Details
11-07-2007
4.00
VS - Assembly
Details
11-07-2007
2.00
Elevator - Primer Prep
Details
11-07-2007
8.00
Elevator - L & R Pre-assembly
Details
11-06-2007
5.50
Rudder - Skins and Skeleton
Details
11-06-2007
3.50
HS - Dimple / Countersink / Deburr
Details
11-06-2007
1.50
Elevator - Layout
Details
11-05-2007
1.00
Rudder - Stiiffeners
Details
11-05-2007
0.50
HS - Disassemble to clean up
Details
11-05-2007
2.50
Horizontal Stabilizer - Skins / Rear Spar
Details
11-05-2007
3.00
Horizontal Stabilizer - Skelaton
Details
11-05-2007
1.00
Horizontal Stabilizer - Attach Angles
Details
11-05-2007
2.50
Alexander's - Training and Inventory
Details
09-27-2007
0.10
Ordered Tail Kit & Wings
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
524
2143
Avionics
40
227
Empennage
56
195
Engine
36
182
Fuselage
224
908
Miscellaneous
3
0
Wings
165
631
Copyright © 2001-2024 Matronics. All Rights Reserved.